647
|
Thursday, October 05, 2023, 12:47 |
Aaron Schmidt | Ta | 45220-3 | LP-SIS | In progress | Conditioning Ta#68 (Spare) | Ta#(Spare) LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured.
Target material batch: Ta 2023-1 Mt'l PO# TR-2022-03028
Target density = 12.515 g/cm3
Target length = 4.97 cm
Total Mass = 62.202 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven = 461g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Was labelled Ta#67 until the Thin foil target 45447-14 became so.
Thursday, October 05, 2023, 12:44: Roughing.
Thursday, October 05, 2023, 13:10; TP1 on.
Thursday, October 05, 2023, 13:11: TGHT / TBHT test. Tap up to 5 / 5 A & back to 0 A. Ok.
Thursday, October 05, 2023, 13:13: Slope Set @ 0.98
Friday, October 06, 2023, 05:54: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Friday, October 06, 2023, 11:50: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (640 A w/ offset). Temperature @ 1716 C. Vacuum @ 2.76e-06T.
Friday, October 06, 2023, 12:20: TGHT / TBHT @ 630 / 230 A (618 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1809 C. Vacuum @ 3.77e-06T.
Friday, October 06, 2023, 12:37: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 665 A @ 2 A per min (650 A w/ offset). Temperature @ 1844 C.
Friday, October 06, 2023, 12:53: Tapped up to TGHT / TBHT @ 670/ 230 A (657 / 233 A). Temperature @ 1880 C. Vacuum @ 4.94e-06T.
Friday, October 06, 2023, 12:57: Tapped TGHT to 675. TGHT / TBHT @ 675 / 230 A (662 / 233 A). Temperature @ 1889 C. Vacuum @ 5.03e-06T.
Friday, October 06, 2023, 13:00: Tapped TGHT to 682. TGHT / TBHT @ 682 / 230 A (669 / 233 A). Temperature @ 1901 C. Vacuum @ 5.46e-06T. Desired Temperature reached.

Friday, October 06, 2023, 13:01: Auto-cooling @ 2 A per min.
Tuesday, October 10, 2023, 08:37: PS & TP off. |
594
|
Monday, October 17, 2022, 11:32 |
Darwin Ortiz Rosales | TaC | 45220-2 | LP-SIS | Done | TaC coating sintering | Monday, October 17, 2022, 10:03
The coated container was wrapped in 4 Ta foil heatshields. (The 4 shields appear to work well)
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~420A (adjustable)
Heating autoramp started at 2A/min on both TGHT and TBHT to40A
Then at 1A/min on both heaters to 120A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, October 17, 2022, 12:45
Autoramping @4A/min on both TGHT and TBHT to 400 and 30A respectively
Monday, October 17, 2022, 12:56
slowed ramp to 2A/min on both heaters as pressure was increasing too fast. (1A/30s).
Monday, October 17, 2022, 13:30
increased ramp rate to 4A/min on TGHT as TBHT is already at 230A
Monday, October 17, 2022, 14:16
leaving at TGHT : 393A, 6.5V ; TBHT 233A, 4.2V
OMEGA reads 1864C. Will start rampdown at 6:17 pm
Monday, October 17, 2022, 18:16
OMEGA read 1875C at max and now reads 1856C
starting ramp down at -2A/min TGHT and -1A/min TBHT
Final IGP1= 1.4e-06 Torr
Tuesday, October 18, 2022, 09:37
IGP1= 2.72e-7 Torr
Turning heaters off on epics and turning vacuums off. |
621
|
Sunday, April 16, 2023, 14:08 |
Darwin Ortiz Rosales | TaC | 45220-14 | LP-SIS | Done | TaC coating sintering | Sunday, April 16, 2023, 14:08
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Ramped at 2A/min to 230 A on both TGHT and TBHT.
Then ramped @4A/min to 385 A on TGHT. Then ramped manually to 1850 C
Sunday, April 16, 2023, 18:31
At 428A reached 1830C on OMEGA
Sunday, April 16, 2023, 22:24
Start ramp down @ -2A/min TGHT and -1A/min TBHT |
601
|
Thursday, November 10, 2022, 07:40 |
Darwin Ortiz Rosales | TaC | 45220-13 | LP-SIS | Done | TaC coating sintering | Thursday, November 10, 2022, 07:40
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 4A/min on both TGHT and TBHT to 40A
Then at 1A/min on both heaters to 120A.
Good vacuum = 5.0 e-02 Torr
Bad vacuum = 5.0E-04 Torr
IGP1 initial = 2.8e-07 Torr
Thursday, November 10, 2022, 10:31
TGHT 230A 3.4V and TBHT at 230A , 3.9V
Continue ramp up for TGHT at 4A/min (2A/30s) to 380A
Thursday, November 10, 2022, 11:30
OMEGA =1886 C @ 430A, 7.1V TGHT; will leave for 4 hours
Thursday, November 10, 2022, 15:43
rampdown at -2A/min TGHT and -1A/min TBHT |
604
|
Tuesday, November 22, 2022, 14:59 |
Darwin Ortiz Rosales | TaC | 45220-12 | LP-SIS | Done | TaC coating sintering | Tuesday, November 22, 2022, 14:58
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 4A/min on both TGHT and TBHT to 40A
Then at 2A/min on both heaters to 120A.
Good vacuum = 5.0 e-02 Torr
Bad vacuum = 5.0E-04 Torr
leaving to pressure down.
Wednesday, November 22, 2022, 19:10
OMEGA = 1942 C @ 396A on TGHT
lowered to 386A to 1900 and left for 4 hours.
After four hours, started rampdown at-2A/min TGHT and -1A/min TBHT
|
606
|
Friday, December 02, 2022, 09:50 |
Darwin Ortiz Rosales | | 45220-12 | TARGET BOAT | Done | Grahite disc conditioning 221130-Graphite | Friday, December 02, 2022, 09:46
297 graphite discs packed into a Ta tube wrapped in four heatshields.
Good vacuum 5.0e-04 Torr
Bad vacuum 5.0 e-02 Torr
Will be conditioned @ 2000 C for 5 hours and then for one hour at 10A greater than final current. Final current will be calculated from
regression.
IGP1= 5.7 e-07 Torr
ramping to 40A @ 2A/min TGHT
Friday, December 02, 2022, 20:59
Was ramped to 320A but the window must be coated because Temperature readings are drastically off. Will cool down and repeat on Monday after cleaning window. Will ramp down at -2A/min
OMEGA= 1360 C, expect much higher.
Tuesday, December 06, 2022, 10:58
ramp started at 4A/min . Initial pressure was 2.6 e-07 Torr
Tuesday, December 06, 2022, 12:45
OMEGA readings low (1290 @ 331A, 5.6V )
Will tap up until pressure bump observed.
Tuesday, December 06, 2022, 13:04
Pressure bump observed around 440 A, 7.9 V
IGP1= 8.4 e-06 Torr.
Current stopped and will keep at this current for 10 hours (11 pm rampdown)
Tuesday, December 06, 2022, 13:24
Ramped to 500A, Will leave at 500A for the rest of the conditioning.
Tuesday, December 06, 2022, 23:05
Starting rampdown at -2A/min
IGP1= 4.9e-07 Torr
TGHT= 500A, 9.3V
Wednesday, December 07, 2022, 09:43
Dismounting today.
IGP1 final = 9.6e-08 Torr
Wednesday, December 07, 2022, 13:29
Reinstalled in the evaporator. Window was not shaded. Will try heating to 500A once more.
ramp at 6A/min |
622
|
Tuesday, April 18, 2023, 06:48 |
Darwin Ortiz Rosales | TaC | 45220-11 | LP-SIS | Done | TaC coating sintering | Tuesday, April 18, 2023, 06:46
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02Torr
Tuesday, April 18, 2023, 06:47
IGP1 initial = 3.80e-07 Torr
Start ramp up at 2A min to 230 on both TBHT and TGHT
Tuesday, April 18, 2023, 09:43
Autoramping TGHT to 380 A @4/min (2/A 30s)
Tuesday, April 18, 2023, 10:36
manually ramped to 416A, 6.8 V on TGHT
TBHT = 230 A, 4.0V
Holding here for 4 hours.
OMEGA = 1863 c
Tuesday, April 18, 2023, 11:26
increased current on TGHT to 418 because temperature had slipped below 1850 C
Tuesday, April 18, 2023, 14:52
ramping down @-2A/min TGHT and -1A/min TBHT |
643
|
Tuesday, August 29, 2023, 12:47 |
Darwin Ortiz Rosales | TaC | 45220-10 | LP-SIS | Done | TaC coating sintering | Tuesday, August 29, 2023, 12:46
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Tuesday, August 29, 2023, 12:49
Initial heating start
IGP1= 6.0 e-06 Torr
Tuesday, August 29, 2023, 14:31
Paused ramping to take reading

IGP1= 5.98e-06 Torr
OMEGA = 1500 C
Tuesday, August 29, 2023, 15:24
OMEGA 1866 C
IGP1= 6.6e-6 Torr

|
603
|
Friday, November 18, 2022, 15:13 |
Darwin Ortiz Rosales | TaC | 45220-1 | LP-SIS | Done | TaC coating sintering | Friday, November 18, 2022, 15:08
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 4A/min on both TGHT and TBHT to 40A
Then at 2A/min on both heaters to 120A.
Good vacuum = 5.0 e-02 Torr
Bad vacuum = 5.0E-04 Torr
leaving to pressure down over weekend
Sunday, November 20, 2022, 12:11
start heatup IGP1=1.63e-07 Torr
Sunday, November 20, 2022, 14:21
OMEGA= 1900 at 395A, 6.6V on TGHT
Will leave until 6;20 pm |
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3.5 layers) (two pieces around the fins only and 3 layers around the whole )
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max). TGHT expected to reach desired Temperature @~700A
Evap 2 was pumped down over previous night
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @0.5 A/min to 60 A
Wednesday, March 23, 2022, 11:37
Increase autoramp to 1A/min to 60A for both TGHT and TBHT
Wednesday, March 23, 2022, 12:24
Pressure increasing at 60A so will leave at this current until pressure drops
Wednesday, March 23, 2022, 13:32
IGP1 = 2.9e-06 Torr
Will autoramp at 0.5A/min to 90A both TGHT and TBHT
Thursday, March 24, 2022, 16:35
1800C reached at 724A TGHT . TBHT @ 230A. Will keep at this temperature for 4 hours.
Thursday, March 24, 2022, 20:20
IGP1 = 6.9 e-06 Torr
OMEGA= 1828 C
TGHT = 724 A, 11.6 V
TBHT = 232.8 A, 3.1 V
Will start ramp-down at 2035 @ -2A/min TGHT and -1A/min TBHT
|
Attachment 1: image_2022-03-24_201954.png
|
|
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Total length packed 17 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 30A at 3 A/min
then continue to and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.1 e-07 Torr at start of initial ramp. Note, first real operation with new noisy Turbo Pump.
Wednesday, May 18, 2022, 10:18
Pressure increase observed starting around 60A. Ramped to 70 A and will leave until pressure stabilizes
After about 30 minutes pressure dropped so ramped up to 90 A @1A/min on both TGHT and TBHT
Wednesday, May 18, 2022, 11:37
pressure spike around 90A. will leave until pressure stabilizes
Wednesday, May 18, 2022, 12:54
start autoramp to 100A at 1A/min. IGP1= 1.4e-4 Torr
Wednesday, May 18, 2022, 13:15
autoramp to 150A @1A/min
Wednesday, May 18, 2022, 13:41
At 110A another spike in pressure. System waiting for good vacuum
Wednesday, May 18, 2022, 15:24
ramped to 150A on both TGHT and TBHT. Ramping to 200 A at @A/min for both TGHT and TBHT
currently IGP1= 2.0e-4 Torr
Wednesday, May 18, 2022, 15:33
Pressure still trending down; therefore will start ramp at 4A/min to 400 amp on TGHT and 230A to TBHT
Wednesday, May 18, 2022, 16:22
Increasing ramp to 4A/min on TGHT
Wednesday, May 18, 2022, 17:26
switched to 6A/min in 1A/10s increments on TGHT
Wednesday, May 18, 2022, 17:43
Set final current to 730 A as per regression attached.

Wednesday, May 18, 2022, 17:54
Final current on TGHT = 740A, 11.9 V
OMEGA = 1775 C
TBHT = 230A,
Will leave for 4 hours
Wednesday, May 18, 2022, 19:56
Temperature dropped so increased current to 755A for the remaining of the time.
Friday, May 20, 2022, 08:58
Final notes: The difference between initial and final mass was 6 g as expected. Slight coating on window of evaporator may explain apparent temperature drop. Next time will keep current at projected setting. The material looks good with slight overheating on the outer discs of left side.
|
610
|
Tuesday, February 28, 2023, 07:21 |
Darwin Ortiz Rosales | Ta | 44692-7 | LP-FEBIAD | Done | TaC coating sintering | Tuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (4 layers)
Desired temperature = 1850 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
OMEGA slope= 0.990
Good vacuum = 5.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @1A/min to 80 A then autoramp heat @1A/min to 150 A. Then autoramp TGHT to 400 A and TBHT to 230A.1
Tuesday, February 28, 2023, 15:39
Will ramp to 426A to 1850C as per regression line.
Tuesday, February 28, 2023, 15:57
Will start cooling at 8 pm
OMEGA= 1858 C
IGP1= 2.12e-06 Torr
TGHT =426 A, 7.5 V
TBHT = 230 A, 3.2 V
Tuesday, February 28, 2023, 19:58
OMEGA = 1858 C
IGP1 = 1.04e-06 Torr
TGHT =426 A, 7.6 V
TBHT = 230 A, 3.2 V
rampdown TGHT at -2A/min and TBHT @ -1A/min

|
612
|
Saturday, March 04, 2023, 08:34 |
Darwin Ortiz Rosales | TiC | 44692-7 | LP-FEBIAD | Done | TiC230301 conditioning | Saturday, March 04, 2023, 08:29
Ta LP-FEBIAD with 369 discs plus 5 removable discs wrapped with 3 Ta heat-shields (in layers)
Evap 2 will be pumped down over previous night
Desired temperature = 1500 C as in Elog #52 , TGHT will be ramped up to 300 A and then adjusted manually to 1500C if temperature readings are ok
otherwise will use plot from coating sintering to approximate 1500C.
TBHT will be set fixed at 230A (max).
Good vacuum = 5.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 3.4 e-07 Torr
Start autoramp @2A/min to 80 A then autoramp heat @1A/min to 230 A (both TGHT and TBHT)
Then autoramp TGHT to 300 A
-
Saturday, March 04, 2023, 22:27
At 332 A, 5.6V on TGHT, 230 A, 3.3 V TBHT
OMEGA = 1370 C
Will autoramp to 375A on TGHT @0.25A/min then leave for 4 hours at 1500C
Cooling should start at 6 am march 5th
OMEGA reading 1498 @ 2 am
Sunday, March 05, 2023, 06:03
OMEGA reading 1442 C @550am
ramped up to 394 A on TGHT and OMEGA reads 1500 C
will leave for 40 minutes than test ramp up to observe outgassing
d until 715 am then begin rampdown.
Sunday, March 05, 2023, 07:22
ramped to 425 to test further outgassing temperature increase observed but only while increasing current.
OMEGA = 1590 C
TGHT= 425A, 7.6V
TBHT= 230A, 3.3V
IGP1=2.0e-06 Torr
ramping down @-2A/min on TGHT and -1A/min TBHT
|
624
|
Monday, April 24, 2023, 09:12 |
Darwin Ortiz Rosales | TaC | 44692-5 | LP-FEBIAD | Done | TaC coating sintering | Sunday, April 23, 2023, 07:23
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~450A (adjustable)
Good vacuum = 5.0 e-04Torr
Bad vacuum = 5.0E-02 Torr
Interlock tripped (HS water flow, SP6, GE, CHIL <--supposed to be bypassed)
Monday, April 24, 2023, 13:24
In the morning Carla found some loose wires behind EVAP 2. Wires connecting the flow-meter. The interlock problem was fixed as it was noted there was normal HS water flow.
Started ramp up at 1A/min to 230 A. The first outgassing bump observed and wil start autoramp @ 2A/min on both TGHT and TBHT (target is 400A on TGHT and 230A on TBHT).
Monday, April 24, 2023, 16:24
Reached 480A on TGHT at 4 pm. Manually tapped to 500 A on TGHT , OMEGA=1853C. Will keep until 8 pm.
Monday, April 24, 2023, 19:56
OMEGA= 1853 C
IGP1= 1.5e-06 Torr
TGHT = 500A, 8.5V
TBHT= 230A, 3.1V
rampdown TGHT @-2A/min and TBHT @ -1A/min

|
625
|
Wednesday, April 26, 2023, 09:48 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 | Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.0e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation. |
626
|
Wednesday, April 26, 2023, 18:20 |
Carla Babcock | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A |
627
|
Wednesday, April 26, 2023, 22:26 |
John Wong | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Attachment 1: Screenshot_2023-04-26_221720.jpg
|
|
628
|
Thursday, April 27, 2023, 06:30 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 |
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A |
629
|
Thursday, April 27, 2023, 21:48 |
Carla Babcock | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
Darwin Ortiz Rosales wrote: |
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A
|
Reached 550A on TGHT (paused there until I realized it was stopped) then resumed ramping to 580A at 0.2A/min. Saw both vacuum spikes before 550A. Attaching screenshot from John. |
Attachment 1: MicrosoftTeams-image_(36).png
|
|
630
|
Thursday, April 27, 2023, 22:18 |
John Wong | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
Darwin Ortiz Rosales wrote: |
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A
|
Thursday, April 27, 2023, 22:04
TGHT has reached 580A/10.33V. Temp = 1540C.
The two out-gassing peaks were observed: 1st peak around 1300C and 2nd peak 1370C. See attachments 1 & 2.
A few minutes after TGHT reached to 580A, there was a small jump in TGHT current/voltage and also the pressure, but didn't notice any change in the temp, see attachment 3&4.
Pressure is currently at 3.4e-6 Torr; will hold TGHT until pressure reaches close to 1e-6 Torr before cooling down.
Friday, April 28, 2023, 01:06
Pressure has reached 1.8 e-6 Torr; TGHT has been holding at 580A for 3.5 hrs, a slight increase in voltage, reading at 10.45V and temperature, 1548C. See attachment #5 for overview.
Initiating auto-cooling TGHT at -2A/min, TBHT at -1A/min.
|
Attachment 1: Screenshot_2023-04-27_204948.jpg
|
|
Attachment 2: Screenshot_2023-04-27_205012.jpg
|
|
Attachment 3: Screenshot_2023-04-27_220239.jpg
|
|
Attachment 4: Screenshot_2023-04-27_220323.jpg
|
|
Attachment 5: Screenshot_2023-04-28_010640.jpg
|
|
|