Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 35 of 35  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Monday, June 05, 2023, 14:52, Aaron Schmidt, , , , , Swapped turbo pumps. 

 Previous TP would only spin up to 4KRPM. New TP installed.

Monday, June 05, 2023, 14:50: Roughing. 

Monday, June 05, 2023, 15:10: Controller reset. TP on. 

Entry  Wednesday, August 07, 2024, 15:37, Aaron Schmidt, , , , , Turning on EVAP2's turbo pump 

Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.

Wednesday, August 07, 2024, 15:37: TP on.

Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.

Failed to start.


Thursday, August 08, 2024, 10:00: TP started. 

Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.

ELOG V2.9.2-2455