571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing.
Tuesday, April 12, 2022, 13:49: TP1 switched on.
Tuesday, April 12, 2022, 13:57: TP1 stable (green).
Tuesday, April 12, 2022, 14:10: Vacuum @ 3.71e-05T & dropping.
Tuesday, April 12, 2022, 14:11: HS waterline opened.
Tuesday, April 12, 2022, 14:12: Vacuum @ 3.32e-05T.
Tuesday, April 12, 2022, 14:22: Vacuum @ 2.19e-05T (Stable).

|
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551 Varian. SN: 202311 (Slightly active from BL1A - will not cross contaminate. Field only - Tagged) was removed as it was meant to be a temporary fix. Replacement (Refurbished) pump is to be installed. (Tomorrow - Use slow start function as per vacuum group)
Thursday, May 12, 2022, 13:30: Agilent TP & hardware installed.
SN: IT21381010
Thursday, May 12, 2022, 13:41: Roughing.
Thursday, May 12, 2022, 13:46: Halt.
Friday, May 13, 2022, 07:05: Roughing.
Friday, May 13, 2022, 07:18: TP1 on.
Friday, May 13, 2022, 07:23: Up to 14 KRPM. Pause/Halted startup (Whining?). Slow start w/ vacuum group.
Process to perform a TP slow start:
- Hold both top buttons on the controller for about 3 seconds
- Right Yes/No left to continue.
- Advance to soft start - 20 min.
- Back to remote start & go.
Friday, May 13, 2022, 08:26: TP1 on w/ slow start.
Friday, May 13, 2022, 08:39: 13 KRPM & climbing.
Friday, May 13, 2022, 09:10: TP at full speed. 38 KRPM. 0.5A 9w. This pump whines, but is operating fine. Likely will switch again when another is available. (It appears to have been dropped, Noted by Edi. Likely when shipped)
Friday, May 13, 2022, 09:14: TP off. Slow start function off. Back to normal function. |
577
|
Thursday, June 02, 2022, 16:53 |
Aaron Schmidt | Ta | 44691-12 | LP-SIS | In progress | Conditioning Ta#64 | Ta#64 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") Measured.
Target density = 12.005 g/cm3
Target length = 3.35 cm
Total Mass = 40.2166 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 446 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
End caps installed (Not expanded). No Ta foil heat shield added
Final desired temperature = 1900C.
Thursday, June 02, 2022, 16:49: Roughing
Thursday, June 02, 2022, 17:02: OMEGA slope = 0.98.
Thursday, June 02, 2022, 17:10: TP1 on.
Thursday, June 02, 2022, 17:21: TP1 is up to speed. PS on.
Friday, June 03, 2022, 05:22: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min. Vacuum @ 1.78e-06T.
Friday, June 03, 2022, 08:59: TGHT / TBHT @ 424 / 200 A. Vacuum @ 3.42e-06T. Temperature @ 1318 C. Auto ramp ongoing.
Friday, June 03, 2022, 09:40: TGHT / TBHT @ 500 / 200 A. Vacuum @ 4.47e-06T. Temperature @ 1469 C. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min
Friday, June 03, 2022, 10:47: TGHT / TBHT @ 580 / 230 A. Vacuum @ 6.26e-06T. Temperature @ 1620 C. Auto-ramping TGHT to 600 @ 2 A per min
Friday, June 03, 2022, 11:08: TGHT / TBHT @ 600 / 230 A. Vacuum @ 6.54e-06T. Temperature @ 1655 C. Auto-ramping TGHT to 630 @ 2 A per min
Friday, June 03, 2022, 11:30: TGHT / TBHT @ 630 / 230 A. Vacuum @ 7.73e-06T. Temperature @ 1708 C. Auto-ramping TGHT to 650 @ 2 A per min
Friday, June 03, 2022, 11:45: TGHT / TBHT @ 650 / 230 A. Vacuum @ 8.32e-06T. Temperature @ 1748 C. Auto-ramping TGHT to 660 @ 2 A per min
Friday, June 03, 2022, 11:53: TGHT / TBHT @ 660 / 230 A. Vacuum @ 8.83e-06T. Temperature @ 1755 C. Auto-ramping TGHT to 670 @ 2 A per min
Friday, June 03, 2022, 12:05: TGHT / TBHT @ 670 / 230 A. Vacuum @ 9.03e-06T. Temperature @ 1780 C. Auto-ramping TGHT to 680 @ 2 A per min
Friday, June 03, 2022, 12:11: TGHT / TBHT @ 680 / 230 A. Vacuum @ 9.14e-06T. Temperature @ 1795 C. Auto-ramping TGHT to 700 @ 2 A per min
Friday, June 03, 2022, 12:23: TGHT / TBHT @ 700 / 230 A. Vacuum @ 9.50e-06T. Temperature @ 1822 C. Auto-ramping TGHT to 720 @ 2 A per min
Friday, June 03, 2022, 12:29: TGHT / TBHT @ 720 / 230 A. Vacuum @ 1.00e-05T. Temperature @ 1853 C. Auto-ramping TGHT to 730 @ 2 A per min
Friday, June 03, 2022, 12:36: TGHT / TBHT @ 725 / 230 A. Vacuum @ 1.04e-05T. Temperature @ 1860 C. Manually tap up TGHT to reach desired temperature
Friday, June 03, 2022, 13:04: TGHT / TBHT @ 760 / 230 A. Vacuum @ 1.07e-05T. Temperature @ 1901 C. Desired temperature reached
Friday, June 03, 2022, 13:13: Auto-cooling at 2 A per min.

Monday, June 06, 2022, 07:07: PS off. BV1 closed & TP1 off.
Monday, June 06, 2022, 08:47: Venting. |
618
|
Thursday, March 30, 2023, 12:45 |
Aaron Schmidt | Ta | 45220-7 | LP-SIS | In progress | Conditioning Ta#65 | Thursday, March 30, 2023, 12:27:
Ta#65 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured.
Target material batch: Ta 2023-1 Mt'l PO# TR-2022-03028
Target density = 18.2685 g/cm3
Target length = 3.40 cm
Total Mass = 62.113 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 460.8 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Tuesday, May 16, 2023, 10:44: End cap removed post conditioning to remove the rhenium foil. End cap replaced, & weight updated. Length remains the same.
Final desired temperature = 1900C.
Thursday, March 30, 2023, 12:41: RP on.
Thursday, March 30, 2023, 12:42: Roughing
Thursday, March 30, 2023, 12:44: OMEGA slope = 0.98.
Thursday, March 30, 2023, 12:59: TP1 on.
Thursday, March 30, 2023, 13:00: TP1 off.
Thursday, March 30, 2023, 13:03: Venting. (Steel pair of shields req'd - Install)
Thursday, March 30, 2023, 13:05: Roughing.
Thursday, March 30, 2023, 13:20: TP1 on.
Thursday, March 30, 2023, 13:29: TP1 trip @ 38 krpm. Quick Reset. Fully "green". OK.
Thursday, March 30, 2023, 13:31: Vacuum @ 5.84e-05T. TGHT / TBHT PS on.
Thursday, March 30, 2023, 13:32: Operation Check. TGHT / TBHT tapped up to 5 / 5 A. Ok. Back to 0A.
Friday, March 31, 2023, 06:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per minute. Vacuum @ 6.52e-07T.
Friday, March 31, 2023, 12:08: TGHT / TBHT @ 500 / 200 A. Vacuum @ 2.24e-06T. Temperature @ 1575 C. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min
Friday, March 31, 2023, 13:05: TGHT / TBHT @ 580 / 230 A. Vacuum @ 3.69e-06T. Temperature @ 1748 C. Auto-ramping TGHT to 600 @ 2 A per min
Friday, March 31, 2023, 13:27: TGHT / TBHT @ 600 / 230 A. Vacuum @ 3.83e-06T. Temperature @ 1790 C. Auto-ramping TGHT to 620 @ 2 A per min
Friday, March 31, 2023, 13:42: TGHT / TBHT @ 620 / 230 A. Vacuum @ 4.34e-06T. Temperature @ 1820 C. Auto-ramping TGHT to 640 @ 2 A per min
Friday, March 31, 2023, 13:51: TGHT / TBHT @ 640 / 230 A. Vacuum @ 5.51e-06T. Temperature @ 1858 C. Tap up TGHT to 650 A
Friday, March 31, 2023, 13:54: Vacuum @ 6.03e-06T. Temp @ 1902 C. Tapped up TGHT to 660 manually. Desired temperature reached.

Friday, March 31, 2023, 13:57: Auto-cooling @ 2 A per minute.
Friday, March 31, 2023, 17:31:

Monday, April 03, 2023, 07:35: PS off. TP off. |
635
|
Monday, June 05, 2023, 14:52 |
Aaron Schmidt | | | | | Swapped turbo pumps. | Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing.
Monday, June 05, 2023, 15:10: Controller reset. TP on. |
638
|
Wednesday, June 21, 2023, 10:37 |
Aaron Schmidt | Nb | 45447-7 | LP-IG-LIS | In progress | Conditioning Nb#10 | Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Target density = 7.36 g/cm3
Target length = 3.5 cm
Total Mass = 25.7576 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 438 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Wednesday, June 21, 2023, 10:37: Roughing.
Wednesday, June 21, 2023, 13:39: TP1 on.
Wednesday, June 21, 2023, 13:55: TGHT / TBHT PS on. Vacuum @ 3.35e-05T
Thursday, June 22, 2023, 13:16: TGHT / TBHT Manually set to 5 / 5 A. Vacuum @ 8.17e-07T.
Final desired temperature = 1900C.
Thursday, June 22, 2023, 13:49: OMEGA slope = 0.98.
Friday, June 23, 2023, 06:24: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Friday, June 23, 2023, 12:11: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 610 A @ 2 A per min (600 A w/ offset). Temperature @ 1697 C. Vacuum @ 3.38e-06T.
Friday, June 23, 2023, 12:32: TGHT / TBHT @ 610 / 230 A (600 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (620 A w/ offset). Temperature @ 1748 C. Vacuum @ 4.61e-06T.
Friday, June 23, 2023, 12:44: TGHT / TBHT @ 630 / 230 A (617 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1790 C. Vacuum @ 5.74e-06T.
Friday, June 23, 2023, 13:07: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 670 A @ 2 A per min (660 A w/ offset). Temperature @ 1825 C. Vacuum @ 5.90e-06T.
Friday, June 23, 2023, 13:22: TGHT / TBHT @ 670 / 230 A (658 / 233 A). Auto-ramping TGHT to 680 A @ 2 A per min (668 A w/ offset). Temperature @ 1858 C. Vacuum @ 6.75e-06T.
Friday, June 23, 2023, 13:29: TGHT / TBHT @ 680 / 230 A (667 / 233 A). Auto-ramping TGHT to 690 A @ 2 A per min (677 A w/ offset). Temperature @ 1877 C. Vacuum @ 6.99e-06T.
Friday, June 23, 2023, 13:37: Manually tap up to temperature.
Friday, June 23, 2023, 13:38: Vacuum @ 7.54e-06T. TGHT / TBHT @ 694 / 230 A (680.5 / 233 A direct w/ offset). Temperature @ 1901-1902 C. Desired Temperature Reached.

Friday, June 23, 2023, 13:42: Auto-cooling @ 2 A per min. |
641
|
Thursday, August 24, 2023, 14:18 |
Aaron Schmidt | Nb | 45447-9 | LP-IG-LIS | In progress | Conditioning Nb#11 | Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Target density = 7.13 g/cm3
Target length = 3.53 cm
Total Mass = 25.165 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 434 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Final desired temperature = 1900C.
Replacement for Nb#10
Thursday, August 24, 2023, 14:16: Roughing.
OMEGA slope = 0.98.
Thursday, August 24, 2023, 14:31: Turbo pump started.
Thursday, August 24, 2023, 14:41: TGHT / TBHT PS on. Manually test @ 5 / 5 A. ok. Tap back to 0 A.
Thursday, August 24, 2023, 18:26: Vacuum @ 4.35e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Thursday, August 24, 2023, 22:00: TGHT / TBHT @ 414 / 230 A (406 / 233 A - Offset). Auto-ramping TGHT to 580 A @ 2 A per min continued. Temperature @ 1353 C. Vacuum @ 4.03e-06T.
Thursday, August 24, 2023, 23:29: TGHT / TBHT @ 580 / 230 A (569 / 233 A). Auto-ramping TGHT to 610 A @ 2 A per min (approx 600 A w/ offset). Temperature @ 1708 C. Vacuum @ 6.61e-06T.

Thursday, August 24, 2023, 23:49: TGHT / TBHT @ 610 / 230 A (598 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (620 A w/ offset). Temperature @ 1765 C. Vacuum @ 7.22e-06T.
Friday, August 25, 2023, 00:04: TGHT / TBHT @ 630 / 230 A (618 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1808 C. Vacuum @ 7.54e-06T.
Friday, August 25, 2023, 00:16: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 670 A @ 2 A per min (660 A w/ offset). Temperature @ 1845 C. Vacuum @ 7.72e-06T.
Friday, August 25, 2023, 00:27: TGHT / TBHT @ 670 / 230 A (657 / 233 A). Auto-ramping TGHT to 680 A @ 2 A per min (668 A w/ offset). Temperature @ 1880 C. Vacuum @ 8.46e-06T.
Manually tap up to temperature.
Friday, August 25, 2023, 00:34: TGHT / TBHT @ 682 / 230 A (669 / 233 A). Temperature @ 1900-1901 C. Vacuum @ 8.59e-06T. Desired Temperature Reached.

Friday, August 25, 2023, 00:37: Auto-cooling @ 2 A per min.
Friday, August 25, 2023, 06:15:
Friday, August 25, 2023, 07:40: PS & TP off.
|
646
|
Wednesday, September 20, 2023, 14:26 |
Aaron Schmidt | Ta | 45220-5 | LP-SIS | In progress | Conditioning Ta#66 | Ta#66 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured.
Target material batch: Ta 2023-1 Mt'l PO# TR-2022-03028
Target density = 12.446 g/cm3
Target length = 5.0 cm
Total Mass = 62.230 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Desired temperature 1900C
Wednesday, September 20, 2023, 14:18: Roughing.
Wednesday, September 20, 2023, 14:35: TP Started.
Wednesday, September 20, 2023, 14:43: TP on.
Wednesday, September 20, 2023, 14:45: TGHT / TBHT raised to 5 / 5 A & lowered. Quick check ok.
Thursday, September 21, 2023, 07:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. Vacuum @ 8.30e-07T.
Thursday, September 21, 2023, 09:54: Slope set to 0.98
Thursday, September 21, 2023, 13:42: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (640 A w/ offset). Temperature @ 1748 C. Vacuum @ 2.47e-06T.
Thursday, September 21, 2023, 14:10: TGHT / TBHT @ 630 / 230 A (618 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1843 C. Vacuum @ 3.30e-06T.
Thursday, September 21, 2023, 14:23: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 660 A @ 2 A per min (648 A w/ offset). Temperature @ 1879 C. Vacuum @ 3.77e-06T.
Thursday, September 21, 2023, 14:29: Tapped TGHT to 662. TGHT / TBHT @ 662 / 230 A (649 / 233 A). Temperature @ 1903 C. Vacuum @ 4.08e-06T. Desired Temperature reached.

Thursday, September 21, 2023, 14:33: Auto-cooling started @ 1 A per min.

Monday, September 25, 2023, 08:09: Turbo pump off. |
647
|
Thursday, October 05, 2023, 12:47 |
Aaron Schmidt | Ta | 45220-3 | LP-SIS | In progress | Conditioning Ta#68 (Spare) | Ta#(Spare) LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured.
Target material batch: Ta 2023-1 Mt'l PO# TR-2022-03028
Target density = 12.515 g/cm3
Target length = 4.97 cm
Total Mass = 62.202 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven = 461g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
Dimpling direction on foils/ Packs. --> Center <--
End caps installed (Not expanded). No Ta foil heat shield added
Was labelled Ta#67 until the Thin foil target 45447-14 became so.
Thursday, October 05, 2023, 12:44: Roughing.
Thursday, October 05, 2023, 13:10; TP1 on.
Thursday, October 05, 2023, 13:11: TGHT / TBHT test. Tap up to 5 / 5 A & back to 0 A. Ok.
Thursday, October 05, 2023, 13:13: Slope Set @ 0.98
Friday, October 06, 2023, 05:54: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Friday, October 06, 2023, 11:50: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (640 A w/ offset). Temperature @ 1716 C. Vacuum @ 2.76e-06T.
Friday, October 06, 2023, 12:20: TGHT / TBHT @ 630 / 230 A (618 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1809 C. Vacuum @ 3.77e-06T.
Friday, October 06, 2023, 12:37: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 665 A @ 2 A per min (650 A w/ offset). Temperature @ 1844 C.
Friday, October 06, 2023, 12:53: Tapped up to TGHT / TBHT @ 670/ 230 A (657 / 233 A). Temperature @ 1880 C. Vacuum @ 4.94e-06T.
Friday, October 06, 2023, 12:57: Tapped TGHT to 675. TGHT / TBHT @ 675 / 230 A (662 / 233 A). Temperature @ 1889 C. Vacuum @ 5.03e-06T.
Friday, October 06, 2023, 13:00: Tapped TGHT to 682. TGHT / TBHT @ 682 / 230 A (669 / 233 A). Temperature @ 1901 C. Vacuum @ 5.46e-06T. Desired Temperature reached.

Friday, October 06, 2023, 13:01: Auto-cooling @ 2 A per min.
Tuesday, October 10, 2023, 08:37: PS & TP off. |
665
|
Monday, July 22, 2024, 14:59 |
Aaron Schmidt | Ta | 45447-14 | LP-SIS | In progress | Conditioning Ta#67 Thin foil | Ta#67 Thin foil LP-SIS target description:
Total Ta foils = 470 loaded into 2 packs of 235 foils each.
Foil Thickness = 0.010mm (0.0004") avg Measured.
Target material batch: https://elog.triumf.ca/TIS/Target+Production/143
Target density = 4.498 g/cm3
Target length = 3.7465 cm
Total Mass = 16.8509 g [Incl foils + Ta wire on 2 packs]
Total mass w/ Target oven = 415g (No end caps)
Discs in target are arranged as follows: 2packs
Dimpling direction on foils/ Packs. --> Center <--
No Ta foil heat shield added
Monday, July 22, 2024, 14:53: Roughing.
Halt roughing. Install heat plates.
Monday, July 22, 2024, 15:06: Roughing.
Monday, July 22, 2024, 15:26: TP On.
Monday, July 22, 2024, 15:34: TP Timeout. Restart.
Monday, July 22, 2024, 15:35: TP at speed (Green)
Monday, July 22, 2024, 15:36: PS On. TGHT / TBHT to 5/5 A manually. OK. Tap down.
Tuesday, July 23, 2024, 07:03: Auto-ramping TGHT / TBHT to 120 / 60 A @ 2 A per min. Desired temperature 1900 C.
Tuesday, July 23, 2024, 08:02: OMEGA IR2C Laser off. Slope set to 0.98.
Tuesday, July 23, 2024, 08:06: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Tuesday, July 23, 2024, 09:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min. Temperature @ 1022 C.
Tuesday, July 23, 2024, 11:59: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. Temperature @ 1538 C.
Tuesday, July 23, 2024, 12:46: TGHT / TBHT @ 580 / 230 A (569 / 233 A). Temperature @ 1710 C. Vacuum @ 7.44e-06T.
Tuesday, July 23, 2024, 14:23: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 620 A @ 2 A per min. Temperature @ 1721 C. Vacuum @ 5.06e-06T.
Tuesday, July 23, 2024, 14:48: TGHT / TBHT @ 620 / 230 A 609 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min. Temperature @ 1799 C. Vacuum @ 6.76e-06T.
Tuesday, July 23, 2024, 14:56: TGHT / TBHT @ 630 / 230 A 618 / 233 A). Temperature @ 1816 C. Vacuum @ 7.14e-06T. Tapping up manually TGHT to get to 1900degC
Tuesday, July 23, 2024, 15:23: TGHT / TBHT @ 670 / 230 A 657 / 233 A). Temperature @ 1890 C. Vacuum @ 9.94e-06T. Stopping and waiting for 5min.

Tuesday, July 23, 2024, 15:39: Target ramp down 2A/min to 0 both TGHT and TBHT.
Wednesday, July 24, 2024, 08:50: TP off.
Wednesday, July 24, 2024, 09:18: Venting.
Wednesday, July 24, 2024, 10:28: Target removed. EVAP2 clear. |
668
|
Wednesday, August 07, 2024, 15:37 |
Aaron Schmidt | | | | | Turning on EVAP2's turbo pump | Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.
Wednesday, August 07, 2024, 15:37: TP on.
Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.
Failed to start.
Thursday, August 08, 2024, 10:00: TP started.
Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on. |
|