Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 35 of 35  Not logged in ELOG logo
ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  634   Wednesday, May 24, 2023, 15:23 Darwin Ortiz Rosales 44139-4LP TUBEDoneGraphite inside insert Experiment 1 
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with
 Screenshot_Graphite_insert_Exp1.png 
  635   Monday, June 05, 2023, 14:52 Aaron Schmidt    Swapped turbo pumps. Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
  
  668   Wednesday, August 07, 2024, 15:37 Aaron Schmidt    Turning on EVAP2's turbo pumpWednesday, August 07, 2024, 15:36: Roughing.
Had initially been roughed & TP started
w/ Marla CS, however it timed out. Restarting.
  
ELOG V2.9.2-2455