  Evaporator_2, Page 35 of 35  Not logged in ELOG logo
Entry  Thursday, March 25, 2021, 07:57, Aaron Schmidt, , , , , Re - Ta test. Leak check. 

Thursday, March 25, 2021, 07:55: Vacuum @ 5.12e-07T. Waterlines opened.

Thursday, March 25, 2021, 07:55: Vacuum @ 5.09e-07T. Stable.

Entry  Thursday, November 25, 2021, 14:00, Aaron Schmidt, , , , , Lower insulator replaced 

 The Helicoil had mostly pulled out of the old one.

Thursday, November 25, 2021, 13:58: Insulator replaced. EVAP 2 is ready for use with ISAC targets.

Entry  Monday, June 05, 2023, 14:52, Aaron Schmidt, , , , , Swapped turbo pumps. 

 Previous TP would only spin up to 4KRPM. New TP installed.

Monday, June 05, 2023, 14:50: Roughing. 

Monday, June 05, 2023, 15:10: Controller reset. TP on. 

Entry  Wednesday, August 07, 2024, 15:37, Aaron Schmidt, , , , , Turning on EVAP2's turbo pump 

Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.

Wednesday, August 07, 2024, 15:37: TP on.

Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.

Failed to start.


Thursday, August 08, 2024, 10:00: TP started. 

Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.