  Evaporator_2, Page 30 of 35  Not logged in ELOG logo
  ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  131   Friday, May 30, 2014, 13:15 Cameron Hodgins   In progressSintering several carbides on tantalum foil backing Pressure down to 7.1e-7 Torr. Water
valve to heat shield was opened; pressure
remained stable. 
  
  132   Friday, June 06, 2014, 16:01 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingAuto-ramp started. Max current = 500 A,
voltage = 11.05 V. Current is being increased
at 2 A/min. In the first 20 minutes, the
  
  133   Monday, June 09, 2014, 13:56 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingManually changed current from 500 to 615
A, monitoring the temperature. Temperature
went from 1657 C up to 1838 C. Pressure increased
  
  134   Monday, June 09, 2014, 17:15 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backing Target boat is now being cooled at
1 A/min from the starting point (616 A) down
to 0 A. 
  
  145   Monday, July 28, 2014, 15:06 Laura Lambert 40282-3LP-SISIn progressSintering ZrC# 6 target Monday, July 28, 2014, 14:41
Total number of foils: 445 discs
Total mass of materials [incl graphite
  
  146   Tuesday, July 29, 2014, 11:23 John Wong 40282-3LP-SISIn progressSintering ZrC# 6 target

    

       
            
  
  147   Friday, August 01, 2014, 11:47 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningThe maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A
  
  148   Friday, August 01, 2014, 13:27 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningTarget was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
 
 zrc6_conditioning.png 
  149   Tuesday, August 05, 2014, 12:01 Laura Lambert 40282-3LP-SISDoneZrC #6 conditioning

    

       
            
  
  151   Tuesday, August 05, 2014, 17:20 John Wong  TARGET BOATIn progressSintering TaC coated end caps

    

       
            
  
  153   Thursday, August 07, 2014, 10:13 Laura Lambert  TARGET BOATFailedSintering TaC coated end caps

    

       
            
  
  155   Thursday, September 11, 2014, 14:23 Laura Lambert 40282-3TARGET BOATFailedSintering TaC coated end caps Thursday, September 11, 2014, 13:14
The target container end caps were
coated with TaC spray and let dry.
 IMG_20140917_142605683.jpgIMG_20140917_143120141.jpgIMG_20140917_143343399_HDR.jpgCapture.JPGCapture2.JPG 
  172   Wednesday, November 26, 2014, 14:09 Laura Lambert   MaintenanceOMEGA-IR dark patch and backing pump trip Wednesday, November
26, 2014, 13:47
 IR_focus.jpeg 
  173   Thursday, December 11, 2014, 10:20 Laura Lambert   Maintenancewater supply shut off for lab closure over holidays Thursday, December 11, 2014, 10:17
water supply and return valves closed
for lab closure over the holidays.
  
  188   Friday, May 01, 2015, 10:50 Laura Lambert 40282-4TARGET BOATIn progressSintering four different ZrC samples Friday, May 01, 2015, 10:27
Four different samples of ZrC are
loaded into a target boat.
 1.jpg2015-04-30_15.24.57.jpg 
  189   Monday, May 04, 2015, 17:26 John Wong 40282-4TARGET BOATIn progressSintering four different ZrC samples

    

       
            
  
  190   Wednesday, May 06, 2015, 13:59 Laura Lambert 40282-4TARGET BOATDoneSintering two different ZrC samples Wednesday, May 06, 2015, 13:54
Two different samples of ZrC are
wrapped in graphite sheet and loaded into
 evap2_data_from_two_samples_-_18mm_hand_punched.xlsx 
  191   Friday, May 08, 2015, 15:56 Laura Lambert 40282-4TARGET BOATDoneSintering four different ZrC samples

    

       
            
 evap2_data_from_four_samples.xlsx 
  192   Wednesday, May 13, 2015, 16:01 Laura Lambert 40282-4TARGET BOATDoneSintering three different ZrC samples Wednesday, May 13, 2015, 15:21
Three different samples of ZrC
 evap2_data_from_three_samples_-_final_test_run.xlsx 
  218   Thursday, June 18, 2015, 11:39 Rick Maharaj    Installation of Extraction Electrode Insulator - New MaterialTuesday June 16, 2015
An Extraction Insulator ITD0381 made
from a different grade of AiN was installed
  