232
|
Friday, July 31, 2015, 15:10 |
John Wong | | | | Maintenance | Installed leftside port | Friday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2. Leak check was |
|
|
233
|
Friday, July 31, 2015, 15:51 |
John Wong | Ta | | TARGET BOAT | In progress | Test for homogeneity: Sintering TaC coating on a Ta tube | Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The
inner of the tube was filled with TaC solution |
|
|
234
|
Tuesday, August 04, 2015, 12:04 |
Laura Lambert | Ta | | TARGET BOAT | Done | Test for homogeneity: Sintering TaC coating on a Ta tube |
|
|
|
235
|
Thursday, August 06, 2015, 15:45 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps | Thursday, August 06, 2015, 15:36
The endcaps are stacked together
with a punched out disc of graphite foil |
|
|
236
|
Tuesday, August 18, 2015, 16:02 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target | Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm. |
|
|
237
|
Wednesday, August 19, 2015, 17:26 |
John Wong | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
|
238
|
Thursday, August 20, 2015, 10:07 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
|
239
|
Thursday, August 20, 2015, 17:15 |
John Wong | Ta | | HP-SIS | Done | Conditioning Ta#46 Target |
|
|
|
240
|
Monday, August 24, 2015, 12:58 |
John Wong | | | | Maintenance | Replacing turbo pump, IEVAP2TP1 | Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
The pump couldn't get on full speed |
|
|
241
|
Tuesday, August 25, 2015, 11:54 |
Laura Lambert | Empty | | HP-FEBIAD | In progress | Sintering TaC coating container for SiC Target | Tuesday, August 25, 2015, 11:50
Container coated with TaC using new
method: Ends tapped off, with liquid |
|
|
242
|
Thursday, August 27, 2015, 16:37 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating container for SiC Target |
|
|
|
271
|
Thursday, January 14, 2016, 11:48 |
Laura Lambert | | | | Maintenance | Backing Pump Replaced | Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes |
|
|
277
|
Wednesday, February 24, 2016, 17:40 |
John Wong | Nb | | LP-SIS | Done | Bob/Tobi Nb samples | Thursday, February 25, 2016, 18:04 Wednesday,
February 24, 2016, 17:29
Heat treatment of 2 bullet-shaped |
|
|
278
|
Friday, February 26, 2016, 16:02 |
John Wong | np-SiC | | TARGET BOAT | Done | Test#2: Carbonizing sol-gel TEOS + Pan nanofibers | Friday, February 26, 2016, 15:44
5 samples were prepared at UBC MTRL
using Sol-gel tetraethyl orthosilicate (TEOS) |
|
|
287
|
Thursday, March 24, 2016, 12:05 |
John Wong | SiC | | TARGET BOAT | Done | Test#3: E-spin SiC with PAN | Thursday, March 24, 2016, 11:37
SiC powder (<1um) [10%] was mixed
with PAN solution [10%]. Solution was |
|
|
289
|
Thursday, April 07, 2016, 15:23 |
John Wong | SiC | | TARGET BOAT | Done | E-spun SiC/PAN thermal treatment | Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC. |
|
|
292
|
Tuesday, May 03, 2016, 14:44 |
Laura Lambert | | | | | VACUUM PUMP REPLACEMENT | Tuesday, May 03, 2016, 14:29
Turned vacuum pump on this morning,
sounded awful: loud grinding bad noises. |
|
|
296
|
Wednesday, May 11, 2016, 17:24 |
John Wong | np-SiC | | TARGET BOAT | Done | Temperature Treament of Nanofiber SiC/PAN | Wednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN
was prepared at UBC. |
|
|
297
|
Thursday, May 19, 2016, 14:38 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs | The purpose of this experiment is to
determined the limiting operating temperature
for Beta-SiC. To do so, samples will |
|
|
298
|
Friday, May 20, 2016, 08:54 |
Laura Lambert | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
|
|