ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
359
|
Thursday, April 20, 2017, 12:45 |
John Wong | np-SiC | | TARGET BOAT | In progress | Higher Temp Treament: B3-92Mpa pellets | Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta
boat and wrapped with heat shield (1 long |
|
|
56
|
Tuesday, January 22, 2013, 16:14 |
John Wong | | | LP-SIS | Done | Heating RFQ components & measuring temperatures | Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year. |
|
|
297
|
Thursday, May 19, 2016, 14:38 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs | The purpose of this experiment is to
determined the limiting operating temperature
for Beta-SiC. To do so, samples will |
|
|
298
|
Friday, May 20, 2016, 08:54 |
Laura Lambert | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
|
|
|
299
|
Tuesday, May 24, 2016, 11:18 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
|
|
|
336
|
Tuesday, November 15, 2016, 16:51 |
John Wong | np-SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 | Tuesday, November 15, 2016, 16:48
Three samples were prepared
(see my logbook#1 page 3, preparing for carbonization). |
|
|
337
|
Thursday, November 17, 2016, 11:15 |
Laura Lambert | np-SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 |
|
|
|
338
|
Friday, November 18, 2016, 17:28 |
John Wong | np-SiC | | TARGET BOAT | Done | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 |
|
|
|
510
|
Friday, September 25, 2020, 10:32 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Heat Treatment of Nb for Edward | Friday, September 25, 2020, 10:30
Target boat with a layer of |
|
|
511
|
Monday, September 28, 2020, 09:36 |
John Wong | Nb | | TARGET BOAT | Done | Heat Treatment of Nb for Edward |
|
|
|
96
|
Thursday, November 07, 2013, 09:38 |
Anders Mjos | | | | Problems resolved | Heat Shield cooling line twisted | See attached photo.
The Heat Shield has been taken to
the Machine Shop for repair. |
|
|
444
|
Tuesday, May 21, 2019, 14:34 |
Aaron Schmidt | | | | | HS swap to EVAP 2 flex line. | Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS. |
|
|
406
|
Wednesday, April 25, 2018, 07:21 |
Aaron Schmidt | | | | Done | HS swap evap 2 | Wednesday, April 25, 2018, 07:05: TGHT
& TBHT off
Wednesday, April 25, 2018, 07:15: |
|
|
459
|
Thursday, September 26, 2019, 14:03 |
Aaron Schmidt | Nb | 41882-3 | TARGET BOAT | In progress | HS swap & test Nb target | HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS |
|
|
518
|
Friday, October 16, 2020, 16:31 |
Luca Egoriti | Empty | | TARGET BOAT | In progress | HPOG annealing | Friday, October 16, 2020, 11:30
Target mounted in EVAP2. Pump
down started |
|
|
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok. |
|
|
636
|
Tuesday, June 06, 2023, 09:14 |
Darwin Ortiz Rosales | C | 44139-4 | TARGET BOAT | Done | Graphite inside insert Experiment 2 (regular formulation discs) | Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields. Note final |
|
|
634
|
Wednesday, May 24, 2023, 15:23 |
Darwin Ortiz Rosales | | 44139-4 | LP TUBE | Done | Graphite inside insert Experiment 1 |
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with |
|
|
430
|
Wednesday, February 13, 2019, 10:08 |
Darwin Ortiz Rosales | | 43630-1 | | Done | Graphite insert test 3b | Wednesday, February 13, 2019, 10:04
A previously coated tantalum |
|
|
437
|
Sunday, April 07, 2019, 08:13 |
Marla Cervantes | | 43630-5 | | Done | Graphite insert test #5 | Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps)
was loaded in tantalum tube previously coated |
|