522
|
Wednesday, November 04, 2020, 17:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | Parasitic target graphite outgassing. | 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on. |
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
379
|
Tuesday, July 18, 2017, 15:30 |
Laura Lambert | | | | Maintenance | Paddle wheel replacement for all evap2 water supplies | Tuesday, July 18, 2017, 15:26
Problems occured with TGHT water
supply paddle wheel stopped and therefore |
|
475
|
Wednesday, March 04, 2020, 14:33 |
Aaron Schmidt | | | | Maintenance | PS swap out | The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: |
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend. |
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. |
|
172
|
Wednesday, November 26, 2014, 14:09 |
Laura Lambert | | | | Maintenance | OMEGA-IR dark patch and backing pump trip | Wednesday, November
26, 2014, 13:47 |
|
599
|
Tuesday, November 01, 2022, 17:35 |
John Wong | TiC | | TARGET BOAT | Done | Np-TiC fibres systhesis | Tuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner. Each |
|
33
|
Thursday, June 21, 2012, 18:13 |
John Wong | NiO | Ta target boat | | Failed | NiO development - Container broke! |
|
|
31
|
Wednesday, June 20, 2012, 17:29 |
Nikita Bernier | NiO | Ta target boat | | Done | NiO development | Wednesday, June 20, 2012, 17:23
New Target boat, with no coating,
wrapped with a 0.002 inches thick Ta foil, |
|
32
|
Wednesday, June 20, 2012, 22:33 |
John Wong | NiO | Ta target boat | | Done | NiO development |
|
|
346
|
Thursday, February 09, 2017, 11:49 |
Laura Lambert | | | | Maintenance | New heatshield with flexible water lines | Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday |
|
315
|
Thursday, August 18, 2016, 10:37 |
Anders Mjos | | | | Maintenance | New cooling lines for Heat Shield | Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting |
|
369
|
Thursday, May 11, 2017, 11:30 |
Laura Lambert | | | | Maintenance | New Ion Gauge for IGP2 | Thursday, May 11, 2017, 11:25
IGP2 has been having problems where
sometimes it turns off and requires simply |
|
571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. |
|
550
|
Friday, June 11, 2021, 08:41 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb treatment for Norman | Friday, June 11, 2021, 08:05
Target boat with a layer of |
|
85
|
Tuesday, September 17, 2013, 11:21 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) | Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs.
3 discs are wraps with 0.001" thin of |
|
86
|
Thursday, September 19, 2013, 11:56 |
Laura Lambert | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
87
|
Thursday, September 19, 2013, 17:02 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
88
|
Friday, September 20, 2013, 14:59 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|