269
|
Friday, January 08, 2016, 11:15 |
Laura Lambert | Ta | 41369-5 | HP-SIS | Done | Temperature measurements |
Aurelia Laxdal wrote: |
Temperature measurements in progress this week for Ta HP-SIS.
|
Friday, January 08, 2016, 10:49
Rh foil added.
endcaps inserted and expanded.
total length of target with end caps = 3.45cm
spot weld one thermocouple onto center block and one thermocouple onto target leg [left side wrt ionizer tube into page].
see elog id# 268 for more info regarding measurements taken and state of TBHT power supply...
|
|
300
|
Wednesday, May 25, 2016, 11:40 |
Laura Lambert | Empty | 41369-4 | HP-SIS | In progress | sintering TaC coating on SiC#33 container | Wednesday, May 25, 2016, 11:37
Container coated with TaC using 'flushing technique' [cleaned ionizer tube with acetone, so no coating inside ionizer tube]
Wrapped with 2 x Ta heat shields - one full height of Ta foil wrapped around cooling fins twice
Currently pumping down in evap2
Thursday, May 26, 2016, 09:28
Tapped up manually to 40A
IGP1 = 6.6e-7 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 650A and TBHT = 230A
Once max setpoints reached will continue to tap up manually while monitoring temperature to 1900C
|
|
301
|
Tuesday, May 31, 2016, 11:10 |
John Wong | Empty | 41369-4 | HP-SIS | Done | sintering TaC coating on SiC#33 container |
Laura Lambert wrote: |
Wednesday, May 25, 2016, 11:37
Container coated with TaC using 'flushing technique' [cleaned ionizer tube with acetone, so no coating inside ionizer tube]
Wrapped with 2 x Ta heat shields - one full height of Ta foil wrapped around cooling fins twice
Currently pumping down in evap2
Thursday, May 26, 2016, 09:28
Tapped up manually to 40A
IGP1 = 6.6e-7 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 650A and TBHT = 230A
Once max setpoints reached will continue to tap up manually while monitoring temperature to 1900C
|
Tuesday, May 31, 2016, 11:09
TGHT at 615A/9.08V, temp = 1610C. Vacuum at 1.8e-7 Torr.
Tapping up TGHT to reach 1900C
Tuesday, May 31, 2016, 12:04
TGHT at 765A/11.90V. Temp at 1900C. Pressure is coming down from 8.7e-7Torr.
Will keep at this temperature for a day.
Wednesday, June 01, 2016, 15:22
Temperature has been stable at 1900C. Pressure is coming down from 3.4e-7 Torr.
Cooling down TGHT and TBHT at 2A/min and 1A/min, respectively.
Friday, June 03, 2016, 12:10
TGHT/TBHT at 0A. Target can be remained under vacuum until Monday.
Monday, June 06, 2016, 16:54
Target container was inspected; it looks good
|
|
302
|
Thursday, June 09, 2016, 15:48 |
Laura Lambert | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! | Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Attachment 1: target_with_end-coils.jpg
|
|
|
303
|
Friday, June 10, 2016, 16:30 |
John Wong | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
|
304
|
Monday, June 13, 2016, 09:53 |
Laura Lambert | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:51
TGHT = 425A, 5.65V
TBHT = 225A, 3.7V
IGP1 = 8.7e-6 Torr.
Increasing ramping rate to 1.0A/min...
Monday, June 13, 2016, 15:56
Tapped up manually from 520A to 1800C
Extrapolated data on graph to determine correct current required to reach desired max temperature.
Will remain at 1800C for ~48hrs
See attachements for excel sheet and screenshot of striptool.
|
Attachment 1: current_vs_voltage_vs_temp.xlsx
|
Attachment 2: Tapping_up_from_520A_to_1800C.JPG
|
|
|
305
|
Wednesday, June 15, 2016, 17:58 |
John Wong | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:51
TGHT = 425A, 5.65V
TBHT = 225A, 3.7V
IGP1 = 8.7e-6 Torr.
Increasing ramping rate to 1.0A/min...
Monday, June 13, 2016, 15:56
Tapped up manually from 520A to 1800C
Extrapolated data on graph to determine correct current required to reach desired max temperature.
Will remain at 1800C for ~48hrs
See attachements for excel sheet and screenshot of striptool.
|
Wednesday, June 15, 2016, 17:54
TGHT at 710A, 11.35V. TBHT at 230A/3.86V.
Omega reading droppd to 1130C due to coating on windows.
Ionizer tube was measured (center) at around 1900C
Cooling down at 2A/min for TGHT, 1A/min for TBHT.
Samples will be collected prior to cleaning the windows.
NEXT: Conditioning.
|
|
306
|
Thursday, June 16, 2016, 10:58 |
Laura Lambert | SiC | 41369-4 | HP-SIS | Done | Sintering SiC#33 - 1st beta-SiC target! |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:51
TGHT = 425A, 5.65V
TBHT = 225A, 3.7V
IGP1 = 8.7e-6 Torr.
Increasing ramping rate to 1.0A/min...
Monday, June 13, 2016, 15:56
Tapped up manually from 520A to 1800C
Extrapolated data on graph to determine correct current required to reach desired max temperature.
Will remain at 1800C for ~48hrs
See attachements for excel sheet and screenshot of striptool.
|
Wednesday, June 15, 2016, 17:54
TGHT at 710A, 11.35V. TBHT at 230A/3.86V.
Omega reading droppd to 1130C due to coating on windows.
Ionizer tube was measured (center) at around 1900C
Cooling down at 2A/min for TGHT, 1A/min for TBHT.
Samples will be collected prior to cleaning the windows.
NEXT: Conditioning.
|
Thursday, June 16, 2016, 09:29
vented in air and opened up this morning.
took some samples to be tested.
|
|
307
|
Thursday, June 16, 2016, 11:01 |
Laura Lambert | SiC | 41369-4 | HP-SIS | Done | Conditioning SiC#33 - 1st beta SiC target! | Thursday, June 16, 2016, 10:59
Previously sintered over weekend [see elog i.d 306]
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Conditioning temp = 1800C.
TGHT max = 710A according to sintering data. TBHT max = 230A.
Chamber is currently being pumped down.
Thursday, June 16, 2016, 15:43
Target was not removed from evap2 after sintering, vented and cleaned windows only.
HS water valves already open.
Stepped up manually to 70A, vacuum stable.
Initiated auto-ramp at 1.0A/min for the TGHT and 0.5A/min for the TBHT with max setpoints of 600A and 230A respectively.
TGHT = 118A, 0.9V
TBHT = 90A, 1.1V
IGP1 = 7.3e-7 Torr
Friday, June 17, 2016, 12:14
TGHT has been tapped up manually to reach max desired temperature of 1800C
TGHT = 690A, 10.85V
TBHT = 230A, 3.88V
IGP1 = 4.9e-7 Torr
This is a lower current than the current required to reach 1800C during the sintering process.
For sintering, the max current was determined via extrapolation of trendline from raw data due to interference of coating on window and unable to take reliable readings from OMEGA.
For this conditioning process ~1800C is reached on the OMEGA since the window is still ~un-coated.
Will remain at 690A, ~1800C for several days to maximize conditioning process.
See attachment for raw data.
Monday, June 20, 2016, 09:01
At the end of the day on friday 17th, OMEGA read ~1750C - no change in the current or voltage, vacuum was stable, this was the max setpoints used to reach 1800C.
This morning OMEGA = 2040C
TGHT = 690A, 10.95V
vacuum stable at IGP1 = 1.8e-7 Torr.
Slightly more noticeable coating on window port, looks like a thin ink layer, still relatively thin coating [ see attached image]
Also attached is archive from over wknd to show vacuum stable, current unchanged and voltage negligibly changed [only gone up by ~0.1V]
Friday, June 24, 2016, 13:52
Container has remained at max setpoints for 7 days.
Initiating auto-cool for TGHT @ 2.0A/min and for TBHT @ 1.0A/min.
Will vent chamber and remove from evap2 to pass off for assembly monday morning.
See attachment for updated excel on temperature readings for the conditioning process.
Monday, June 27, 2016, 08:28
vented in air and removed this morning.
target looks good!
all discs remained nicely alligned.
discs expanded outwards ~1cm, pushed back in to keep target length at 16cm
no visible yellow crystals like previous SiC targets
endcaps inserted and expanded.
Rh foil inserted.
Ta heat shield foils removed, fins look good.
see photos attached for pictures of target - post conditioning.
coating on window very hard to remove. looked like a light sharpy pen coating on window. ended up scratching off with acetone and screw driver. couldn't remove all of it... |
Attachment 1: current_vs_voltage_vs_temp.xlsx
|
Attachment 2: Tapping_up_from_600A_to_1800C_for_conditioning.JPG
|
|
Attachment 3: Conditioning_window_port_at_2040C_mon_20th.jpg
|
|
Attachment 4: archive_of_conditioning_over_wknd.JPG
|
|
Attachment 5: current_vs_voltage_vs_temp.xlsx
|
Attachment 6: Evernote_Camera_Roll_20160627_10.jpg
|
|
Attachment 7: Evernote_Camera_Roll_20160627_102.jpg
|
|
Attachment 8: Evernote_Camera_Roll_20160627_1023.jpg
|
|
Attachment 9: Evernote_Camera_Roll_20160627_10233.jpg
|
|
|
310
|
Tuesday, July 26, 2016, 16:53 |
Laura Lambert | Ta | 41369-6 | HP-SIS | Done | Conditioning Ta#49 | Tuesday, July 26, 2016, 16:50
loaded into evap2
pumped down, HS water valves opened, no leaks detected.
tapped up manually to 35A
vacuum stable = 3.8e-6 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints at 230A for the TBHT and 600A for the TGHT.
Final desired temperature = 1800C
Wednesday, July 27, 2016, 09:20
IGP1 = 6.3e-7 Torr, vacuum stable.
TGHT = 232A, 2.7V
TBHT = 131A, 1.76V
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Wednesday, July 27, 2016, 15:46
TGHT = 600A, 8.87V
TBHT = 230A, 3.7V
IGP1 = 1.37e-6 Torr
OMEGA = 1640C
Increased max TGHT voltage to 12V
Tapped up manually to OMEGA = 1810C
TGHT = 675A, 10.21V
IGP1 = 2.2e-6 Torr
Will remain at max setpoints for the rest of the week and cool down over weekend.
Thursday, July 28, 2016, 08:34
TGHT = 675A, 10.41V
OMEGA = 1833C
Tapped down to 660A, 10.09V
OMEGA = 1805C
Friday, July 29, 2016, 13:57
OMEGA = 1814C
TGHT = 660A, 10.16V
TBHT = 230A, 3.72V
IGP1 = 3.43e-7 Torr
evap2 has remained at max setpoints for ~42hrs
conditioning complete.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, August 02, 2016, 13:39
vented in air and removed from evap2 this morning.
target looks good!
|
|
319
|
Wednesday, September 07, 2016, 15:02 |
John Wong | Empty | 39530-9 | HP-SIS | In progress | Sintering TaC coating container for SiC Target | Wednesday, September 07, 2016, 14:45
Container was previously coated with TaC solution and wrapped with 1-full length layer of Ta- heat shield around the fins.
Chamber is being pumped down. Vac at 5.6e-7 Torr before HS water valves were open; no leaks were detected.
Sintering Temperature 1900C (Omega slope @ 0.98); expected TGHT ~765A/11.90V, TGHT max at 230A.
Thursday, September 08, 2016, 18:14
At about 1600C, it was observed that the coating inside the tube seems to chip off (see attachment 1).
TGHT was ramped up to 745A/11.85V and TBHT to 230A/3.25V. Temperature measured on OMEGA/Mikron = 1914C/1881C; both instruments slopes set at 0.98.
Will remain at this TGHT current over night
Vac at 3.0e-6 Torr and coming down.
Friday, September 09, 2016, 11:01
Target has been heated at the stable temperature at 1914C (for OMEGA) and 1881C (for Mikron) with current at 745A/11.94V (see attachment 2) for almost 19 hours.
No fluctuation in p/s current or temperature was observed. The ramping up process is captured and can be view from the link below:
https://www.dropbox.com/sh/9lgtin54o17ds6j/AABn1-XjvK44mm74TjqTAmvta?dl=0
Pressure at 1.07e-6 Torr.
Cooling down TGHT at 2A/min and TBHT at 1A/min.
Continue to capture the cooling down process.
Friday, September 09, 2016, 15:17
While the target container was cooling down, the chip-like particle began obvious (see attachment 3).
Will inspect the container.. TGHT currently at 260A.
|
Attachment 1: coating_chipped_off.JPG
|
|
Attachment 2: autoTaC_sintering_20.JPEG
|
|
Attachment 3: coating_chipped_off_2.JPG
|
|
|
320
|
Monday, September 12, 2016, 17:22 |
John Wong | Empty | 39530-9 | HP-SIS | Failed | TaC coating chipped off |
John Wong wrote: |
Wednesday, September 07, 2016, 14:45
Container was previously coated with TaC solution and wrapped with 1-full length layer of Ta- heat shield around the fins.
Chamber is being pumped down. Vac at 5.6e-7 Torr before HS water valves were open; no leaks were detected.
Sintering Temperature 1900C (Omega slope @ 0.98); expected TGHT ~765A/11.90V, TGHT max at 230A.
Thursday, September 08, 2016, 18:14
At about 1600C, it was observed that the coating inside the tube seems to chip off (see attachment 1).
TGHT was ramped up to 745A/11.85V and TBHT to 230A/3.25V. Temperature measured on OMEGA/Mikron = 1914C/1881C; both instruments slopes set at 0.98.
Will remain at this TGHT current over night
Vac at 3.0e-6 Torr and coming down.
Friday, September 09, 2016, 11:01
Target has been heated at the stable temperature at 1914C (for OMEGA) and 1881C (for Mikron) with current at 745A/11.94V (see attachment 2) for almost 19 hours.
No fluctuation in p/s current or temperature was observed. The ramping up process is captured and can be view from the link below:
https://www.dropbox.com/sh/9lgtin54o17ds6j/AABn1-XjvK44mm74TjqTAmvta?dl=0
Pressure at 1.07e-6 Torr.
Cooling down TGHT at 2A/min and TBHT at 1A/min.
Continue to capture the cooling down process.
Friday, September 09, 2016, 15:17
While the target container was cooling down, the chip-like particle began obvious (see attachment 3).
Will inspect the container.. TGHT currently at 260A.
|
Monday, September 12, 2016, 16:54
The TaC coating chipped off from the surface and didn't get sintered with the container. (See attachment1).
There are a few possible reasons why this happened:
1. The coating was too think. This may cause the TaC layer to curl up while the heater was ramped up.
2. The coated material got brittle. The container was flushed with TaC (probably a few weeks ago?) before it went through the sintering process. Prolong exposure to air/light usually degrade the polymers viscoelasticity.
3. TaC solution has got bad. The particles can agglomerate over time and this can cause uneven surface.
4. Combination of all... ???
Anyway, the chipped off TaC layer was gently scraped off with a stainless steel rod. Then using kimwipes, i was able to remove most of the chipped off coating; it was not easy - especially trying to remove it from the inner tube.
Instead of "flushing" the tube with TaC, I decided to spray it with thin layer. And using the air supply, I could quickly dry the coating and installed it back to the evaporator for 2nd Round sintering as we are approaching the deadline!
. |
Attachment 1: Screen_Shot_2016-09-12_at_4.52.53_PM.png
|
|
|
321
|
Monday, September 12, 2016, 17:27 |
John Wong | Empty | 39530-9 | HP-SIS | Done | RUSH. Round 2: Sinering TaC coating |
John Wong wrote: |
John Wong wrote: |
Wednesday, September 07, 2016, 14:45
Container was previously coated with TaC solution and wrapped with 1-full length layer of Ta- heat shield around the fins.
Chamber is being pumped down. Vac at 5.6e-7 Torr before HS water valves were open; no leaks were detected.
Sintering Temperature 1900C (Omega slope @ 0.98); expected TGHT ~765A/11.90V, TGHT max at 230A.
Thursday, September 08, 2016, 18:14
At about 1600C, it was observed that the coating inside the tube seems to chip off (see attachment 1).
TGHT was ramped up to 745A/11.85V and TBHT to 230A/3.25V. Temperature measured on OMEGA/Mikron = 1914C/1881C; both instruments slopes set at 0.98.
Will remain at this TGHT current over night
Vac at 3.0e-6 Torr and coming down.
Friday, September 09, 2016, 11:01
Target has been heated at the stable temperature at 1914C (for OMEGA) and 1881C (for Mikron) with current at 745A/11.94V (see attachment 2) for almost 19 hours.
No fluctuation in p/s current or temperature was observed. The ramping up process is captured and can be view from the link below:
https://www.dropbox.com/sh/9lgtin54o17ds6j/AABn1-XjvK44mm74TjqTAmvta?dl=0
Pressure at 1.07e-6 Torr.
Cooling down TGHT at 2A/min and TBHT at 1A/min.
Continue to capture the cooling down process.
Friday, September 09, 2016, 15:17
While the target container was cooling down, the chip-like particle began obvious (see attachment 3).
Will inspect the container.. TGHT currently at 260A.
|
Monday, September 12, 2016, 16:54
The TaC coating chipped off from the surface and didn't get sintered with the container. (See attachment1).
There are a few possible reasons why this happened:
1. The coating was too think. This may cause the TaC layer to curl up while the heater was ramped up.
2. The coated material got brittle. The container was flushed with TaC (probably a few weeks ago?) before it went through the sintering process. Prolong exposure to air/light usually degrade the polymers viscoelasticity.
3. TaC solution has got bad. The particles can agglomerate over time and this can cause uneven surface.
4. Combination of all... ???
Anyway, the chipped off TaC layer was gently scraped off with a stainless steel rod. Then using kimwipes, i was able to remove most of the chipped off coating; it was not easy - especially trying to remove it from the inner tube.
Instead of "flushing" the tube with TaC, I decided to spray it with thin layer. And using the air supply, I could quickly dry the coating and installed it back to the evaporator for 2nd Round sintering as we are approaching the deadline!
.
|
Monday, September 12, 2016, 17:24
Chamber was pumped down to low 10e-6 Torr before HS water valves were open - no leaks detected.
TGHT/TBHT auto ramped at 2A/min to 600A/230A.
Will continue to monitor..
Wednesday, September 14, 2016, 17:04
TGHT was stepped up to 700A and temp 1851C (OMEGA), 1930C(Mikron). (see attachment 1). The container was heated over night before it was cool down at 2A/min.
Target container seems to properly sintered with TaC (see attachment 2); it will be used for SiC#35.
|
Attachment 1: Screen_Shot_2016-09-14_at_5.05.08_PM.png
|
|
Attachment 2: Screen_Shot_2016-09-14_at_5.03.48_PM.png
|
|
|
377
|
Tuesday, June 20, 2017, 16:07 |
Laura Lambert | Ta | 42218-6 | HP-SIS | Done | Conditioning Ta#53 | Tuesday, June 20, 2017, 15:58
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 50.3105g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
1 long Ta Heat shield.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
*Note: container accidentally engraved with WO#412218-6 when it should be WO#42218-6
Wednesday, June 21, 2017, 10:05
HS water valves opened, no leaks detected.
Tapped up manually to 40A, vacuum stable.
IGP1 = 5.53e-7 Torr
IGP2 = 4.35e-7 Torr
Initiating auto-ramp.
Wednesday, June 21, 2017, 14:48
TGHT stopped at 575A due to voltage limit sitting at 9V
Increased max setpoint of voltage to 14V.
Re-started auto-ramp starting at 575A.
Wednesday, June 21, 2017, 15:23
TGHT = 600A, 8.95V
TBHT = 230A, 3.72V
IGP1 = 1.55e-6 Torr
IGP2 = 1.62e-6 Torr
OMEGA = 1538C
Increasing max setpoint of TGHT to 700A
Wednesday, June 21, 2017, 16:21
TGHT = 700A, 10.57V
TBHT = 230A, 3.75V
IGP1 = 2.2e-6 Torr
IGP2 = 2.4e-6 Torr
OMEGA = 1730C
Increasing max setpoint of TGHT to 750A
Friday, June 23, 2017, 15:41
TGHT = 780A, 11.77V
TBHT = 230A, 3.77V
IGP1 = 4.8e-7 Torr
IGP2 = 4.8e-7 Torr
OMEGA = 1890C
Conditioning process complete.
Initiating auto-cool at 2.0A/min for the TGHT and 1.0A/min for the TBHT.
Monday, June 26, 2017, 10:51
Target vented in air and removed from evap2 today.
Endcaps inserted.
Target looks good!
|
Attachment 1: Ta#53.JPG
|
|
|
388
|
Friday, September 15, 2017, 10:56 |
Laura Lambert | Ta | 42218-10 | HP-SIS | Done | Conditioning Ta#54 | Friday, September 15, 2017, 09:44
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
1 long Ta Heat shield on each side, not incl center block.
No endcaps inserted, no Rh foil inserted.
Loaded into evap2 yesterday.
Chamber pumped down overnight.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 650A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
HS water valves were already open.
Tapped up manually to 40A, vacuum stable.
IGP1 = 1.1e-6 Torr
IGP2 = 7.8e-7 Torr
Initiating auto-ramp.
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
Monday, September 18, 2017, 08:38
TGHT = 647A, 10.04V
TBHT = 233A, 3.51V
IGP1 = 4.65e-7 Torr
IGP2 = 3.78e-7 Torr
OMEGA = 1700C
Increasing max setpoint of TGHT to 750A
Monday, September 18, 2017, 14:49
TGHT = 760A, 11.96V
TBHT = 233A, 3.54V
IGP1 = 8.9e-7 Torr
IGP2 = 8.6e-7 Torr
OMEGA = 1905C
Conditioning process complete.
Initiating auto-cool at 2.0A/min for the TGHT and 1.0A/min for the TBHT.
Tuesday, September 19, 2017, 10:38
Target was cooled down in sections so Yasser could take some temperature measurements with his thermocouples.
Vented in air and removed from evap2 this morning.
Target looks good.
Endcaps inserted and expanded.
Inserting Rh foil this afternoon.
Tuesday, September 26, 2017, 10:53
Tapped up manually to 230A over the course of ~35min.
TBHT striptool = 228A, 0.33V
TBHT direct readout = 230.4A, 0.33V
Vacuum good/ stable.
Minor spike to IGP1 = 1.5e-5 Torr ~5min after reached max setpoint of 230A.
IGP1 striptool = 3e-6 Torr
IGP1 direct readout = 3.79e-6 mBar
Initiating auto-cool at 2.0A/min.
|
Attachment 1: Capture.JPG
|
|
|
412
|
Thursday, June 21, 2018, 11:38 |
Aaron Schmidt | Ta | 42218-9 | HP-SIS | Done | Conditioning Ta#56 | Ta#56 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 14.01 g/cm3
Target length = 3.4 cm
Total Mass = 47.374 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 1469 g
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
Thursday, June 21, 2018, 11:430: Ta#56 loaded into Evap 2
Thursday, June 21, 2018, 11:37: Roughing
Thursday, June 21, 2018, 11:48 : Turbo pump started.
Thursday, June 21, 2018, 11:56 : Turbo pump at speed
Monday, June 25, 2018, 08:00: Vacuum @ 3.35e-07T
Monday, June 25, 2018, 08:05: TGHT/TBHT Power supplies switched on.
Monday, June 25, 2018, 09:35: Vacuum @ 3.23e-07T. Manually bump up TGHT to 40A.
Slope found / set.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 650A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
Monday, June 25, 2018, 11:41: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 300 / 180 A
Monday, June 25, 2018, 13:28: Check: Vacuum @ 1.08e-06T. TGHT / TBHT @ 248 / 110 A
Monday, June 25, 2018, 13:50: TGHT ramping halted momentarily. Limit increased to 350 A, continue ramping.
Monday, June 25, 2018, 14:44: Check: Vacuum @ 1.08e-06T. TGHT / TBHT @ 350 / 180 A. (hold till am)
Omega: 1033 deg C
Tuesday, June 26, 2018, 08:37: Vacuum @ 3.03e-07T. Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 600 / 230 A . Omega: 1010 deg C (approx)
Tuesday, June 26, 2018, 11:25: Vacuum @ 1.34e-06T. TGHT / TBHT @ 248 / 110 A. Omega: 1605 deg C (approx)
Auto-ramping TGHT @ 2 A per min to 650 A
Tuesday, June 26, 2018, 12:06: Limited at 608A ? Display still ramping past the auto-ramp limit.
Tuesday, June 26, 2018, 12:24 : Auto ramp halted. Display brought to 610 A. Readback 603 A
Tuesday, June 26, 2018, 12:41: Voltage limit adjusted to 12.00V. Mnaualy increased TGHT to 620 A. Auto-ramping TGHT @ 2 A per min to 650 A
Tuesday, June 26, 2018, 12:59: Check: Vacuum @ 1.53e-06T. TGHT / TBHT @ 650 / 230 A.
Omega: 1747 deg C
Tuesday, June 26, 2018, 15:07: Check: Vacuum @ 9.73e-07T. TGHT / TBHT @ 650 / 230 A. (hold till am)
Omega: 1760 deg C
Wednesday, June 27, 2018, 07:49: Check: Vacuum @ 5.06e-07T. TGHT / TBHT @ 650 / 230 A.
Omega: 1796 deg C. Begin auto-ramping TGHT to 700 A @ 2 A per min with pause at 675 A. Monitor.
Wednesday, June 27, 2018, 08:00: Check: Vacuum @ 5.80e-07T. TGHT / TBHT @ 675 / 230 A.
Omega: 1843 deg C. Begin auto-ramping TGHT to 700 A @ 2 A per min. Monitor.
Wednesday, June 27, 2018, 08:16: Vacuum @ 7.45e-07T. TGHT / TBHT @ 700 / 230 A. Omega: 1890 deg C (approx).
Wednesday, June 27, 2018, 08:23: Vacuum @ 8.53e-07T. TGHT / TBHT @ 707 / 230 A. TGHT Voltage= 10.783V. Omega: 1906-1913 deg C. Desired temperature = 1900C reached.
Wednesday, June 27, 2018, 13:11: Vacuum @ 6.77e-07T. Omega: 1902-1915 deg C
Wednesday, June 27, 2018, 14:53: Begin auto-cooling TGHT / TBHT @ - 2 / -1 A per min overnight.
Thursday, June 28, 2018, 07:39: Power supplies off. Turbo pump off.
Thursday, June 28, 2018, 09:38: Vented. Remove From Evap 2. |
Attachment 1: Ta#56_Evap_2_Conditioning.docx
|
|
476
|
Tuesday, March 10, 2020, 09:34 |
Darwin Ortiz Rosales | Empty | 42218-8 | HP-SIS | Done | TaC coating/sintering | Monday, March 9, 2020, 03:15
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Tuesday, March 10, 2020, 09:17
Starting manual ramp to 50 A @ approximately 2A/min
IGP1 = 3.73e-7 Torr after opening water line pressure slowly incresed to 4.4e-7 Torr
TBHT also has Chiller interlock reached out to controls for removal.
Tuesday, March 10, 2020, 10:47
Chiller Interlock removed for TBHT. Started manual ramp to 50A @ approximately 2A/min
Tuesday, March 10, 2020, 11:15
allowing to stabilize at 50A on TGHT and TBHT
IGP1= 7.9 e=7 Torr and trending up
Tuesday, March 10, 2020, 12:09
Pressure on IGP1 spiked. Allowing to stabilize.
Tuesday, March 10, 2020, 14:36: Stopped By to check. Vacuum @ 3.02e-03T. Turbo pump appears to have tripped. Shut off Both PS. Prepare to vent. - Aaron S.
Tuesday, March 10, 2020, 14:48: Tightened all fittings (Just in case). HS side & HS waterline at the feed through. Roughing.
Tuesday, March 10, 2020, 15:06: TP1 @ 38KRPM 1.34e-04T & dropping. TGHT & TBHT PS on. Monitor before heating. -AS
Wednesday, March 11, 2020, 06:25: Vacuum @ 3.39e-07T. TGHT / TBHT PS on. - AS
Wednesday, March 11, 2020, 06:26: Manually tapped up TGHT / TBHT to 10 / 10 A. Ok.
Wednesday, March 11, 2020, 06:28: Auto-ramping TGHT / TBHT @ 4 A per min to 50 / 50 A.
Wednesday, March 11, 2020, 07:07: Vacuum @ 3.64e-07T. TGHT / TBHT @ 50 A. All appears stable. - AS
Wednesday, March 11, 2020, 07:036
Started autoramp at 2 A/min
IGP1= 3.6e-7 Torr
Wednesday, March 11, 2020, 08:06
TGHT=10 5A, 1.3 V TBHT = 105 A, 1.2 V
pressure rising fast; manual ramp down to 95A on both TGHT and TBHT
Wednesday, March 11, 2020, 09:54
IGP1= 4.7e-6 Torr; TGHT = 93.1 A, 1.2 V; TBHT = 95.1 A, 1.1 V
start autoramp at 1A/min (0.5 A/30s)
IGP1= 1.28e-5 Torr
TGHT = 108.3 A, 1.44 V
TBHT = 110 A, 1.29 V
Stop autoramp
Wednesday, March 11, 2020, 10:25
IGP1= 5.9e-5 Torr
manually tapped TGHT and TBHT set-current to 105 A respectively.
pressure dropping.
Wednesday, March 11, 2020, 11:18
IGP1=8.0e-06 Torr
manually ramp to set-current 115 A for both TGHT and TBHT at approximately 2A/ min
allow to stabilize before proceeding
Wednesday, March 11, 2020, 12:12
IGP1=7.02e-6 Torr
TGHT = 112.7 A, 1.5 V
TBHT = 114.6 A, 1.4 V
Auto-ramping at 1A/min TGHT to 430 A and TBHT top 230A
Wednesday, March 11, 2020, 18:45
IGP1= 1.2 e-06 Torr
TGHT=421.8 A, 6.2 V
TBHT = 231.9 A, 3.1 V
auto-ramp TGHT at 1A/min to set-current 530A
Wednesday, March 11, 2020, 23:08
IGP1= 1.3e-6 Torr
TGHT= 519.9 A, 7.87V
TBHT = 232.0 A, 3.1 V
start autoramp TGHT to 600A at 1A/min
Wednesday, March 11, 2020, 23:36
IGP1= 1.6e-6 Torr
TGHT = 542.9 A, 8.2V
TBHT = 232.9 A, 3.1V
Set autoramp to 750A on TGHT at 0.5 A/min
Thursday, March 12, 2020, 06:55
The Voltage set on TGHT was too low so current had not increased
IGP1= 1.5e-6 Torr
TGHT = 640 A, 10V
TBHT 232/9A, 3.1V
Oncrease TGHT voltage set to 14.5 and start autoramp at 3A/min to 750 A
Thursday, March 12, 2020, 7:43
TGHT = 735.7 A, 11.8V
OMEGA = 1595C
Auto -ramp set to 780 A for TGHT
Thursday, March 12, 2020, 7:58
OMEGA = 1655 C
TGHT set to 800 A at 3A/min
Thursday, March 12, 2020, 9:42
OMEGA = 1704 C
TGHT = 789.5 A, 13.0 V
Manual tap up to 837 A set on TGHT and 821 A readback
Thursday, March 12, 2020, 10:00
TGHT readback = 821.0 A, 13.7 V
OMEGA = 1744 C
TBHT same as previous entry.
Thursday, March 12, 2020, 10:35
Tapped up TGHT to 832.6 A, 13.8 V
OMEGA = 1759 C
TBHT = 232.9 A, 3.6 V
Will not tap further.
Thursday, March 12, 2020, 13:22
IGP1 = 5.0 e-06 Torr (stable)
TGHT = 832.7 A readback (849 A set), 13.7V
TBHT = 232.9 A, 3.6 V
OMEGA = 1758 C
Start cooling at TGHT 3A/min
Thursday, March 12, 2020, 14:08
IGP1= 1.32e-06 Torr
TGHT = 706 A, 11.0 V
TBHT = same as previous
OMEGA = 1583C
Start cooling TBHT at 1A/min continue cooling TGHT at 3A/min
Friday, March 13, 2020, 08:18
IGP1= 3.9e-8 Torr
Will unload sintered container
|
Attachment 1: SiC#40.PNG
|
|
|
477
|
Friday, March 13, 2020, 14:21 |
Darwin Ortiz Rosales | SiC | 42218-8 | HP-SIS | Done | Conditioning of SiC discs (sintering) (RUSH) | Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at both ends.
Initially to ramp TGHT and TBHT to 50A at 1A/min
Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically to reach 530A A (Omega slope set = 0.990)
Then temperature = 1800 (C using slope 1.08 at after 1700C manually and automatically ramp to 700A then TGHT will be tapped up accordingly to reach desired Temp).
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
Evaluation discs not included because no space.
Total Green disc mass measured = 58.78 g
Friday, March 13, 2020, 14:22
Container loaded and pressuring down started without any pump issues.
Friday, March 13, 2020, 23:26
IGP1= 9.1e-07 Torr
Start auto tap at .25A/min to 50A on both TBHT and TGHT
Saturday, March 14, 2020, 07:09
IGP1=6.9e-6 Torr
TGHT = 49.1 A, 0.58V
TBHT = 49.2A, .49V
Continue ramp to 80 A on both heaters at .0.25A/min (good vacuum 3.0 e-04 Torr, bad vaccum 5.0 e-04 Torr
Saturday, March 14, 2020, 08:22
IGP1=6.8 e-05 Torr
Pressure spike TGHT =63.7 A, 0.77 V; TBHT = 60.0 A , 0.62 V
Aborted ramp alow to stabilize (Tapped TBHT to 63.8 A
Saturday, March 14, 2020, 12:16
IGP1= 8.1e-05 Torr
start autoramp at 0.25A/min
Saturday, March 14, 2020, 17:47
IGP1= 2.9e-05 Torr
TGHT= 78.4A, 1.0 V
TBHT = 79.4A, .88 V
manual and automatic tap up to 740A TGHT and 230A TBHT then tap manually to 1800 C (mostly at .075 A/min and increasing to 1A /min as pressure stabilizes)
Sunday, March 15, 2020, 22:40
OMEGA = 1711 C
TGHT = 784,6 A, 12.9V (readback)
TBHT = 232 A, 3.5 V
Tap TGHT to 800 A readback set to 815A
Sunday, March 15, 2020, 23:20
OMEGA =1801 C
TGHT = 799.2 A, 13.3 V, TBHT = 232.9, 3.6V
Start gradual tap-down as temperature rising (1810 C at end of this note)
Sunday, March 15, 2020, 23:49
OMEGAA = 1818 C
TGHT = 769.9A, 12.6 V; TBHT = 232.9 A, 3.6 V
Temperature dropping tapped back up to 799 A on TGHT read back (set to 815 A)
Monday, March 16, 2020, 04:10
OMEGA = 1395 C (not reliable)
TGHT = 799.2 A, 13.2 V
TBHT = 232.9 A, 3.6 V
IGP1 = 2.2 e-06 Torr
Initiate cooling at -1.5 A/min on TGHT to 600A (at 600 A increase cooling rate to 3 A/min ; at 300 A increase cooling to 4 A/min and start TBHT cooling at 1 A/min; at `200 A on TGHT increase cooling to 4 A/min and TBHT 2 A/min)
Monday, March 16, 2020, 09:43
TGHT = 0 A , 0.02V
TBHT = 53,2 A, .56 V (increase cooling to 4 A/min)
IGP1= 1.12e-07 Torr
Monday, March 16, 2020, 10:37
IGP1= 9.5 e -8 Torr
TGHT and TBHT = 0A, 0V
Will unload container
Monday, March 16, 2020, 12:40
Ten discs removed for evaluation (6 from left side and 4 from right side)
two graphite discs placed at each end as well as two TaC coated and sintered end-caps
total length after sintering = 17.8 cm
|
|
488
|
Monday, June 15, 2020, 14:28 |
Darwin Ortiz Rosales | Empty | 42218-7 | HP-SIS | Done | TaC coating/sintering | Monday, June 15, 2020, 13:30
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Tuesday, June 16, 2020, 08:55
IGP1= 4.2e-7 Torr
Starting ramp to 50A at 0.2A/min for both TGHT and TBHT. Observing pressure behaviour.
Tuesday, June 16, 2020, 14:14
IGP1 = 9.0e-7 Torr
TGHT = 50.3 A, 0.6 V
TBHT = 49.4 A, 0.54 V
Set TGHT to 400A and TBHT to 230A
Tuesday, June 16, 2020, 16:58
IGP1 = 7.32e-7 Torr
TGHT = 82.3A, 1.0 V
TBHT = 81.8 A, 0.96V
Will try to increase ramp rate to 2 A/min for both TGHT and TBHT
Tuesday, June 16, 2020, 17:30
Pressure spike.
IGP1 = 2.5e-5Torr
TGHT = 44.1 A, 0.57 V
TBHT = 43.0 A, 0.49 V
Will return to 0.2A/ min ramp rate for both heaters
Thursday, June 18, 2020, 20:26
Autoramped to 720A , 11.6V on TGHT at 0.2A/min
OMEGA = 1850C
Manually ramped to 740 A , on TGHT while TBHT remains at 230A
OMEGA= 1885 C
IGP1=4.6e-06 Torr trending down
Will remain at this temperature for next 4 hours
NOTE* Current on TGHT very unstable (oscillates)
Friday, June 19, 2020, 11:31
Last night at 00:15 am started cooling TGHT at -2A/min and TBHT at -0.2 A/min
(The elog entry was not submitted and computer restarted overnight so notes were lost).
at 6:30 am Friday June 19, 2020
Increased TBHT cooling to -2A/min and decreased THGT cooling to -1A/min
Monday, June 22, 2020, 13:54
IGP1= 8.1e-8 Torr
Evaporator vented and container pulled out. There is slight peeling near one end of the container. This area should be on the outside of the end-caps so the container should be usable.
Files to be uploaded later.
|
|
549
|
Wednesday, April 28, 2021, 11:57 |
Darwin Ortiz Rosales | SiC | 42218-7 | HP-SIS | Done | sintering discs for SiC#41 (or back-up for #40) | Wednesday, April 28, 2021, 11:54
Total number of foils: 449 (not including analysis discs)
Total length packed 16.7 cm
5 extra analysis discs and 2 dr. Blade discs
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
One Ta disc inserted at front end
Initially to ramp TGHT and TBHT to 50A at0.5 A/min
Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically to reach 530A A (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
Thursday, April 29, 2021, 10:09
IGP1 = 6.5 e-07 Torr
Start heating at 0.5 A/min to 50 A on both TGHT and TBHT
Thursday, April 29, 2021, 21:45
IGP1= 7.7 e-06
TGHT = 50.3A , 0.59 V
TBHT = 49.4 A, 0.56 V
Pressure is taking a while to equilibrate. Will wait a bit more to continue heating
Thursday, April 29, 2021, 23:49
IGP1 = 7.2 e-06 Torr
will start ramping at 0.5 A/min to 100 A
Saturday, May 01, 2021, 20:09
Friday, April 30, 2021, 08:19
IGP1 pressure higher than bad vacuum. Stopped autoramp. Will allow vacuum to come back down and restart ramp.
Saturday, May 01, 2021, 09:04
Yesterday the system had tripped. All pumps had turned off and the pressure was found at 0.005 torr
vacuum was restarted.
Current IGP1= 6.5e-07 Torr
Restarting heaters.
Autoramp at 0.5A/min to 20A on both TGHT and TBHT
Saturday, May 01, 2021, 10:48
IGP1=5.9e-7 Torr
TGHT = 20.0 A, 0.24V
TBHT = 20A, 0.20V
Autoramp at 0.5A/min to 40A both TGHT and TBHT
Saturday, May 01, 2021, 13:26
TGHT = 40.0 A, 0.47 V
TBHT= 39A, 0.44V
IGP1= 5.5 e-07 Torr
Autoramp at 0.5A/min to 60 A on both TGHT and TBHT
Saturday, May 01, 2021, 20:09
TGHT = 60.0 A, 0.72V
TBHT = 59.4 A, 0.69V
IGP1= 4.4e-07 Torr
Autoramp at 0.5A/min to 100 A on both TGHT and TBHT
Sunday, May 02, 2021, 18:30
IGP1= 1.7 e-06 Torr
TGHT =100A, 1.3V
TBHT = 99.9A, 1.3V
Autoramp both heaters at 0.25A/min to 120A and monitor
Sunday, May 02, 2021, 18:45
pressure increase to 4.1e-06 Torr. TBHT unexpectedly rose to 120A and was manually tapped back down to 104 A. Will keep both , TGHT and TBHT, at 104 A for a while.
Sunday, May 02, 2021, 19:50
Stepping at 0.5A/min to 105A then to 110 A on both TGHT and TBHT
Sunday, May 02, 2021, 22:10
Will leave both TGHT and TBHT at 110 A until pressure comes back down
currently IGP1= 1.3e-05 Torr
Monday, May 03, 2021, 09:35
IGP1= 2.2 e-06 Torr
Tapping TGHT and TBHT to 115A
Monday, May 03, 2021, 11:30
Tapping TGHT and TBHT to 120A @ 1A/min
Monday, May 03, 2021, 18:38
IGP1= 5.4e-06 Torr
TGHT = 130.3 A, 1.8 V
TBHT = 129.1 A, 1.8 V
Continue gradual ramping at 1A/min in increments of 5 A
Tuesday, May 04, 2021, 09:27
IGP1= 3.2e-5 Torr
TGHT = 400 A, 6.0V
TBHT = 232 A, 3.6V
OMEGA = 1104 C
waiting for pressure to drop then will continue heating
Tuesday, May 04, 2021, 17:27
TGHT = 420.1 A, 6.5V
TBHT= 232A, 3.6V
OMEGA = 1139 C
IGP1= 1.15e-5 Torr
will increase ramp up at 0.5A/min to 430A and hold (TGHT)
Tuesday, May 04, 2021, 22:43
TGHT= 430A, 6.6V
TBHT = 232.8A, 3.6V
OMEGA= 1157 C
IGP1=6.6e-6 Torr
Set Autoramp at 0.5A/min to 540 A (TGHT)
Wednesday, May 05, 2021, 08:09
IGP1= 7.5e-06 Torr
TGHT = 534 A, 8.5V
TBHT=232 A, 3.7 V
OMEGA = 1485
Continue ramp at 0.5A/min to to 600 A on TGHT
Wednesday, May 05, 2021, 15:07
IGP1=1.2e-5 Torr
TGHT=601A, 9.6V
TBHT= 232A, 3.7V
OMEGA =1600 C
ramp to 650A on TGHT at 0.5A/min
Wednesday, May 05, 2021, 20:05
Tapped TGHT to 694A, 11.4 V (manually)
TBHT= 232A, 3.7V
OMEGA = 1790 C
IGP1= 2.5e-05 Torr
Will monitor Pressure and temperature . Will start 4 hour count.
Wednesday, May 05, 2021, 22:03
OMEGA = 1765 C
TGHT = 694A, 11.5V
TBHT = 232A, 3.8 V
IPG1= 1.6e-05 Torr
Manually bumping TGHT to 700 A
|
|