211
|
Wednesday, June 10, 2015, 12:15 |
John Wong | Empty | 40860-1 | LP-IG-LIS | In progress | Sintering TaC coating container for UCx |
|
|
|
212
|
Wednesday, June 10, 2015, 16:35 |
John Wong | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up |
|
|
|
215
|
Friday, June 12, 2015, 16:08 |
John Wong | Empty | 40860-1 | LP-IG-LIS | In progress | Re-Sintering TaC coating container for UCx |
|
|
|
216
|
Sunday, June 14, 2015, 09:40 |
John Wong | Empty | 40860-1 | LP-IG-LIS | Done | Re-Sintering TaC coating container for UCx |
|
|
|
217
|
Monday, June 15, 2015, 15:30 |
John Wong | Empty | 41177-2 | LP-SIS | Done | Re-Sintering TaC coating container for ZrC back-up |
|
|
|
219
|
Monday, June 22, 2015, 13:11 |
John Wong | Empty | 38817-6 | HP-SIS | In progress | RUSH! Sintering TaC coated container for SiC | Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped
with 3 layers of Ta heat-shield. Air |
|
|
221
|
Tuesday, June 23, 2015, 12:26 |
John Wong | SiC | 38817-6 | HP-SIS | In progress | RUSH! SiC backup target undergoes sintering process | Tuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. |
|
|
224
|
Monday, June 29, 2015, 07:05 |
John Wong | ZrC | 41177-2 | LP-SIS | Done | Sintering back-up ZrC |
|
|
|
226
|
Monday, June 29, 2015, 23:42 |
John Wong | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
|
228
|
Monday, July 06, 2015, 12:07 |
John Wong | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
|
231
|
Thursday, July 30, 2015, 17:07 |
John Wong | | | | Maintenance | Connect NALCW to EVAP1 | Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW. The city water has been removed |
|
|
232
|
Friday, July 31, 2015, 15:10 |
John Wong | | | | Maintenance | Installed leftside port | Friday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2. Leak check was |
|
|
233
|
Friday, July 31, 2015, 15:51 |
John Wong | Ta | | TARGET BOAT | In progress | Test for homogeneity: Sintering TaC coating on a Ta tube | Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The
inner of the tube was filled with TaC solution |
|
|
237
|
Wednesday, August 19, 2015, 17:26 |
John Wong | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
|
239
|
Thursday, August 20, 2015, 17:15 |
John Wong | Ta | | HP-SIS | Done | Conditioning Ta#46 Target |
|
|
|
240
|
Monday, August 24, 2015, 12:58 |
John Wong | | | | Maintenance | Replacing turbo pump, IEVAP2TP1 | Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
The pump couldn't get on full speed |
|
|
242
|
Thursday, August 27, 2015, 16:37 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating container for SiC Target |
|
|
|
243
|
Tuesday, September 01, 2015, 17:20 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 | Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. |
|
|
245
|
Tuesday, September 08, 2015, 15:56 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
|
|
|
246
|
Wednesday, September 09, 2015, 18:24 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
|
|