  211   Wednesday, June 10, 2015, 12:15 John WongEmpty40860-1LP-IG-LISIn progressSintering TaC coating container for UCx

    

       
            
  
  212   Wednesday, June 10, 2015, 16:35 John WongEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up

    

       
            
  
  215   Friday, June 12, 2015, 16:08 John WongEmpty40860-1LP-IG-LISIn progressRe-Sintering TaC coating container for UCx

    

       
            
  
  216   Sunday, June 14, 2015, 09:40 John WongEmpty40860-1LP-IG-LISDoneRe-Sintering TaC coating container for UCx

    

       
            
 2coats.png 
  217   Monday, June 15, 2015, 15:30 John WongEmpty41177-2LP-SISDoneRe-Sintering TaC coating container for ZrC back-up

    

       
            
  
  219   Monday, June 22, 2015, 13:11 John WongEmpty38817-6HP-SISIn progressRUSH! Sintering TaC coated container for SiC Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped
with 3 layers of Ta heat-shield.  Air
  
  221   Tuesday, June 23, 2015, 12:26 John WongSiC38817-6HP-SISIn progressRUSH! SiC backup target undergoes sintering processTuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. 
  
  224   Monday, June 29, 2015, 07:05 John WongZrC41177-2LP-SISDoneSintering back-up ZrC

    

       
            
 Screen_Shot_2015-06-29_at_7.14.12_AM.png 
  226   Monday, June 29, 2015, 23:42 John WongEmpty41369-2LP-SISIn progressSintering TaC coating container

    

       
            
  
  228   Monday, July 06, 2015, 12:07 John WongEmpty41369-2LP-SISIn progressSintering TaC coating container

    

       
            
 Screen_Shot_2015-07-06_at_11.52.16_AM.png 
  231   Thursday, July 30, 2015, 17:07 John Wong   MaintenanceConnect NALCW to EVAP1  Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW.  The city water has been removed
  
  232   Friday, July 31, 2015, 15:10 John Wong   MaintenanceInstalled leftside portFriday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2.  Leak check was
  
  233   Friday, July 31, 2015, 15:51 John WongTa TARGET BOATIn progressTest for homogeneity: Sintering TaC coating on a Ta tube Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC.  The
inner of the tube was filled with TaC solution
 Screen_Shot_2015-07-31_at_3.46.10_PM.png 
  237   Wednesday, August 19, 2015, 17:26 John WongTa HP-SISIn progressConditioning Ta#46 Target

    

       
            
  
  239   Thursday, August 20, 2015, 17:15 John WongTa HP-SISDoneConditioning Ta#46 Target

    

       
            
  
  240   Monday, August 24, 2015, 12:58 John Wong   MaintenanceReplacing turbo pump, IEVAP2TP1 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
 The pump couldn't get on full speed
  
  242   Thursday, August 27, 2015, 16:37 John WongEmpty HP-FEBIADDoneSintering TaC coating container for SiC Target

    

       
            
  
  243   Tuesday, September 01, 2015, 17:20 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. 
  
  245   Tuesday, September 08, 2015, 15:56 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG 
  246   Wednesday, September 09, 2015, 18:24 John WongSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-09_at_5.53.15_PM.png 