Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 18 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  104   Tuesday, January 21, 2014, 11:33 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  105   Tuesday, January 21, 2014, 11:56 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  106   Wednesday, January 22, 2014, 09:49 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  107   Wednesday, January 22, 2014, 13:46 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  108   Wednesday, January 22, 2014, 15:13 John WongEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  109   Wednesday, January 22, 2014, 18:22 John WongEmpty40282-4TARGET BOATProblemsSintering Ta target boat with TaC coating (IEVAP2:TBHT2 water signal problem)

    

       
            
 Screen_Shot_2014-01-22_at_6.10.50_PM.pngTargetboat_heatingup2.JPEG 
  110   Thursday, January 23, 2014, 16:22 Laura LambertEmpty40282-4TARGET BOATProblems resolvedSintering Ta target boat with TaC coating

    

       
            
 IMG_20140123_144725917.jpgIMG_20140123_144736614.jpg 
  111   Friday, January 24, 2014, 14:25 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  112   Monday, January 27, 2014, 10:59 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  113   Tuesday, January 28, 2014, 11:57 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
 IMG_20140128_111526059.jpgIMG_20140128_111456815.jpg 
  114   Tuesday, January 28, 2014, 13:09 Laura LambertEmpty40282-4TARGET BOATDoneSintering Ta target boat with TaC coating

    

       
            
  
  115   Tuesday, January 28, 2014, 15:46 Laura Lambert 40282-4TARGET BOATFailedSintering TaC coated end caps Tuesday, January 28, 2014, 15:43
The target containers end-caps were
coated with TaC spray and let dry.
 end_capsIMG_20140131_101959838.jpgfeb11-2014(3).jpgfeb11-2014(2).jpg 
  188   Friday, May 01, 2015, 10:50 Laura Lambert 40282-4TARGET BOATIn progressSintering four different ZrC samples Friday, May 01, 2015, 10:27
Four different samples of ZrC are
loaded into a target boat.
 1.jpg2015-04-30_15.24.57.jpg 
  189   Monday, May 04, 2015, 17:26 John Wong 40282-4TARGET BOATIn progressSintering four different ZrC samples

    

       
            
  
  190   Wednesday, May 06, 2015, 13:59 Laura Lambert 40282-4TARGET BOATDoneSintering two different ZrC samples Wednesday, May 06, 2015, 13:54
Two different samples of ZrC are
wrapped in graphite sheet and loaded into
 evap2_data_from_two_samples_-_18mm_hand_punched.xlsx 
  191   Friday, May 08, 2015, 15:56 Laura Lambert 40282-4TARGET BOATDoneSintering four different ZrC samples

    

       
            
 evap2_data_from_four_samples.xlsx 
  192   Wednesday, May 13, 2015, 16:01 Laura Lambert 40282-4TARGET BOATDoneSintering three different ZrC samples Wednesday, May 13, 2015, 15:21
Three different samples of ZrC
 evap2_data_from_three_samples_-_final_test_run.xlsx 
  374   Wednesday, June 14, 2017, 15:51 Laura LambertSiC40282-4TARGET BOATIn progressSintering SiC pellets Wednesday, June 14, 2017, 15:49
Pellets previously made by Marla
and weighed.
  
  375   Friday, June 16, 2017, 10:42 Marla CervantesSiC40282-4TARGET BOATDoneSintering SiC pellets

    

       
            
  
  376   Friday, June 16, 2017, 15:14 Laura LambertSiC40282-4TARGET BOATDoneSintering SiC pellets

    

       
            
 20170619_111816.jpg20170619_111848.jpg 
ELOG V2.9.2-2455