  Evaporator_2, Page 17 of 34  Not logged in ELOG logo
ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  95   Wednesday, November 06, 2013, 17:36 John WongTaCTarget Boat #2 In progressTesting TaC matrix coating The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives.  The coating solution will
  
  97   Wednesday, January 15, 2014, 17:45 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.
 No Ta-heat shields are used.
  
  99   Friday, January 17, 2014, 09:34 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  101   Friday, January 17, 2014, 12:52 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  108   Wednesday, January 22, 2014, 15:13 John WongEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  109   Wednesday, January 22, 2014, 18:22 John WongEmpty40282-4TARGET BOATProblemsSintering Ta target boat with TaC coating (IEVAP2:TBHT2 water signal problem)

    

       
            
 Screen_Shot_2014-01-22_at_6.10.50_PM.pngTargetboat_heatingup2.JPEG 
  122   Friday, March 07, 2014, 22:25 John Wong 40282-3TARGET BOATProblemsSintering TaC coated end caps

    

       
            
  
  123   Monday, March 10, 2014, 11:45 John Wong   MaintenanceReplaced Backing Pump hoseMonday, March 10, 2014, 11:44
Rick replaced the backing pump hose
from 1.5" to 2.0" for better flow. 
  
  124   Monday, March 10, 2014, 11:52 John Wong   Problems resolvedThe Chiller is downMonday, March 10, 2014, 11:45
The chiller tripped off on March
7, 2014.
  
  125   Friday, March 21, 2014, 16:18 John WongTiC38817-8HP-SISIn progressSintering TiC  Friday, March 21, 2014, 16:09
Target container is loaded with 360
Discs of TiC.  
  
  127   Wednesday, March 26, 2014, 18:23 John WongTiC38817-8HP-SISDoneSintering TiC#4

    

       
            
  
  128   Thursday, March 27, 2014, 18:04 John Wong  TARGET BOATIn progressStudying WC sintering on Ta surfaceThursday, March 27, 2014, 17:38
TEST #1
WC slurry was prepared in non-aqueous
  
  129   Thursday, April 24, 2014, 18:13 John Wong  TARGET BOATDoneTests: Sintering carbon Mesh coated with WC Thursday, April 24, 2014, 17:25
The purpose of this experiment is
to see if the carbon mesh is suitable for
  
  136   Monday, June 16, 2014, 17:42 John WongTa40282-2LP-SISIn progressConditioning Ta#43 target

    

       
            
 Ta#43_3.JPEG 
  140   Friday, June 20, 2014, 16:22 John WongSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
  
  142   Tuesday, June 24, 2014, 23:57 John WongSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
 2014-06-24_16.57.17.jpg 
  143   Wednesday, July 23, 2014, 15:07 John WongEmpty40282-3LP-SISIn progressSintering TaC coated target container Wednesday, July 23, 2014, 15:07
Target container is coated with TaC. 
No Ta-heat shields are used.
  
  146   Tuesday, July 29, 2014, 11:23 John Wong 40282-3LP-SISIn progressSintering ZrC# 6 target

    

       
            
  
  151   Tuesday, August 05, 2014, 17:20 John Wong  TARGET BOATIn progressSintering TaC coated end caps

    

       
            
  
  152   Wednesday, August 06, 2014, 16:10 John WongTa38817-9HP-SISIn progressConditioning Ta targetWednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs. 
Total packed length 4.5cm
  