25
|
Tuesday, May 22, 2012, 15:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
|
27
|
Wednesday, May 23, 2012, 17:45 |
John Wong | BeO | Target boat #2 | | Done | Sintering BeO pellets #3 |
|
|
|
28
|
Monday, May 28, 2012, 11:15 |
John Wong | | | | Problems | Chiller is leaking water | Monday, May 28, 2012, 11:08
It was discovered this morning that
the Evaporator #2 chiller was leaking water |
|
|
30
|
Monday, June 11, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Problems | End caps vaporized |
|
|
|
32
|
Wednesday, June 20, 2012, 22:33 |
John Wong | NiO | Ta target boat | | Done | NiO development |
|
|
|
33
|
Thursday, June 21, 2012, 18:13 |
John Wong | NiO | Ta target boat | | Failed | NiO development - Container broke! |
|
|
|
34
|
Thursday, July 12, 2012, 17:55 |
John Wong | NiO | targetboat (TaC coated) | | Maintenance | NiO development- test#2 | Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm, |
|
|
35
|
Tuesday, July 17, 2012, 16:00 |
John Wong | | targetboat (TaC coated) | | Done | Sintering TaC coated regular- & D-endcaps | Tuesday, July 17, 2012, 15:45
Target boat is filled with TaC coated
regular- and D-endcaps. |
|
|
36
|
Thursday, July 19, 2012, 17:05 |
John Wong | Empty | 37918-3 | LP-FEBIAD | Done | Coating target oven /w TaC & sintering for UCx#5 | Thursday, July 19, 2012, 16:58
The target container was coated with
TaC. |
|
|
37
|
Sunday, July 22, 2012, 20:51 |
John Wong | NiO | 38481-7 | HP-FEBIAD | Done | Sintering NiO#1 | Sunday, July 22, 2012, 20:30
The NiO target materials were loaded
into the container today. |
|
|
38
|
Monday, July 30, 2012, 15:42 |
John Wong | | | | Problems | Chiller maybe leaky | Monday, July 30, 2012, 15:38
The evaporator was used for the processing
the NiO target for 8 days and it was discovered |
|
|
42
|
Tuesday, August 14, 2012, 15:11 |
John Wong | | | | Maintenance | Replacing Cu-heatshield insulators | Tuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during |
|
|
43
|
Tuesday, August 14, 2012, 15:57 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Done | Testing endcaps inserted /w the new expansion tool | Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May
2011 with the Evaporator#1. The target |
|
|
44
|
Tuesday, August 14, 2012, 17:11 |
John Wong | | | | Failed | Sintering Ta2O5 coating on Ta foil failed |
|
|
|
45
|
Wednesday, August 22, 2012, 17:36 |
John Wong | Empty | 39165-5 | LP-SIS | Done | Coating target oven /w TaC & sintering for UCx#5 | Wednesday, August 22, 2012, 17:25
Note: LP-FEBIAD target container
( W.O#37918-3) was coated with TaC and sintered |
|
|
51
|
Wednesday, October 10, 2012, 16:37 |
John Wong | Empty | 39165-4 | LP-SIS | Done | Coating target oven /w TaC & sintering for TiC#3 | Wednesday, October 10, 2012, 16:35
Target container is coated with TaC.
No Ta-heat shields are used. |
|
|
52
|
Tuesday, October 16, 2012, 14:18 |
John Wong | TiC | 39165-4 | LP-SIS | Done | Sintering TiC#3 | Tuesday, October 16, 2012, 14:12
Target is filled with 360 discs of
TiC (with 1 mole of graphite) backed on C-grv |
|
|
53
|
Friday, January 11, 2013, 11:16 |
John Wong | | | | Maintenance | Replace terminal insulator | Friday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. |
|
|
54
|
Friday, January 11, 2013, 14:00 |
John Wong | Empty | Ta-Target boat | | Done | Testing QMS & thermocouples | Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with |
|
|
56
|
Tuesday, January 22, 2013, 16:14 |
John Wong | | | LP-SIS | Done | Heating RFQ components & measuring temperatures | Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year. |
|