Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 11 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  160   Thursday, October 02, 2014, 11:52 Laura LambertEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 Thursday, October 02, 2014, 11:51
Target container sprayed with TaC,
currently drying in fume hood
  
  162   Monday, October 06, 2014, 12:17 John WongEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  163   Wednesday, October 08, 2014, 11:51 Laura LambertEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  165   Thursday, October 09, 2014, 16:37 John WongEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  170   Monday, November 10, 2014, 13:55 Laura LambertEmpty LP-SISDoneSintering TaC coating container for UCx#11 [2nd container]Monday, November 10, 2014, 13:51
target container was sprayed with
TaC on friday and sintered over the weekend.
  
  176   Monday, February 02, 2015, 16:33 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert Monday, February 02, 2015, 16:28
Container is coated with TaC. 
No Ta foil wrapped around. 
  
  177   Tuesday, February 03, 2015, 10:31 Laura LambertEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  178   Thursday, February 05, 2015, 18:03 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  179   Tuesday, February 10, 2015, 13:19 Laura LambertEmpty41077-2LP-SISDoneCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
 empty_container_table.JPG 
  180   Tuesday, February 10, 2015, 14:01 Laura LambertEmpty41077-2LP-SISDoneConditioning graphite insert inside container - no heat shield Tuesday, February 10, 2015, 14:00
Container loaded into EVAP2 at noon.
no heat shields.
 graphite_insert_table.JPGgraphite_insert_no_hs_power_vs_temp.JPGgraphite_insert_no_hs_resistance.JPG 
  181   Wednesday, February 11, 2015, 16:12 Laura LambertEmpty41077-2LP-SISDoneConditioning graphite insert inside container - with heat shield Wednesday, February 11, 2015, 16:10
Container loaded into EVAP2.
3xTa heat shields.
 grp_with_HS_before_cooling.JPGgrp_insert_with_HS_table.JPGresistance.JPGtemp_vs_current.JPGtemp_vs_power.JPG 
  182   Thursday, February 19, 2015, 15:21 Laura LambertEmpty41177-2LP-SISDoneSintering TaC coating container for UCx#12 Thursday, February 19, 2015, 15:19
Target container coated with TaC,
loaded in EVAP2.
  
  193   Tuesday, May 19, 2015, 13:54 Laura LambertEmpty41177-1LP-SISDoneSintering TaC coating container for ZrC Tuesday, May 19, 2015, 13:33
Target container is coated with
  
  203   Friday, May 29, 2015, 11:29 Laura LambertZrC41177-1LP-SISIn progressConditioning ZrC#7 Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
  
  204   Monday, June 01, 2015, 18:09 John WongZrC41177-1LP-SISIn progressConditioning ZrC#7

    

       
            
  
  205   Tuesday, June 02, 2015, 13:05 John WongZrC41177-1LP-SISDoneConditioning ZrC#7

    

       
            
  
  206   Wednesday, June 03, 2015, 10:47 Laura LambertZrC41177-1LP-SISDoneConditioning ZrC#7

    

       
            
 Conditioning_target_-_no_heat_shields-no_endcaps.xlsx 
  210   Tuesday, June 09, 2015, 10:44 Laura LambertEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up Tuesday, June 09, 2015, 9:16
Target container is coated with TaC.
No Ta-heat shields are used.
  
  212   Wednesday, June 10, 2015, 16:35 John WongEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up

    

       
            
  
  213   Thursday, June 11, 2015, 16:10 Laura LambertEmpty41177-2LP-SISIn progressSintering TaC coating container for ZrC back-up

    

       
            
  
ELOG V2.9.2-2455