ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
|
160
|
Thursday, October 02, 2014, 11:52 |
Laura Lambert | Empty | 40282-5 | LP-SIS | In progress | Sintering TaC coating container for UCx#11 | Thursday, October 02, 2014, 11:51
Target container sprayed with TaC, currently drying in fume hood
Monday, October 06, 2014, 12:11
Target container & back block is wrapped with 3 layers of Ta-heat shield. The chamber has been pumped down over the weekend.
Pressure currently at 2.23e-7 Torr.
HS water valves open; no leaks detected.
TGHT will be ramped up to 580A at 0.2A/min
TBHT will be ramped up to 230A at 0.2A/min.
|
|
162
|
Monday, October 06, 2014, 12:17 |
John Wong | Empty | 40282-5 | LP-SIS | In progress | Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) |
Laura Lambert wrote: |
Thursday, October 02, 2014, 11:51
Target container sprayed with TaC, currently drying in fume hood
Monday, October 06, 2014, 12:11
Target container & back block is wrapped with 3 layers of Ta-heat shield. The chamber has been pumped down over the weekend.
Pressure currently at 2.23e-7 Torr.
HS water valves open; no leaks detected.
TGHT will be ramped up to 580A at 0.2A/min
TBHT will be ramped up to 230A at 0.2A/min.
|
Monday, October 06, 2014, 12:16
Stepped up both TGHT/TBHT to 35A.
Tuesday, October 07, 2014, 12:54
TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85
Pressure @ 5.2e-7 Torr.
Increase ramping rate to 2A/min.
Tuesday, October 07, 2014, 16:21
TGHT is now at 580A and TGHT at 230A.
Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)
The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.
Now... attempting to low TBHT to see any temperature change.
Tuesday, October 07, 2014, 17:01
TGHT @ 580A.
TBHT = 180C, Temp = 1925C
TBHT = 130C, Temp = 1920C
Not much of change in the temperature on the target tube...
Tuesday, October 07, 2014, 17:07
Attempting to increase the temperature to 2000C
TGHT = 600A, Temp = 1955C
TGHT = 620A, Temp = 2000C
Target will continue heating at this temperature overnight... Will continue to monitor.
Tuesday, October 07, 2014, 20:59
After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.
Pressure is coming down to 1.17e-6 Torr.
Increased TGHT to 630A to maintain temp @ 2000C
|
|
163
|
Wednesday, October 08, 2014, 11:51 |
Laura Lambert | Empty | 40282-5 | LP-SIS | Done | Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, October 02, 2014, 11:51
Target container sprayed with TaC, currently drying in fume hood
Monday, October 06, 2014, 12:11
Target container & back block is wrapped with 3 layers of Ta-heat shield. The chamber has been pumped down over the weekend.
Pressure currently at 2.23e-7 Torr.
HS water valves open; no leaks detected.
TGHT will be ramped up to 580A at 0.2A/min
TBHT will be ramped up to 230A at 0.2A/min.
|
Monday, October 06, 2014, 12:16
Stepped up both TGHT/TBHT to 35A.
Tuesday, October 07, 2014, 12:54
TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85
Pressure @ 5.2e-7 Torr.
Increase ramping rate to 2A/min.
Tuesday, October 07, 2014, 16:21
TGHT is now at 580A and TGHT at 230A.
Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)
The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.
Now... attempting to low TBHT to see any temperature change.
Tuesday, October 07, 2014, 17:01
TGHT @ 580A.
TBHT = 180C, Temp = 1925C
TBHT = 130C, Temp = 1920C
Not much of change in the temperature on the target tube...
Tuesday, October 07, 2014, 17:07
Attempting to increase the temperature to 2000C
TGHT = 600A, Temp = 1955C
TGHT = 620A, Temp = 2000C
Target will continue heating at this temperature overnight... Will continue to monitor.
Tuesday, October 07, 2014, 20:59
After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.
Pressure is coming down to 1.17e-6 Torr.
Increased TGHT to 630A to maintain temp @ 2000C
|
Wednesday, October 08, 2014, 11:46
Temperature readout from omega-IR2C = 2054C
TGHT = 11.14V, 628.0A
TBHT = 2.01V, 129.8A
IGP1 = 8.2e-7Torr
Initiating auto-cool for TGHT @ 2A/min, TBHT @ 1A/min
Thursday, October 09, 2014, 16:00
vented in air and opened up this morning
target container looks good!
|
|
165
|
Thursday, October 09, 2014, 16:37 |
John Wong | Empty | 40282-5 | LP-SIS | Done | Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, October 02, 2014, 11:51
Target container sprayed with TaC, currently drying in fume hood
Monday, October 06, 2014, 12:11
Target container & back block is wrapped with 3 layers of Ta-heat shield. The chamber has been pumped down over the weekend.
Pressure currently at 2.23e-7 Torr.
HS water valves open; no leaks detected.
TGHT will be ramped up to 580A at 0.2A/min
TBHT will be ramped up to 230A at 0.2A/min.
|
Monday, October 06, 2014, 12:16
Stepped up both TGHT/TBHT to 35A.
Tuesday, October 07, 2014, 12:54
TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85
Pressure @ 5.2e-7 Torr.
Increase ramping rate to 2A/min.
Tuesday, October 07, 2014, 16:21
TGHT is now at 580A and TGHT at 230A.
Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)
The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.
Now... attempting to low TBHT to see any temperature change.
Tuesday, October 07, 2014, 17:01
TGHT @ 580A.
TBHT = 180C, Temp = 1925C
TBHT = 130C, Temp = 1920C
Not much of change in the temperature on the target tube...
Tuesday, October 07, 2014, 17:07
Attempting to increase the temperature to 2000C
TGHT = 600A, Temp = 1955C
TGHT = 620A, Temp = 2000C
Target will continue heating at this temperature overnight... Will continue to monitor.
Tuesday, October 07, 2014, 20:59
After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.
Pressure is coming down to 1.17e-6 Torr.
Increased TGHT to 630A to maintain temp @ 2000C
|
Wednesday, October 08, 2014, 11:46
Temperature readout from omega-IR2C = 2054C
TGHT = 11.14V, 628.0A
TBHT = 2.01V, 129.8A
IGP1 = 8.2e-7Torr
Initiating auto-cool for TGHT @ 2A/min, TBHT @ 1A/min
Thursday, October 09, 2014, 16:00
vented in air and opened up this morning
target container looks good!
|
Thursday, October 09, 2014, 16:36
Photos for the OMEGA-IR2C temp measurement can be found on this link (see also the subfolder for the heating process):
https://www.dropbox.com/sh/n5sxcepg7e847xw/AACMubuKW1idd49D1Nz_0diNa?dl=0 |
|
170
|
Monday, November 10, 2014, 13:55 |
Laura Lambert | Empty | | LP-SIS | Done | Sintering TaC coating container for UCx#11 [2nd container] | Monday, November 10, 2014, 13:51
target container was sprayed with TaC on friday and sintered over the weekend.
vented and removed from evap2 this morning, looks good.
this container will be used as a round2 for UCx #11 since the last container broke as it was being assembled.
hopefully all the materials can be recovered and re-used/re-loaded into the new container...
|
|
176
|
Monday, February 02, 2015, 16:33 |
John Wong | Empty | 41077-2 | LP-SIS | In progress | Coating/Sintering TaC on target container - For Graphite Insert | Monday, February 02, 2015, 16:28
Container is coated with TaC. No Ta foil wrapped around.
Chamber is being pumped down.
TGHT/TBHT will be ramped up to 580A/230A at 0.2A/min.
|
|
177
|
Tuesday, February 03, 2015, 10:31 |
Laura Lambert | Empty | 41077-2 | LP-SIS | In progress | Coating/Sintering TaC on target container - For Graphite Insert |
John Wong wrote: |
Monday, February 02, 2015, 16:28
Container is coated with TaC. No Ta foil wrapped around.
Chamber is being pumped down.
TGHT/TBHT will be ramped up to 580A/230A at 0.2A/min.
|
Tuesday, February 03, 2015, 10:28
HS water valves opened; no leaks detected.
IGP1 = 5.9e-7 Torr
Wednesday, February 04, 2015, 11:10
attempted to initiate manual ramp up of TGHT and TBHT yesterday, but not responding to EPICS
currently sitting under vacuum, waiting on fix...
Wednesday, February 04, 2015, 14:16
controls fixed.
initiated auto-ramp.
Thursday, February 05, 2015, 08:56
IGP1 = 4.1e-7 Torr
TGHT = 290A
TBHT = 225A
Increasing auto-ramp to 1.0A/min
Thursday, February 05, 2015, 13:49
IGP1 = 1.4e-6 Torr
TGHT = 569A
TBHT = 232A
Increasing auto-ramp to 2.0A/min
|
|
178
|
Thursday, February 05, 2015, 18:03 |
John Wong | Empty | 41077-2 | LP-SIS | In progress | Coating/Sintering TaC on target container - For Graphite Insert |
Laura Lambert wrote: |
John Wong wrote: |
Monday, February 02, 2015, 16:28
Container is coated with TaC. No Ta foil wrapped around.
Chamber is being pumped down.
TGHT/TBHT will be ramped up to 580A/230A at 0.2A/min.
|
Tuesday, February 03, 2015, 10:28
HS water valves opened; no leaks detected.
IGP1 = 5.9e-7 Torr
Wednesday, February 04, 2015, 11:10
attempted to initiate manual ramp up of TGHT and TBHT yesterday, but not responding to EPICS
currently sitting under vacuum, waiting on fix...
Wednesday, February 04, 2015, 14:16
controls fixed.
initiated auto-ramp.
Thursday, February 05, 2015, 08:56
IGP1 = 4.1e-7 Torr
TGHT = 290A
TBHT = 225A
Increasing auto-ramp to 1.0A/min
Thursday, February 05, 2015, 13:49
IGP1 = 1.4e-6 Torr
TGHT = 569A
TBHT = 232A
Increasing auto-ramp to 2.0A/min
|
Thursday, February 05, 2015, 18:02
Auto-cooling TGHT to 400A at 1A/min. Need to take voltage reading tomorrow.
|
|
179
|
Tuesday, February 10, 2015, 13:19 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Coating/Sintering TaC on target container - For Graphite Insert |
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Monday, February 02, 2015, 16:28
Container is coated with TaC. No Ta foil wrapped around.
Chamber is being pumped down.
TGHT/TBHT will be ramped up to 580A/230A at 0.2A/min.
|
Tuesday, February 03, 2015, 10:28
HS water valves opened; no leaks detected.
IGP1 = 5.9e-7 Torr
Wednesday, February 04, 2015, 11:10
attempted to initiate manual ramp up of TGHT and TBHT yesterday, but not responding to EPICS
currently sitting under vacuum, waiting on fix...
Wednesday, February 04, 2015, 14:16
controls fixed.
initiated auto-ramp.
Thursday, February 05, 2015, 08:56
IGP1 = 4.1e-7 Torr
TGHT = 290A
TBHT = 225A
Increasing auto-ramp to 1.0A/min
Thursday, February 05, 2015, 13:49
IGP1 = 1.4e-6 Torr
TGHT = 569A
TBHT = 232A
Increasing auto-ramp to 2.0A/min
|
Thursday, February 05, 2015, 18:02
Auto-cooling TGHT to 400A at 1A/min. Need to take voltage reading tomorrow.
|
Tuesday, February 10, 2015, 09:35
Vented and opened this morning.
Container fully sintered.
|
Attachment 1: empty_container_table.JPG
|
|
|
180
|
Tuesday, February 10, 2015, 14:01 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Conditioning graphite insert inside container - no heat shield | Tuesday, February 10, 2015, 14:00
Container loaded into EVAP2 at noon.
no heat shields.
Chamber currently being pumped down.
TGHT/ TBHT will be ramped up to 580A/ 230A, tapped up manually.
Tuesday, February 10, 2015, 14:39
HS water valves opened, no leaks detected.
Tapping up manually / recording data in excel
Wednesday, February 11, 2015, 11:24
Reached max set points yesterday early evening.
Tapped down manually this a.m.
Will vent and open this afternoon.
Wednesday, February 11, 2015, 15:54
Took out this afternoon.
container looks good.
graphite insert removed/ inspected - not much change, slightly lighter in colour.
[see attachments for graphs/ table]
|
Attachment 1: graphite_insert_table.JPG
|
|
Attachment 2: graphite_insert_no_hs_power_vs_temp.JPG
|
|
Attachment 3: graphite_insert_no_hs_resistance.JPG
|
|
|
181
|
Wednesday, February 11, 2015, 16:12 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Conditioning graphite insert inside container - with heat shield | Wednesday, February 11, 2015, 16:10
Container loaded into EVAP2.
3xTa heat shields.
Chamber currently being pumped down.
TGHT/ TBHT will be ramped up to 580A/ 230A or 1800C tapped up manually.
Thursday, February 12, 2015, 09:39
HS water valves opened, no leaks detected.
Tapping up manually.
Thursday, February 12, 2015, 12:07
OMEGA reached 1805C; TGHT = 415A, TBHT = 205A
Will continue to tap up manually to 2000C
Thursday, February 12, 2015, 15:19
Reached TGHT = 500A, TBHT = 230A, OMEGA = 2035C.
Sat for ~2hrs.
Tapping up a further 25A on the TGHT.
Thursday, February 12, 2015, 16:05
Tapped up manually to:
OMEGA = 2250C
DV = 5.65V
TGHT = 580A
TBHT = 230A
Friday, February 13, 2015, 10:05
Reached max setpoint last night.
Voltage starting to increase at contant TGHT @ 580A. Lower TGHT to 525A, temp at 2150C (time 6:30pm)
Initiating manual cool down.
Friday, February 13, 2015, 15:31
vented and opened up this afternoon.
everything looked good, container not broken! graphite insert looked good! the container was slightly bent, but nothing of significance.
however, the graphite insert bonded to the container so it was not taken out in one piece... |
Attachment 1: grp_with_HS_before_cooling.JPG
|
|
Attachment 2: grp_insert_with_HS_table.JPG
|
|
Attachment 3: resistance.JPG
|
|
Attachment 4: temp_vs_current.JPG
|
|
Attachment 5: temp_vs_power.JPG
|
|
|
182
|
Thursday, February 19, 2015, 15:21 |
Laura Lambert | Empty | 41177-2 | LP-SIS | Done | Sintering TaC coating container for UCx#12 | Thursday, February 19, 2015, 15:19
Target container coated with TaC, loaded in EVAP2.
No Ta heat shields.
Will pump down over the weekend.
Monday, February 23, 2015, 10:22
IGP1 = 1.75e-7 Torr
TGHT will be ramped up to 580A at 0.2A/min
TBHT will be ramped up to 230A at 0.2A/min
evap2 power supply not responding to epics controls...waiting on fix
Wednesday, February 25, 2015, 16:05
controls now fixed.
danceioc1 involving evap ioc will be updated tomorrow by controls.
once ioc update complete will ramp up.
Friday, February 27, 2015, 09:34
ioc update complete yesterday afternoon.
IGP1 = 1.1e-7
initiating ramp up...
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Monday, March 02, 2015, 09:01
IGP1 = 2.5e-7 Torr
TGHT = 578A
TBHT = 232A
OMEGA = 1750C
Increasing to 1800C
Monday, March 02, 2015, 10:42
Reached 1800C at 10:30
TGHT = 603A
TBHT = 232A
IGP1 = 2.8e-7 Torr
Monday, March 02, 2015, 14:26
Sat at max set point for 4hrs.
IGP1 = 2.7e-7 Torr.
Initiating auto-cool, TGHT @ 2A/min, TBHT @ 1A/min.
Tuesday, March 03, 2015, 09:17
vented and opened this a.m.
target container looks good, TaC coating fully sintered.
|
|
193
|
Tuesday, May 19, 2015, 13:54 |
Laura Lambert | Empty | 41177-1 | LP-SIS | Done | Sintering TaC coating container for ZrC | Tuesday, May 19, 2015, 13:33
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 0.1A/min.
Chamber is currently being pumped down
Tuesday, May 19, 2015, 15:04
Opened up HS water, no leaks detected.
Stepped up to 35A.
Waited ~35min, vacuum stable.
IGP1 = 1.7e-6 Torr.
Initiating auto-ramp.
Wednesday, May 20, 2015, 11:43
IGP1 = 3e-7 Torr.
TGHT = 282A, 3.8V
TBHT = 156A, 2.2V
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Thursday, May 21, 2015, 10:42
IGP1 = 2.9e-7
Direct voltage = 5.48V
OMEGA = 1703C.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT.
Friday, May 22, 2015, 11:41
Vented in air and opened up this morning.
TaC coating fully sintered, looks good!
|
|
203
|
Friday, May 29, 2015, 11:29 |
Laura Lambert | ZrC | 41177-1 | LP-SIS | In progress | Conditioning ZrC#7 | Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
|
204
|
Monday, June 01, 2015, 18:09 |
John Wong | ZrC | 41177-1 | LP-SIS | In progress | Conditioning ZrC#7 |
Laura Lambert wrote: |
Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
Monday, June 01, 2015, 17:59
After almost an hour at 870A, the temperature went up from 1948C to 1980C; however temperature around the target container/legs are >2000C. The voltage on the power supply also went up slightly.
There is a film coated on the window port and that could affect the temp reading.
To be safe, I lowered the TGHT to 830A/17.38V, temp at 1930C.
Will keep at 830A for 4 hours and cool down this evening.
Recommend: Using Ta-heat shields for sintering next time.
Monday, June 01, 2015, 22:55
TGHT at 830A for almost 5 hours.
TEMP has gone up to 1994C. Voltage has also gone up to 19V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT.
|
|
205
|
Tuesday, June 02, 2015, 13:05 |
John Wong | ZrC | 41177-1 | LP-SIS | Done | Conditioning ZrC#7 |
John Wong wrote: |
Laura Lambert wrote: |
Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
Monday, June 01, 2015, 17:59
After almost an hour at 870A, the temperature went up from 1948C to 1980C; however temperature around the target container/legs are >2000C. The voltage on the power supply also went up slightly.
There is a film coated on the window port and that could affect the temp reading.
To be safe, I lowered the TGHT to 830A/17.38V, temp at 1930C.
Will keep at 830A for 4 hours and cool down this evening.
Recommend: Using Ta-heat shields for sintering next time.
Monday, June 01, 2015, 22:55
TGHT at 830A for almost 5 hours.
TEMP has gone up to 1994C. Voltage has also gone up to 19V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT.
|
Tuesday, June 02, 2015, 12:37
Chamber was vented and the target was inspected.
Some stressed marks on the target container can be observed.
The container is also slightly curved but otherwise it's fine.
The materials packed length has expended outward so 3 discs were removed in order to insert the end caps.
The packed length is now 16cm.
Two extra graphite foils were inserted on both ends, and previously coated/sintered TaC-end caps are inserted and expended.
Rn foil is inserted & Std solutions are added.
Ready for test-stand.
Link to photos for more details:
https://www.dropbox.com/sh/0cra7viqs9ro8q3/AADEGk8goGI4c-uzRQSGwWmxa?dl=0
|
|
206
|
Wednesday, June 03, 2015, 10:47 |
Laura Lambert | ZrC | 41177-1 | LP-SIS | Done | Conditioning ZrC#7 |
John Wong wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
Monday, June 01, 2015, 17:59
After almost an hour at 870A, the temperature went up from 1948C to 1980C; however temperature around the target container/legs are >2000C. The voltage on the power supply also went up slightly.
There is a film coated on the window port and that could affect the temp reading.
To be safe, I lowered the TGHT to 830A/17.38V, temp at 1930C.
Will keep at 830A for 4 hours and cool down this evening.
Recommend: Using Ta-heat shields for sintering next time.
Monday, June 01, 2015, 22:55
TGHT at 830A for almost 5 hours.
TEMP has gone up to 1994C. Voltage has also gone up to 19V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT.
|
Tuesday, June 02, 2015, 12:37
Chamber was vented and the target was inspected.
Some stressed marks on the target container can be observed.
The container is also slightly curved but otherwise it's fine.
The materials packed length has expended outward so 3 discs were removed in order to insert the end caps.
The packed length is now 16cm.
Two extra graphite foils were inserted on both ends, and previously coated/sintered TaC-end caps are inserted and expended.
Rn foil is inserted & Std solutions are added.
Ready for test-stand.
Link to photos for more details:
https://www.dropbox.com/sh/0cra7viqs9ro8q3/AADEGk8goGI4c-uzRQSGwWmxa?dl=0
|
see attachment for data recorded during ZrC conditioning |
Attachment 1: Conditioning_target_-_no_heat_shields-no_endcaps.xlsx
|
|
210
|
Tuesday, June 09, 2015, 10:44 |
Laura Lambert | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up | Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
|
212
|
Wednesday, June 10, 2015, 16:35 |
John Wong | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up |
Laura Lambert wrote: |
Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Wednesday, June 10, 2015, 16:32
TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.
Vac at 8.5e-7 Torr.
Cooling down initiated at 1A/min.
Target container should be inspected once the chamber is vented.
|
|
213
|
Thursday, June 11, 2015, 16:10 |
Laura Lambert | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up |
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, June 09, 2015, 9:16
Target container is coated with TaC. No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 01A/min.
Chamber is currently being pumped down.
Tuesday, June 09, 2015, 15:37
HS water valves were opened. no leaks detected.
Tapped up manually to 35A.
Once vacuum stabilized after ~45min, initiated auto-ramp.
Wednesday, June 10, 2015, 08:02
IGP1 = 5.3e-7 Torr.
TGHT = 250A and TBHT = 140A.
Increasing auto ramp to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Wednesday, June 10, 2015, 16:32
TGHT/TBHT are at 580A/230A for almost 6 hours, temp at 1728C.
Vac at 8.5e-7 Torr.
Cooling down initiated at 1A/min.
Target container should be inspected once the chamber is vented.
|
Thursday, June 11, 2015, 10:55
Vented in air and opened up this morning.
Same as last container sintered in evap2 [IG-LIS for UCx#13] - ends not quite fully sintered and coating not very good.
most likely due to old TaC spray.
See link for photos.
https://www.dropbox.com/sh/75o43x8y2z16e7j/AABc8Z1fTTaTRtJ5_Jr1eacWa?dl=0
|
|