Entry  Wednesday, October 19, 2016, 16:52, Laura Lambert, UC2, 41790-6, LP-SIS, Done, Conditioning UCx#18 
 Wednesday, October 19, 2016, 16:47
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block using one single
Entry  Thursday, February 16, 2017, 15:09, Laura Lambert, UC2, 42218-12, LP-SIS, Done, Conditioning UCx#19 IMG_1578.JPGIMG_1587.JPGIMG_1594.JPGIMG_1598.JPG
 Thursday, February 16, 2017, 15:04
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
Entry  Wednesday, July 12, 2017, 17:07, Laura Lambert, UC2, 42218-15, LP-SIS, In progress, Conditioning UCx#21 
 Wednesday, July 12, 2017, 17:06
Target container was previously coated with TaC and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
    Reply  Thursday, July 13, 2017, 14:50, Laura Lambert, UC2, 42218-15, LP-SIS, Problems, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, July 12, 2017, 17:06
    Reply  Wednesday, July 19, 2017, 14:15, Laura Lambert, UC2, 42218-15, LP-SIS, Problems resolved, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Wednesday, July 19, 2017, 14:17, Laura Lambert, UC2, 42218-15, LP-SIS, In progress, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Thursday, July 20, 2017, 15:00, Laura Lambert, UC2, 42218-15, LP-SIS, Problems, Conditioning UCx#21 Capture.JPGCapture3.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Thursday, July 20, 2017, 15:35, Laura Lambert, UC2, 42218-15, LP-SIS, Problems resolved, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Thursday, July 20, 2017, 15:57, Laura Lambert, UC2, 42218-15, LP-SIS, Done, Conditioning UCx#21 IMG_3249.JPGIMG_3251.JPGIMG_3257.JPGIMG_3258.JPGIMG_3260.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Tuesday, March 20, 2018, 14:52, Laura Lambert, UC2, 42218-13, LP-SIS, Done, Conditioning UCx#22 
 Tuesday, March 20, 2018, 14:43
Target container was previously coated with TaC and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
Entry  Friday, May 11, 2018, 12:36, Marla Cervantes, UC2, 41369-2, LP-SIS, Done, UCx Fully loaded graphite insert thermal test - FL#1 180511-FL1_520A.png
 Thursday, May 10, 2018, 16:00 
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Entry  Friday, August 03, 2018, 17:49, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#24 
Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs, total packing length of 7.1cm. 
Container was previously coated/sintered with TaC (see elog #415) in Evap#2 with TGHT set to 450A/7.5V and TBHT 230A/4.2
Entry  Thursday, October 11, 2018, 18:13, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#25 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm. 
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the
    Reply  Tuesday, October 23, 2018, 10:24, Marla Cervantes, UC2, , LP-SIS, Problems, Conditioning UCx#25 


    
        
            John Wong wrote:
        
        
            
            Thursday, October 11, 2018, 18:06
    Reply  Tuesday, October 23, 2018, 10:49, Marla Cervantes, UC2, , LP-SIS, Problems resolved, Conditioning UCx#25 


    
        
            Marla Cervantes wrote:
        
        
            
            
            
    Reply  Tuesday, October 23, 2018, 10:55, Marla Cervantes, UC2, , LP-SIS, Done, Conditioning UCx#25 OrangeCoat.jpgIonizerTube.jpgClosedSide.jpg


    
        
            Marla Cervantes wrote:
        
        
            
            
            
Entry  Tuesday, October 30, 2018, 10:17, Marla Cervantes, UC2, 43044-7 , LP-SIS, In progress, UCx Fully loaded graphite insert thermal test - FL#1 Heat_test.JPG
 Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2) 
The container was loaded with a graphite insert loaded with UCx
    Reply  Wednesday, October 31, 2018, 10:30, Marla Cervantes, UC2, 43044-7 , LP-SIS, Problems, UCx Fully loaded graphite insert thermal test - FL#1 current-trip_off.JPGepics.JPG


    
        
            Marla Cervantes wrote:
        
        
            
             Tuesday, October 30, 2018, 10:12
    Reply  Wednesday, October 31, 2018, 15:23, Marla Cervantes, UC2, 43044-7 , LP-SIS, Done, UCx Fully loaded graphite insert thermal test - FL#1 Ta-container.png


    
        
            Marla Cervantes wrote:
        
        
            
            
            
Entry  Wednesday, September 18, 2019, 09:57, Marla Cervantes, UC2, 44062-4, LP-SIS, Done, UCx28 Conditioning #1 
Wednesday, September 18, 2019, 07:48
A TaC coated target container  was loaded with a graphite cartridge with UCx
The target container has 3 heat shields