Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 6 of 15  Not logged in ELOG logo
ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  105   Thursday, December 11, 2014, 10:17 Laura Lambert   Maintenancewater supply shut off for lab closure over holidays Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays.
  
  106   Friday, January 23, 2015, 15:02 Laura Lambert   Maintenancewater supply turned back on to EVAP1 and fume hoods Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods
  
  107   Monday, January 26, 2015, 11:28 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_05 Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20,
2015. The slurry was cast on a piece of glass
 flk5.jpgstriptool.JPG 
  108   Monday, March 09, 2015, 16:58 Laura LambertEmpty TARGET BOATMaintenanceTesting new software Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program,
experienced some issues; therefore, switched
  
  109   Friday, March 20, 2015, 15:21 Laura LambertUC241177-2LP-SISDoneConditioning UCx #12Friday, March 20, 2015, 15:17 
Target container was previously
  
  110   Tuesday, April 21, 2015, 11:28 Laura Lambert   MaintenanceIon Gauge replaced March 23rd 2015    
  111   Monday, May 11, 2015, 11:49 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_06 Monday, May 11, 2015, 11:45
UO2/C green was prepared May
 IMG_20150508_143957199_HDR.jpgstriptool.JPGstriptool-zoom.JPG 
  112   Tuesday, June 30, 2015, 13:31 Laura LambertUC240860-1LP-IG-LISIn progressConditioning UCx #13 Tuesday, June 30, 2015, 13:28
Target container was previously
  
  114   Friday, July 03, 2015, 13:45 Laura LambertUC240860-1LP-IG-LISIn progressConditioning UCx #13

    

       
            
 evap1_trip_off_july_3rd.JPG 
  117   Tuesday, August 11, 2015, 10:23 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2_flk_07

    

       
            
  
  118   Wednesday, August 19, 2015, 11:44 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_08 Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug
 8x 
  122   Monday, October 26, 2015, 16:20 Laura LambertUC241077-5LP-SISDoneConditioning UCx#14

    

       
            
  
  123   Friday, December 04, 2015, 15:06 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round1 Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet
in the fume hood and let dry.
  
  124   Thursday, December 10, 2015, 10:59 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round2 Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C
discs cast onto graphite.
 image.jpeg 
  125   Thursday, February 18, 2016, 15:42 Laura LambertUC241077-1LP-SISIn progressConditioning UCx#15 Thursday, February 18, 2016, 15:34
Target container was previously
  
  127   Monday, February 29, 2016, 16:16 Laura LambertUC241077-1LP-SISDoneConditioning UCx#15

    

       
            
 UCx_15.jpg 
  128   Tuesday, March 08, 2016, 11:19 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_10 Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March
 UCxFlk_10.jpgUCxFlk_10(2).jpgUCxFlk_10(3).jpgUCxFlk_10-first_time_using_new_set_up.jpgUCxFlk_10_carbonization.jpg 
  129   Tuesday, April 05, 2016, 11:12 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_11Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March
 UCxFlk_11.jpg 
  130   Tuesday, April 19, 2016, 10:48 Laura LambertUC2*** Done***ALL FUTURE UCx TARGETS*** Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. 
  
  131   Monday, May 16, 2016, 15:52 Laura Lambert    Full clean of EVAP1 Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.

 
  
ELOG V2.9.2-2455