Entry  Wednesday, July 12, 2017, 17:07, Laura Lambert, UC2, 42218-15, LP-SIS, In progress, Conditioning UCx#21 
 Wednesday, July 12, 2017, 17:06
Target container was previously coated with TaC and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
    Reply  Thursday, July 13, 2017, 14:50, Laura Lambert, UC2, 42218-15, LP-SIS, Problems, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, July 12, 2017, 17:06
    Reply  Wednesday, July 19, 2017, 14:15, Laura Lambert, UC2, 42218-15, LP-SIS, Problems resolved, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Wednesday, July 19, 2017, 14:17, Laura Lambert, UC2, 42218-15, LP-SIS, In progress, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Thursday, July 20, 2017, 15:00, Laura Lambert, UC2, 42218-15, LP-SIS, Problems, Conditioning UCx#21 Capture.JPGCapture3.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Thursday, July 20, 2017, 15:35, Laura Lambert, UC2, 42218-15, LP-SIS, Problems resolved, Conditioning UCx#21 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Thursday, July 20, 2017, 15:57, Laura Lambert, UC2, 42218-15, LP-SIS, Done, Conditioning UCx#21 IMG_3249.JPGIMG_3251.JPGIMG_3257.JPGIMG_3258.JPGIMG_3260.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Tuesday, March 20, 2018, 14:52, Laura Lambert, UC2, 42218-13, LP-SIS, Done, Conditioning UCx#22 
 Tuesday, March 20, 2018, 14:43
Target container was previously coated with TaC and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
Entry  Thursday, February 16, 2017, 15:09, Laura Lambert, UC2, 42218-12, LP-SIS, Done, Conditioning UCx#19 IMG_1578.JPGIMG_1587.JPGIMG_1594.JPGIMG_1598.JPG
 Thursday, February 16, 2017, 15:04
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
Entry  Thursday, April 20, 2017, 11:41, Laura Lambert, UC2, 42218-1, LP-IG-LIS, Done, Conditioning UCx#20 6x
 Thursday, April 20, 2017, 11:31
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
Entry  Wednesday, October 19, 2016, 16:52, Laura Lambert, UC2, 41790-6, LP-SIS, Done, Conditioning UCx#18 
 Wednesday, October 19, 2016, 16:47
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block using one single
Entry  Monday, July 11, 2016, 16:00, Laura Lambert, UC2, 41790-3, LP-SIS, Done, Conditioning UCx#17 trip-off.JPGsnapshot_of_striptool.JPG
Monday, July 11, 2016, 15:54
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping
Entry  Friday, May 11, 2018, 12:36, Marla Cervantes, UC2, 41369-2, LP-SIS, Done, UCx Fully loaded graphite insert thermal test - FL#1 180511-FL1_520A.png
 Thursday, May 10, 2018, 16:00 
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Entry  Tuesday, September 04, 2018, 10:18, Marla Cervantes, UC2, 41369-2, , In progress, UCx Fully loaded graphite insert thermal test - FL#1.2 180904-UCxFL1-T2-2.png
 Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
    Reply  Friday, September 21, 2018, 10:22, Anders Mjos, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2 


    
        
            Marla Cervantes wrote:
        
        
            
             Monday, September 03, 2018, 10:17
    Reply  Saturday, September 29, 2018, 20:53, John Wong, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2 


    
        
            Marla Cervantes wrote:
        
        
            
             Monday, September 03, 2018, 10:17
Entry  Friday, March 20, 2015, 15:21, Laura Lambert, UC2, 41177-2, LP-SIS, Done, Conditioning UCx #12 
Friday, March 20, 2015, 15:17 
Target container was previously coated with TaC spray and sintered.
It's is wrapped with 3 layers of Ta-heat shield, including the center block.
Entry  Thursday, October 15, 2015, 16:05, John Wong, UC2, 41077-5, LP-SIS, In progress, Conditioning UCx#14 
Thursday, October 15, 2015, 15:52
Target container previously sintered with TaC in Evap#2 - Target current at 440A, temp measured at 1900C.  A few tests on the temp measured
were done (see Evap#2 elog #251 & 252).  
    Reply  Monday, October 26, 2015, 16:20, Laura Lambert, UC2, 41077-5, LP-SIS, Done, Conditioning UCx#14 


    
        
            John Wong wrote:
        
        
            
            Thursday, October 15, 2015, 15:52
Entry  Thursday, February 18, 2016, 15:42, Laura Lambert, UC2, 41077-1, LP-SIS, In progress, Conditioning UCx#15 
 Thursday, February 18, 2016, 15:34
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - same method