|
ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
225
|
Tuesday, October 23, 2018, 10:55 |
Marla Cervantes | UC2 | | LP-SIS | Done | Conditioning UCx#25 |
|
|
|
226
|
Wednesday, October 24, 2018, 20:01 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 |
|
|
|
227
|
Thursday, October 25, 2018, 09:10 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Done | Processing UC2Flk_22 |
|
|
|
228
|
Tuesday, October 30, 2018, 10:17 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | In progress | UCx Fully loaded graphite insert thermal test - FL#1 | Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) |
|
|
229
|
Wednesday, October 31, 2018, 10:30 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Problems | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
|
230
|
Wednesday, October 31, 2018, 15:23 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
|
231
|
Thursday, November 22, 2018, 17:32 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Problems | UCx Fully loaded graphite insert - UCx26 | Thursday, November 22, 2018, 17:25
D-shaped discs were cut from |
|
|
232
|
Monday, November 26, 2018, 17:06 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Done | UCx Fully loaded graphite insert - UCx26 |
|
|
|
235
|
Wednesday, March 27, 2019, 08:56 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test 4 | Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days |
|
|
236
|
Friday, April 05, 2019, 10:08 |
Marla Cervantes | | 43630-3 | | Done | TaC coating/sintering for graphite insert test | Friday, April 05, 2019, 10:04
A tantalum tube was coated |
|
|
237
|
Wednesday, April 10, 2019, 13:38 |
Marla Cervantes | | 43630-3 | | Done | Graphite insert test #6 | Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to
a graphite insert (see picture caps) |
|
|
238
|
Friday, May 24, 2019, 15:25 |
Marla Cervantes | | 43943-1 | | Done | Graphite insert test - FOILS | Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded
with graphite foils was transferred to EVAP1 |
|
|
239
|
Monday, June 17, 2019, 08:58 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#27 Carbothermal reduction | Friday, June 14, 2019, 17:10
A 14 mm die was used to cut |
|
|
240
|
Tuesday, July 30, 2019, 10:27 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#28 Carbothermal reduction | Friday,
June 26, 2019, 17:10
|
|
|
241
|
Wednesday, September 18, 2019, 09:57 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #1 | Wednesday, September 18, 2019, 07:48
A TaC coated target container
was loaded with a graphite cartridge with |
|
|
242
|
Tuesday, September 24, 2019, 06:53 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #2 | Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously |
|
|
243
|
Wednesday, September 25, 2019, 14:00 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #3 | Wednesday, September 25, 2019, 14:00
The target UCx28 that |
|
|
244
|
Friday, September 27, 2019, 18:04 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #4 | Friday, September 27, 2019, 18:03
The target UCx28 that |
|
|
245
|
Wednesday, October 02, 2019, 11:07 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #5 | Monday, September 30, 2019, 10:54
After being exposed to air for 1.5
hours, |
|
|
246
|
Wednesday, October 02, 2019, 11:10 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#29 Carbothermal reduction | Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields |
|
|