ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
246
|
Wednesday, October 02, 2019, 11:10 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#29 Carbothermal reduction | Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields |
|
|
240
|
Tuesday, July 30, 2019, 10:27 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#28 Carbothermal reduction | Friday,
June 26, 2019, 17:10
|
|
|
239
|
Monday, June 17, 2019, 08:58 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#27 Carbothermal reduction | Friday, June 14, 2019, 17:10
A 14 mm die was used to cut |
|
|
26
|
Wednesday, July 27, 2011, 13:02 |
John Wong | UC2 | 38634-3 | LP-SIS | Problems | UCx#2 conditioning | Wednesday, July 27, 2011, 12:58:
Target length = 11.2cm
Total UC2/C foils = 245 discs |
|
|
273
|
Wednesday, July 07, 2021, 12:40 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx Provisional ID= 200229 conditioning | Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 |
|
|
217
|
Tuesday, September 04, 2018, 10:18 |
Marla Cervantes | UC2 | 41369-2 | | In progress | UCx Fully loaded graphite insert thermal test - FL#1.2 | Monday, September 03, 2018, 10:17
Graphite insert fully loaded |
|
|
218
|
Friday, September 21, 2018, 10:22 |
Anders Mjos | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
|
220
|
Saturday, September 29, 2018, 20:53 |
John Wong | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
|
204
|
Friday, May 11, 2018, 12:36 |
Marla Cervantes | UC2 | 41369-2 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 | Thursday, May 10, 2018, 16:00
Graphite insert fully loaded |
|
|
228
|
Tuesday, October 30, 2018, 10:17 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | In progress | UCx Fully loaded graphite insert thermal test - FL#1 | Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) |
|
|
229
|
Wednesday, October 31, 2018, 10:30 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Problems | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
|
230
|
Wednesday, October 31, 2018, 15:23 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 |
|
|
|
231
|
Thursday, November 22, 2018, 17:32 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Problems | UCx Fully loaded graphite insert - UCx26 | Thursday, November 22, 2018, 17:25
D-shaped discs were cut from |
|
|
232
|
Monday, November 26, 2018, 17:06 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Done | UCx Fully loaded graphite insert - UCx26 |
|
|
|
216
|
Friday, August 17, 2018, 11:23 |
Marla Cervantes | UC2 | NA | | Done | UCx 1-step casting -Oxidation test | Friday, August 17, 2018, 11:17
Four discs of UCx produced with the
1-step casting method were placed in a glass |
|
|
49
|
Wednesday, June 06, 2012, 16:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UC2 flakes for UCx#4: batch#01-04062012 | Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June
04, 2012. |
7x |
|
50
|
Monday, June 11, 2012, 10:48 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
|
|
|
51
|
Tuesday, June 12, 2012, 11:38 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
|
|
|
53
|
Sunday, June 24, 2012, 22:52 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: IOC problems |
|
|
|
54
|
Monday, June 25, 2012, 16:00 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: Fiber converters failed |
|
|