Entry  Wednesday, October 02, 2019, 11:10, Marla Cervantes, UO2/C, , TARGET BOAT, Done, UCx#29 Carbothermal reduction CarbothermalReduction-UCx29.JPG
 Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with UO2/C foils, wrapped with three Ta heat shields was placed in the EVAP1.
The EVAP1 is currently pumping down.
Entry  Tuesday, July 30, 2019, 10:27, Marla Cervantes, UO2/C, , TARGET BOAT, Done, UCx#28 Carbothermal reduction UCx28.JPG
Friday, June 26, 2019, 17:10
A 13 mm die was used to cut out discs from strips
The target consists of 264 discs of 10 cm in length - all single discs, no packs.
Entry  Monday, June 17, 2019, 08:58, Marla Cervantes, UO2/C, , TARGET BOAT, Done, UCx#27 Carbothermal reduction 
Friday, June 14, 2019, 17:10
A 14 mm die was used to cut out discs from strips
The target consists of 236 discs of 10 cm in length - all single discs, no packs.
Entry  Wednesday, July 27, 2011, 13:02, John Wong, UC2, 38634-3, LP-SIS, Problems, UCx#2 conditioning  striptool_july31.pngTarget_with_3_heat_shields.jpgstriptool_july31_600A.jpgUCx#2-conditioning.jpg
Wednesday, July 27, 2011, 12:58: 
Target length = 11.2cm
Total UC2/C foils = 245 discs
Entry  Wednesday, July 07, 2021, 12:40, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx Provisional ID= 200229 conditioning 
 Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 was installed in the EVAP1 and pumped down (Tuesday July 7, 2021).
Target is going to be thermally reduced for 8 hours and then conditioned for an additional 8
Entry  Tuesday, September 04, 2018, 10:18, Marla Cervantes, UC2, 41369-2, , In progress, UCx Fully loaded graphite insert thermal test - FL#1.2 180904-UCxFL1-T2-2.png
 Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
    Reply  Friday, September 21, 2018, 10:22, Anders Mjos, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2 


    
        
            Marla Cervantes wrote:
        
        
            
             Monday, September 03, 2018, 10:17
    Reply  Saturday, September 29, 2018, 20:53, John Wong, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2 


    
        
            Marla Cervantes wrote:
        
        
            
             Monday, September 03, 2018, 10:17
Entry  Friday, May 11, 2018, 12:36, Marla Cervantes, UC2, 41369-2, LP-SIS, Done, UCx Fully loaded graphite insert thermal test - FL#1 180511-FL1_520A.png
 Thursday, May 10, 2018, 16:00 
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Entry  Tuesday, October 30, 2018, 10:17, Marla Cervantes, UC2, 43044-7 , LP-SIS, In progress, UCx Fully loaded graphite insert thermal test - FL#1 Heat_test.JPG
 Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2) 
The container was loaded with a graphite insert loaded with UCx
    Reply  Wednesday, October 31, 2018, 10:30, Marla Cervantes, UC2, 43044-7 , LP-SIS, Problems, UCx Fully loaded graphite insert thermal test - FL#1 current-trip_off.JPGepics.JPG


    
        
            Marla Cervantes wrote:
        
        
            
             Tuesday, October 30, 2018, 10:12
    Reply  Wednesday, October 31, 2018, 15:23, Marla Cervantes, UC2, 43044-7 , LP-SIS, Done, UCx Fully loaded graphite insert thermal test - FL#1 Ta-container.png


    
        
            Marla Cervantes wrote:
        
        
            
            
            
Entry  Thursday, November 22, 2018, 17:32, Marla Cervantes, UO2/C, 40202-1, TARGET BOAT, Problems, UCx Fully loaded graphite insert - UCx26 Nov23-CurrenTrip1.jpgNov23-CurrenTrip2.jpg
 Thursday, November 22, 2018, 17:25
D-shaped discs were cut from cast #26
A 13mm punch was used to punch out discs from pre-cut strips
    Reply  Monday, November 26, 2018, 17:06, Marla Cervantes, UO2/C, 40202-1, TARGET BOAT, Done, UCx Fully loaded graphite insert - UCx26 CR-UCx26.png


    
        
            Marla Cervantes wrote:
        
        
            
             Thursday, November 22, 2018, 17:25
Entry  Friday, August 17, 2018, 11:23, Marla Cervantes, UC2, NA, , Done, UCx 1-step casting -Oxidation test 
 Friday, August 17, 2018, 11:17
Four discs of UCx produced with the 1-step casting method were placed in a glass jar.
The mass of the discs was 0.400 g.
Entry  Wednesday, June 06, 2012, 16:58, John Wong, UO2/C, UCx-heatboat#2, , Done, UC2 flakes for UCx#4: batch#01-04062012 7x
Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June 04, 2012. 
UO2 powder used = 50.26g
    Reply  Monday, June 11, 2012, 10:48, John Wong, UO2/C, UCx-heatboat#2, , Problems, UC2 flakes - batch#01-04062012: broken seal & TGHT power supply 


    
        
            John Wong wrote:
        
        
            
            Wednesday, June 06, 2012, 16:55
    Reply  Tuesday, June 12, 2012, 11:38, John Wong, UO2/C, UCx-heatboat#2, , Problems resolved, UC2 flakes - batch#01-04062012: broken seal & TGHT power supply 


    
        
            John Wong wrote:
        
        
            
            
            
              
    Reply  Sunday, June 24, 2012, 22:52, John Wong, UO2/C, UCx-heatboat#2, , Problems, UC2 flakes - batch#01-04062012: IOC problems IOC_problem.png


    
        
            John Wong wrote:
        
        
            
            Wednesday, June 06, 2012, 16:55
    Reply  Monday, June 25, 2012, 16:00, John Wong, UO2/C, UCx-heatboat#2, , Problems resolved, UC2 flakes - batch#01-04062012: Fiber converters failed 


    
        
            John Wong wrote:
        
        
            
            
            
ELOG V2.9.2-2455