275
|
Thursday, September 23, 2021, 07:03 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#35 C reduction | Thursday, September 23, 2021, 06:55
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Wednesday September 22)
IGP1 = 3.6 e-5 Torr
Good vacuum = 5e-2 Torr
Bad vacuum = 5e-1 Torr
Current ramp is 2A per min from 0A to 120A and 1A/10s from 120A to (450-550A)
Thursday, September 23, 2021, 07:09
IGP1 = 1.84 e-06 Torr
Start Autoramp to 120A @ 2A/min
Thursday, September 23, 2021, 10:25
Start Autoramp to 550A @ 1A/10s
IGP1= 1.05e-05 Torr
TGHT= 120 A, 1.06 V
Thursday, September 23, 2021, 11:57
Pressure drop observed at 530A. Start 4 hour count.
Thursday, September 23, 2021, 15:57
IGP1= 9.1e-06 Torr
After 4 hour reduction started rampdown to 400A at 2A/30s.
8 hour conditioning to start at 16:15 pm
Friday, September 24, 2021, 00:16
TGHT= 399.8 A, 3.5V
IGP1= 2.4 e-06 Torr
Start ramp down at 2A/min
|
274
|
Wednesday, September 15, 2021, 07:19 |
Marla Cervantes | UC2 | | TARGET BOAT | Done | Conditioning 2sc samples | Wednesday, September 14, 2021, 21:14
Boat is wrapped with 2 layers of Ta-heat shield
The samples consists of 15 discs of UCx of 14mm diameter
The chamber is currently pumping down.
TGHT will be ramped up to 450 A
Wednesday, September 15, 2021, 07:17
IGP1 = 6.75e-6 Torr
Tapped up manually to 40A.
TGHT = 60 A, 2.39 V
Vacuum stable IG1 = 7.25e-6 Torr
Initiating auto-ramp for TGHT at a rate of 0.2A/min to 445 A
Parameter setup: 5.0e-5 good vac, 8.0e-5 bad vac.
Wednesday, September 15, 2021, 11:57
IGP1=2.24e-5 Torr
TGHT= 102.016 A, 1.275 V
Autoramp changed to 1A/min to 450 A
Wednesday, September 15, 2021, 12:53
IGP1 = 3.3e-5 torr
TGHT= 150 A, V
Autoramp changed to 2A/30s to 450 A
1e-1 good vac, 5e-1 bad vac
Wednesday, September 15, 2021, 12:59
Friday, September 17, 2021, 07:54
IGP1 = 3.81e-6 Torr
TGHT = 449.6 A, 4.31 V
Autoramp set to -2A/min to 0 A |
273
|
Wednesday, July 07, 2021, 12:40 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx Provisional ID= 200229 conditioning | Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 was installed in the EVAP1 and pumped down (Tuesday July 7, 2021).
Target is going to be thermally reduced for 8 hours and then conditioned for an additional 8 hours
IGP1 = 2.0 e-6 Torr
Good vacuum = 1e-1 Torr
Bad vacuum = 5e-1 Torr
Power desired 1.6kW.
10 extra discs included for analysis
Wednesday, July 07, 2021, 14:49
Ramping up TGHT at 6A/min [wait interval = 10 s at increments of 1A]
Wednesday, July 07, 2021, 15:58
IGP1= 5.7 e-5 Torr and trending down. Will start ramp up to 450A at 18A/min [wait interval 10s at 3A increments]
Wednesday, July 07, 2021, 16:20
IGP1= 2.2e-3 Torr
Will continue ramping TGHT to 500A and watch pressure
Wednesday, July 07, 2021, 16:26
Continue ramping to 550 at 3A/10s
Wednesday, July 07, 2021, 16:29
holding at 550A, 5.1V for 8 hours
Wednesday, July 07, 2021, 23:41
TGHT = 550A, 5.7 V
begin ramp down at -2A/min to 450A and leave for 8 hours
Thursday, July 08, 2021, 08:20
IGP1= 2.7 e-06 Torr
TGHT = 450A, 4.5V
Will start ramp down at -2A/min to 0A
|
272
|
Wednesday, June 30, 2021, 13:35 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 conditioning | Target #34 was installed in the EVAP1 and pumped down (Tuesday June 29, 2021).
Target #34 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.
IGP1 = 1.85e-6 Torr
Good vacuum = 1e-1 Torr
Bad vacuum = 5e-1 Torr
Power desired 1.6kW. This is the second target conditioned this way.
Subsequent targets should be conditioned following thermal reduction.
Thursday, July 01, 2021, 06:05
IGP1= 1.35e-06 Torr
Start autoramp @2A/30s to 400A
Thursday, July 01, 2021, 07:59
Pressure increase was observed near 400A
will ramp to 450A and keep for 8 hours
IGP1= 1.4 e-05 Torr
450A and 4.0V reached at 8:14 am on Thursday July 01, 2021
Rampdown @-2A/min was started at 4.14 pm on Thursday July 01, 2021 IGP1 stable at 2.7e-06Torr
Cannot transfer into glovebox yet because moisture is a bit high after regeneration. Moisture is dropping. Will wait until moisture is sufficiently low.
Monday, July 05, 2021, 20:43
Cartridge was removed and placed in bag inside glovebox
Removed 10 discs for analysis but might place them back inside depending on final decision. We had previously removed 10 discs after thermal reduction.
|
271
|
Saturday, June 05, 2021, 09:14 |
Marla Cervantes | UC2 | | TARGET BOAT | In progress | UCx#33 Conditioning | Saturday, June 05, 2021, 08:57
Target #33 was installed in the EVAP1 and pumped down yesterday (Friday 4).
Target #33 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.
IGP1 = 3.85e-6 Torr
Good vacuum = 1e-1 Torr
Bad vacuum = 5e-1 Torr
Power desired 1.6kW. This is the first target conditioned this way,
Saturday, June 05, 2021, 09:13
Current ramp is 2A/30s to 400 A
Saturday, June 05, 2021, 10:59
TGHT = 3.5V, 399.7 A, 1.4 kW
IGP1 = 4.4e-5 Torr
Saturday, June 05, 2021, 11:00
Current ramp is 2A/30s to 450 A
Saturday, June 05, 2021, 11:14
TGHT = 4.06 V, 451.584 A, 1.4 kW
IGP1 = 4.86e-5 Torr
Saturday, June 05, 2021, 11:15
Current ramp is 2A/30s to 500 A
Saturday, June 05, 2021, 11:23
TGHT = 4.23 V, 467.2 A, 1.97 kW pressure was still increasing a little at 1.6kW
IGP1 = 4.86e-5 Torr
Saturday, June 05, 2021, 19:10
TGHT = 4.08 V, 459.52 A,
IGP1 = 6.4e-6 Torr
Initiate ramp down at 2 A/min to 0A |
270
|
Thursday, April 15, 2021, 15:01 |
Marla Cervantes | | | | | IGP1 patch | Thursday, March 31, 2021, 14:42
EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the TGHT's power supply were monitored discarding the possibility of tripping due to the overheating of these pieces of equipment.
Gelo has been monitoring the IGP1 during carbothermal reductions to pinpoint the tripping issue, below is Gelo description to the issue and the patch he implemented to fix it.
"IGP loses its STATON (On status) if the value from the device is not within the valid voltage window (0.7 to 10 V). IEVAP:IGP1 for some reason goes to 0V for a few seconds then goes back up to where it left off.
Prior to the latest software updated, I added a 2 second delay in the code so that any invalid signal <=2s will be ignored.
Here is the data that you sent me specifically looking at when it tripped. I also attached the data that you sent me. << File: 310321-P2N-3-CR (1).txt >>
Time
|
IEVAP:TGHT:RDVOL [V]
|
IEVAP:TGHT:RDCUR [A]
|
IEVAP:IGP1:RDVAC [T]
|
03/31/2021 12:00:25
|
3.07
|
740.9
|
0.01866428
|
03/31/2021 12:00:26
|
3.07
|
741.1
|
0.01838651
|
03/31/2021 12:00:27
|
3.07
|
740.7
|
0.01838651
|
03/31/2021 12:00:28
|
3.07
|
740.8
|
0.01797758
|
03/31/2021 12:00:29
|
3.08
|
740.9
|
0.0178433
|
03/31/2021 12:00:30
|
3.08
|
740.6
|
0.0178433
|
03/31/2021 12:00:31
|
3.08
|
740.8
|
0
|
03/31/2021 12:00:32
|
3.08
|
741.1
|
0
|
03/31/2021 12:00:33
|
0.14
|
42.2
|
0.01680456
|
03/31/2021 12:00:34
|
0
|
3.3
|
0.01513015
|
03/31/2021 12:00:35
|
0
|
3.4
|
0.01071685
|
03/31/2021 12:00:36
|
0
|
3.2
|
0.00788081
|
03/31/2021 12:00:37
|
0
|
3.2
|
0.00673278
|
03/31/2021 12:00:38
|
0
|
2.6
|
0.00445774
|
TGHT Voltage and TGHT current are both read from the same PLC module, which tells me that the PLC module is not likely the issue since we were still reading other signals when IGP was reading 0.
For the new update, I adjusted the delay to 5 seconds since the signal drop seemed like it was about 2s and was enough to lose the IGP STATON bit which tripped TGHT.
The delay only applies for the STATON status which can also be described as reading OK status in this case. Any other trip will be instantaneous and work as normal.
STATON is “ANDed” with other trips. i.e. IEVAPIGP_LESS10MTORR = IEVAPIGP1_RDVAC < 10mTorr AND IEVAPIGP1_STATON."
|
269
|
Tuesday, March 30, 2021, 16:04 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-3 carbothermal reduction | Green target material characteristics (elog 105)
#discs = 49
Average disc thickness = 0.453mm
Empty cartridge weight = 9.42 g
Full cartridge weight = 39.86 g
UO2+C weight = 30.44 g
Tuesday, March 30, 2021, 16:04
The target material was loaded in a P2N oven, wrapped with three heat shields, and set in the EVAP1
EVAP1 is currently being evacuated.
Wednesday, March 31, 2021, 09:42
IGP1 = 3.24e-6 Torr
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Autoramp set to 1A/10s to 150 A.
Wednesday, March 31, 2021, 10:17
TGHT = .54 V, 149.88 A
IGP1 = 6.3e-4 Torr and increasing
Max pressure = 0.06 Torr
Wednesday, March 31, 2021, 10:33
IGP1= 0.004 Torr
Autoramp set to 1A/10s to 200 A
Wednesday, March 31, 2021, 10:43
Maximum pressure 0.03 Torr and going down
Autoramp set to 1A/10s to 250 A
Wednesday, March 31, 2021, 11:04
TGHT = 1.1 V, 299.9 A
IGP1 = 6e-4 Torr and going down
Autoramp set to 2.5 A/10 s to 700 A
Wednesday, March 31, 2021, 11:35
Ramp stopped at 690 A
TGHT = 2.9V, 689.1A
IGP1 = 0.127 Torr
Wednesday, March 31, 2021, 11:37
Autoramp set to 700 A at 1A/20s
Manually ramped to 740 A (3V) to make sure carbothermal reduction is done.
Wednesday, March 31, 2021, 12:00
The power supply tripped, Gelo was monitoring the heating process.
Wednesday, March 31, 2021, 14:33
The target will be heated for 4 hours to get read of impurities.
IGP1 = 6e-6 Torr
Autoramp set to 650 at 1A/10s
Wednesday, March 31, 2021, 20:37
TGHT = 2.77 V, 669.6A
IGP1 = 8.5e-6 Torr
EVAP1 ramped down to 0 A at 2 A/min |
268
|
Thursday, September 10, 2020, 14:07 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 Conditioning | Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced but at the maximum current, the power supply tripped (elog. 267)
Therefore, the target was not hot long enough to fully outgas, that is why it will be reheated.
Desired current 650 A
Thursday, September 10, 2020, 14:07
IGP1 = 3.3e-6 Torr
Autoramp set to 650 A at 1 A/10 s
Thursday, September 10, 2020, 16:06
Ramp reached desired current
TGHT = 2.4 V, 649 A
IGP1 = 3e-3 Torr
Friday, September 11, 2020, 11:17
TGHT = 2.24 V, 649.2 A
IGP1 = 3.7e-6 Torr
Friday, September 11, 2020, 12:55
TGHT = 2.2 V, 648.8 A
IGP1 = 3.7e-6 Torr
Autoramp set to 700 A at 1 A/10 s,
No more gas was released, the system was ramped down to 0 A at 2 A/min
Friday, September 11, 2020, 18:17
TGHT = 0.35 V, 133 A
IGP1 = 2.7e-6 Torr
Friday, September 11, 2020, 20:01
TGHT = 0 V, 2.56 A
IGP1 = 2.6e-6 Torr
Monday, September 14, 2020, 16:19
EVAP1 was vented with Ar and the P2N material was transferred to the preparatory glove box. |
267
|
Tuesday, September 08, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 carbothermal reduction | Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields, loaded with a graphite container filled with UO2/C ring-discs was set in the EVAP1
EVAP1 is currently being evacuated.
Wednesday, September 09, 2020, 10:11
IGP1 = 4.7e-6 Torr
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Autoramp set to 1A/10s to 150 A.
Wednesday, September 09, 2020, 10:50
TGHT = .32 V, 149.8 A
IGP1 = 6.5e-5 Torr
Autoramp set to 1A/10s to 200 A
Wednesday, September 09, 2020, 11:00
TGHT =0.46 V, 200 A
IGP1 = 6e-4 Torr and going up
good vacuum = 5e-2 Torr
bad vacuum = 1e-2 Torr
autoramp set to 1A/10s to 250 A
autoramp stopped at 215 A, since pressure kept increasing, the current was manually decreased to 180 A.
Wednesday, September 09, 2020, 11:16
TGHT = 0.4 V, 179.7 A,
IGP1 = 8.5e-4 Torr an going down
good vacuum = 5e-2 Torr
bad vacuum = 1e-2 Torr
autoramp set to 1A/30s to 200 A
Wednesday, September 09, 2020, 11:32
TGHT = 0.46 V, 200.2 A,
IGP1 = 3e-3 Torr an going down
good vacuum = 5e-2 Torr
bad vacuum = 1e-2 Torr
autoramp set to 1A/30s to 300 A
Wednesday, September 09, 2020, 11:38
IGP1 = 1e-3 Torr
Since the pressure was decreasing, the ramp was stopped at 210 and changed to 1A/10s to 300 A, vacuum limits remained the same
Wednesday, September 09, 2020, 11:53
The pressure reached the bad vacuum limit 1e-2 Torr and stopped
After ~8min the pressure limits were changed to:
good vacuum = 5e-2 Torr
bad vacuum = 1e-1 Torr
Wednesday, September 09, 2020, 12:05
IGP1 = 1.15e-3 Torr
Autoramp set to 2.5 A/10 s to 700 A
Wednesday, September 09, 2020, 12:36
Pressure increased! and ramp paused at 685 A
re-started autoramp to 700 A at 1A/10s
Wednesday, September 09, 2020, 13:56
Pressure kept increasing after 700 A, so autoramp was set to 750 A at 1A/10s
Pressure kept increasing
At 750 A pressure started reducing, autoramp was set to 760 A at 1A/10 s
System tripped suddenly (Gelo was notified)
The carbothermal reduction seemed complete |
266
|
Wednesday, August 19, 2020, 07:49 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N carbothermal reduction (#2) | Wednesday, August 19, 2020, 07:47
XRD analysis of the P2N material showed that the carbothermal reduction was not completed
The material was loaded again in its oven, new Ta caps where secured to the edges, the body remained the same
The oven was set in the EVAP1 using Ar to avoid oxidation of the P2N material
See elog 263
Wednesday, August 19, 2020, 07:47
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 4.11e-6 Torr
Autoramp set to 1A/10s to 150 A.
Wednesday, August 19, 2020, 10:00
TGHT = .45 V, 149.8 A
IGP1 = 9.1e-5 Torr
Autoramp set to 1A/10s to 200 A.
Wednesday, August 19, 2020, 10:13
TGHT = 0.6 V, 200.2 A
IGP1 = 3e-4 Torr and increasing
After 6 min:
good vacuum = 5e-2 Torr
bad vacuum = 1e-1 Torr
autoramp set to 1A/30s to 250 A
Since the pressure was decreasing, the ramp was changed to 1A/10s to 250 A, vacuum limits remained the same
Wednesday, August 19, 2020, 10:28
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 1.7e-4 Torr
TGHT = 0.78 V, 250.1 A
Autoramp set to 2.5 A/10 s to 700 A
Wednesday, August 19, 2020, 11:17
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 2e-4 Torr
TGHT = 2.64 V, 699 A
Autoramp set to 2 A/10 s to 800 A
Wednesday, August 19, 2020, 11:29
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 5.2e-5 Torr
TGHT = 3.1 V, 798.8 A
Note: Voltage starts to become unstable, an power is around 2.3 kW, pressure has not increased enough to indicate reduction with certainty
In order to reach 3 kW autoramp set to 1A/10 s to 900 A
Wednesday, August 19, 2020, 12:18
The current was increased to 1000 A expecting to see a high peak in pressure but there was not an increase in preasure.
The target is being ramped down to 850 A |
265
|
Tuesday, August 18, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Problems resolved | P2N target material carbothermal reduction |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A
|
Thursday, January 30, 2020, 10:15
At 155 A while pressure decreasing, the power supply tripped off,
Controls has been notified, waiting for instructions.
|
Thursday, January 30, 2020, 11:51
Controls respond "It looks like the power supplies were tripped by either the pirani gauge (IEVAP:IGP1) or the Nuclear vent or by both. But, it did not look like that the interlock tree latched the bad condition when the power supplies tripped. I modified the PLC to properly latch the cause of the trip." and gave green light to restart the carbothermal reduction.
|
Thursday, January 30, 2020, 13:09
IGP1=5.9e-6Torr
Ramp set to 1A/10s to 200 A
Pressure rising too fast at 200 A, current reduced manually to 190 A
Pressure start dropping and system tripped, notify to controls again, "The strip tool shows the vacuum level shoot down to 0 then shoot back up for a quick second but that is enough to tell the PLC that IGP is “bad”"
Thursday, January 30, 2020, 15:58
Restarting process to try to trip the system on purpose
Initial pressure IGP1 = 2.7e-6Torr
Ramp set to 1/A/10s to 200 A, 0.59 V
Ramp set to 2A/10s to 300 A
Max pressure during process IGP1 = 0.03 Torr
Voltage increased and stabilized (see voltage rising).
Ramp kept at 2A/10s to 400 A
Thursday, January 30, 2020, 16:48
TGHT = 1.54 V, 399.744 A
IGP1 = 0.00016 Torr and going down
Ramp set to 2A/10s to 500 A
Thursday, January 30, 2020, 17:02
TGHT= 1.9V, 499.2 A
IGP1 = 0.00014 Torr
Ramp set to 2A/10s to 600 A
Ramp set to 0.5 A/min to 700 A, ramp stopped at 680 A
Manually tapped to 697 A
Pressure dropping indicated that carbothermal reduction is done.
Unfortunately, the system did not trip.
Contact Gelo for the next run, such that he can monitor the system and we can spot the problem.
|
Friday, January 31, 2020, 15:35
The EVP1 was vent with Ar and the P2N target was transferred to the glove box.
|
Thursday, August 13, 2020, 14:33
XRD analysis of the P2N material showed that the carbothermal reduction was not completed
The material was loaded again in its oven, new Ta caps where secured to the edges, the body remained the same
The oven was set in the EVAP1 using Ar to avoid oxidation of the P2N material
Currently pumping down.
Saturday, August 15, 2020, 14:45
Vacuum is having a strange behavior, pressure shows that is going from 8e-11 to 4e-6 Torr (fig. 200815-Vaccum_P2N)
Proceeded to turn off turbo pump
Tuesday, August 18, 2020, 10:38
The IGP1 head was replaced with the EVAP1's IGP1 head
The vacuum will be started again
|
Tuesday, August 18, 2020, 20:44
The pressure reading are normal after swapping the IGP1's gauge head |
264
|
Tuesday, August 18, 2020, 12:40 |
Aaron Schmidt | | | | | IEVAP:IGP1 swap out | INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one.
Had been roughing.
Tuesday, August 18, 2020, 12:37: Turbo pump on.
Tuesday, August 18, 2020, 12:54: Vacuum @ 1.28e-05T & dropping. |
263
|
Thursday, August 13, 2020, 14:37 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A
|
Thursday, January 30, 2020, 10:15
At 155 A while pressure decreasing, the power supply tripped off,
Controls has been notified, waiting for instructions.
|
Thursday, January 30, 2020, 11:51
Controls respond "It looks like the power supplies were tripped by either the pirani gauge (IEVAP:IGP1) or the Nuclear vent or by both. But, it did not look like that the interlock tree latched the bad condition when the power supplies tripped. I modified the PLC to properly latch the cause of the trip." and gave green light to restart the carbothermal reduction.
|
Thursday, January 30, 2020, 13:09
IGP1=5.9e-6Torr
Ramp set to 1A/10s to 200 A
Pressure rising too fast at 200 A, current reduced manually to 190 A
Pressure start dropping and system tripped, notify to controls again, "The strip tool shows the vacuum level shoot down to 0 then shoot back up for a quick second but that is enough to tell the PLC that IGP is “bad”"
Thursday, January 30, 2020, 15:58
Restarting process to try to trip the system on purpose
Initial pressure IGP1 = 2.7e-6Torr
Ramp set to 1/A/10s to 200 A, 0.59 V
Ramp set to 2A/10s to 300 A
Max pressure during process IGP1 = 0.03 Torr
Voltage increased and stabilized (see voltage rising).
Ramp kept at 2A/10s to 400 A
Thursday, January 30, 2020, 16:48
TGHT = 1.54 V, 399.744 A
IGP1 = 0.00016 Torr and going down
Ramp set to 2A/10s to 500 A
Thursday, January 30, 2020, 17:02
TGHT= 1.9V, 499.2 A
IGP1 = 0.00014 Torr
Ramp set to 2A/10s to 600 A
Ramp set to 0.5 A/min to 700 A, ramp stopped at 680 A
Manually tapped to 697 A
Pressure dropping indicated that carbothermal reduction is done.
Unfortunately, the system did not trip.
Contact Gelo for the next run, such that he can monitor the system and we can spot the problem.
|
Friday, January 31, 2020, 15:35
The EVP1 was vent with Ar and the P2N target was transferred to the glove box.
|
Thursday, August 13, 2020, 14:33
XRD analysis of the P2N material showed that the carbothermal reduction was not completed
The material was loaded again in its oven, new Ta caps where secured to the edges, the body remained the same
The oven was set in the EVAP1 using Ar to avoid oxidation of the P2N material
Currently pumping down.
Saturday, August 15, 2020, 14:45
Vacuum is having a strange behavior, pressure shows that is going from 8e-11 to 4e-6 Torr (fig. 200815-Vaccum_P2N)
Proceeded to turn off turbo pump
Tuesday, August 18, 2020, 10:38
The IGP1 head was replaced with the EVAP1's IGP1 head
The vacuum will be started again |
262
|
Wednesday, June 03, 2020, 08:10 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 Carbothermal Reduction | Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday May 29, 2020)
The set up was installed in the EVAP1 then IEVAP:IGP1 was replaced (elogs 260 and 261).
Vacuum was turned on after Ion Gauge swap.
IGP1 = 3.6 e-5 Torr
Good vacuum = 5e-2 Torr
Bad vacuum = 5e-1 Torr
Current ramp is 1A per 10s from 0A to 120A
Wednesday, June 03, 2020, 09:59
After about 20 minutes at 120 A, TGHT tripped again exactly as before.
Will restart ramp at 1A per 10s from 0A to 120A . Will set good vacuum to 1e-2 Torr
IGP1= 4.3e-05 Torr
Wednesday, June 03, 2020, 10:57
IGP1 = 9e-4 Torr
Pressure peaked around 4e-3 Torr and now trending down
TGHT =120 A
Wednesday, June 03, 2020, 11:23
IGP1=9.5e-5 Torr
Good Vacuum 1e-02 Torr
Bad Vacuum 5e-1 Torr
Starting TGHT ramp to 550 A at 3A per 10s
Wednesday, June 03, 2020, 14:41
ramp up was good. TGHT at 550 A since 12:30 pm. TGHT did not trip. *note adjusted good vacuum. Ramping takes a little longer but doesn't trigger TGHT shutdown.
Wednesday, June 03, 2020, 22:55
IGP1 = 3.5e-5 Torr
TGHT = 249.4 A, 5.7 V
Start ramp down at -2A per minute to 0 A
|
261
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Monday, June 01, 2020, 09:37: Swap complete.
|
260
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips. |
259
|
Tuesday, May 26, 2020, 20:44 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#33 Carbothermal Reduction | Tuesday, May 26, 2019, 18:20
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday May 22, 2020)
The set up was installed in the EVAP1 and pumped down during the weekend.
IGP1 = 7.10 e-7 Torr
Good vacuum = 1e-1 Torr
Bad vacuum = 5e-1 Torr
Current ramp is 1A per 10s from 0A to 120A
Tuesday, May 26, 2020, 19:15
Heater (TGHT) tripped after being at 120A about approximately 10 min.
The pressure was below 500 mTorr when the trip occured (around 20 mTorr) . Pressure did not appear to have gone past 200 mTorr but was dropping fast at the time of trip.
Will try again tomorrow after consulting with Gelo.
Wednesday, May 27, 2020, 10:26
Trying again while monitoring Power Supply reading ( Darwin Remotely and Marla onsite)
IGP1 = 7.7 e-7 Torr
Good vacuum = 1e-1 Torr
Bad vacuum = 5e-1 Torr
Current ramp is 1A per 10s from 0A to 120A
Wednesday, May 27, 2020, 10:49
Reached 120A on TGHT
TGHT= 0.92V
IGP1 = 3.6 e-06 Torr and rising
Wednesday, May 27, 2020, 12:46
TGHT = 120.2 A, 0.98V
IGP1 = 6.85e-6 Torr
Starting ramp at 3A per 10s up to 550 A or up to pressure drop start
Wednesday, May 27, 2020, 14:21
Heater tripped again at around 0.14 Torr and approx 440 A
Will start again hoping pressure stable enough to not trip heater.
Wednesday, May 27, 2020, 14:22
IGP1= 1.05e-6 Torr
Ramping to 120 A at 1 A per 10 s
Wednesday, May 27, 2020, 15:12
Starting ramp on TGHT at 3A per 10s up to 550A or pressure dip.
Wednesday, May 27, 2020, 15:35
Changed vacuum settings (paused ramp and restarted)
Good vacuum 1e-2
bad vacuum 5e-1
Wednesday, May 27, 2020, 16:30
TGHT = 549.4 A, 5.35V
IGP1= 2.1e-5 Torr
Reached 550 at approx 4 pm
Thursday, May 28, 2020, 00:31
IGP1= 3.31e-6Torr
TGHT = 549.3 A, 5.45V
Initiate ramp down at 2 A/min to 0A
Reduced cartridge was dismounted Friday, May 29, 2020 and transferred to Glove box.
|
258
|
Friday, January 31, 2020, 15:36 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N target material carbothermal reduction |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A
|
Thursday, January 30, 2020, 10:15
At 155 A while pressure decreasing, the power supply tripped off,
Controls has been notified, waiting for instructions.
|
Thursday, January 30, 2020, 11:51
Controls respond "It looks like the power supplies were tripped by either the pirani gauge (IEVAP:IGP1) or the Nuclear vent or by both. But, it did not look like that the interlock tree latched the bad condition when the power supplies tripped. I modified the PLC to properly latch the cause of the trip." and gave green light to restart the carbothermal reduction.
|
Thursday, January 30, 2020, 13:09
IGP1=5.9e-6Torr
Ramp set to 1A/10s to 200 A
Pressure rising too fast at 200 A, current reduced manually to 190 A
Pressure start dropping and system tripped, notify to controls again, "The strip tool shows the vacuum level shoot down to 0 then shoot back up for a quick second but that is enough to tell the PLC that IGP is “bad”"
Thursday, January 30, 2020, 15:58
Restarting process to try to trip the system on purpose
Initial pressure IGP1 = 2.7e-6Torr
Ramp set to 1/A/10s to 200 A, 0.59 V
Ramp set to 2A/10s to 300 A
Max pressure during process IGP1 = 0.03 Torr
Voltage increased and stabilized (see voltage rising).
Ramp kept at 2A/10s to 400 A
Thursday, January 30, 2020, 16:48
TGHT = 1.54 V, 399.744 A
IGP1 = 0.00016 Torr and going down
Ramp set to 2A/10s to 500 A
Thursday, January 30, 2020, 17:02
TGHT= 1.9V, 499.2 A
IGP1 = 0.00014 Torr
Ramp set to 2A/10s to 600 A
Ramp set to 0.5 A/min to 700 A, ramp stopped at 680 A
Manually tapped to 697 A
Pressure dropping indicated that carbothermal reduction is done.
Unfortunately, the system did not trip.
Contact Gelo for the next run, such that he can monitor the system and we can spot the problem.
|
Friday, January 31, 2020, 15:35
The EVP1 was vent with Ar and the P2N target was transferred to the glove box. |
257
|
Thursday, January 30, 2020, 13:11 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A
|
Thursday, January 30, 2020, 10:15
At 155 A while pressure decreasing, the power supply tripped off,
Controls has been notified, waiting for instructions.
|
Thursday, January 30, 2020, 11:51
Controls respond "It looks like the power supplies were tripped by either the pirani gauge (IEVAP:IGP1) or the Nuclear vent or by both. But, it did not look like that the interlock tree latched the bad condition when the power supplies tripped. I modified the PLC to properly latch the cause of the trip." and gave green light to restart the carbothermal reduction.
|
Thursday, January 30, 2020, 13:09
IGP1=5.9e-6Torr
Ramp set to 1A/10s to 200 A
Pressure rising too fast at 200 A, current reduced manually to 190 A
Pressure start dropping and system tripped, notify to controls again, "The strip tool shows the vacuum level shoot down to 0 then shoot back up for a quick second but that is enough to tell the PLC that IGP is “bad”"
Thursday, January 30, 2020, 15:58
Restarting process to try to trip the system on purpose
Initial pressure IGP1 = 2.7e-6Torr
Ramp set to 1/A/10s to 200 A, 0.59 V
Ramp set to 2A/10s to 300 A
Max pressure during process IGP1 = 0.03 Torr
Voltage increased and stabilized (see voltage rising).
Ramp kept at 2A/10s to 400 A
Thursday, January 30, 2020, 16:48
TGHT = 1.54 V, 399.744 A
IGP1 = 0.00016 Torr and going down
Ramp set to 2A/10s to 500 A
Thursday, January 30, 2020, 17:02
TGHT= 1.9V, 499.2 A
IGP1 = 0.00014 Torr
Ramp set to 2A/10s to 600 A
Ramp set to 0.5 A/min to 700 A, ramp stopped at 680 A
Manually tapped to 697 A
Pressure dropping indicated that carbothermal reduction is done.
Unfortunately, the system did not trip.
Contact Gelo for the next run, such that he can monitor the system and we can spot the problem. |
256
|
Thursday, January 30, 2020, 11:53 |
Marla Cervantes | UO2/C | P2N-02 | | Problems resolved | P2N target material carbothermal reduction |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A
|
Thursday, January 30, 2020, 10:15
At 155 A while pressure decreasing, the power supply tripped off,
Controls has been notified, waiting for instructions.
|
Thursday, January 30, 2020, 11:51
Controls respond "It looks like the power supplies were tripped by either the pirani gauge (IEVAP:IGP1) or the Nuclear vent or by both. But, it did not look like that the interlock tree latched the bad condition when the power supplies tripped. I modified the PLC to properly latch the cause of the trip." and gave green light to restart the carbothermal reduction. |
|