173
|
Tuesday, November 14, 2017, 16:16 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UC2 discs for 1stepUCx in graphite sample container _#2 | Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used, |
|
|
164
|
Wednesday, August 23, 2017, 15:54 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UC2 discs for 1stepUCx in graphite sample container _#1 | Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast |
|
|
288
|
Thursday, January 19, 2023, 10:02 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | C230105 Reduction | Thursday, January 19, 2023, 09:57
Cartridge #8 loaded with 198 discs
To be reduced inside a Ta container |
|
|
286
|
Monday, November 28, 2022, 05:59 |
Darwin Ortiz Rosales | UO2/C | | LP-SIS | Done | C221125experiment | Monday, November 28, 2022, 05:58
Left weekend to pump down
current IGPI= 7.23e-7 Torr |
|
|
287
|
Monday, December 19, 2022, 10:45 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | C-221207 Reduction | Monday, December 19, 2022, 10:38
Cartridge with 175 discs (including
5 analysis discs) loaded into a graphite |
|
|
284
|
Friday, October 07, 2022, 08:14 |
Darwin Ortiz Rosales | UO2/C | | LP-SIS | Done | C-220928UCx conditioning experiments | Friday, October 07, 2022, 07:55
Cartridge-220928UCx was installed |
|
|
285
|
Wednesday, October 19, 2022, 12:28 |
Darwin Ortiz Rosales | UC2 | 40253-5 | LP TUBE | Done | C-220510 further conditioning | Wednesday, October 19, 2022, 10:27
Cartridge-220510Cx was installed |
|
|
24
|
Thursday, June 30, 2011, 12:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#2: UO2/C for carbonization | Before began the
carbonization process, two cameras were setup |
|
|
23
|
Wednesday, May 25, 2011, 14:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#1: UO2/C mixing & carbonization | Before began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply. |
|
|
289
|
Wednesday, March 22, 2023, 22:29 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | 230316 Reduction | Wednesday, March 22, 2023, 22:29
Cartridge #9 loaded with 213 plus
3 analysi discs |
|
|
124
|
Thursday, December 10, 2015, 10:59 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | 1stepUCx project - round2 | Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C
discs cast onto graphite. |
|
|
123
|
Friday, December 04, 2015, 15:06 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | 1stepUCx project - round1 | Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet
in the fume hood and let dry. |
|
|
156
|
Thursday, July 13, 2017, 12:49 |
Laura Lambert | | | | Problems | *hot lab is HOT* | Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! |
|
|
163
|
Thursday, July 27, 2017, 09:08 |
Laura Lambert | | | | Problems resolved | *hot lab is HOT* |
|
|
|
130
|
Tuesday, April 19, 2016, 10:48 |
Laura Lambert | UC2 | *** | | Done | ***ALL FUTURE UCx TARGETS*** | Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. |
|
|
20
|
Wednesday, May 11, 2011, 16:23 |
John Wong | SiC | 38481-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 11 16:20:21 2011: The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs). The target is wrapped with |