Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 15 of 15  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  173   Tuesday, November 14, 2017, 16:16 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#2 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used,
 striptool.JPG 
  164   Wednesday, August 23, 2017, 15:54 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#1 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast
 IMG_1768.JPGIMG_1774.JPG 
  288   Thursday, January 19, 2023, 10:02 Darwin Ortiz RosalesUO2/C LP TUBEDoneC230105 ReductionThursday, January 19, 2023, 09:57
Cartridge #8 loaded with 198 discs
To be reduced inside a Ta container
  
  286   Monday, November 28, 2022, 05:59 Darwin Ortiz RosalesUO2/C LP-SISDoneC221125experimentMonday, November 28, 2022, 05:58
Left weekend to pump down
current IGPI= 7.23e-7 Torr
 Data_summary.png 
  287   Monday, December 19, 2022, 10:45 Darwin Ortiz RosalesUO2/C LP TUBEDoneC-221207 ReductionMonday, December 19, 2022, 10:38
Cartridge with 175 discs (including
5 analysis discs) loaded into a graphite
  
  284   Friday, October 07, 2022, 08:14 Darwin Ortiz RosalesUO2/C LP-SISDoneC-220928UCx conditioning experimentsFriday, October 07, 2022, 07:55
Cartridge-220928UCx was installed
 Cap_1_221011.pngCap_2.pngcap3.png 
  285   Wednesday, October 19, 2022, 12:28 Darwin Ortiz RosalesUC240253-5LP TUBEDoneC-220510 further conditioningWednesday, October 19, 2022, 10:27
Cartridge-220510Cx was installed
  
  24   Thursday, June 30, 2011, 12:42 John WongUO2/CUCx-heatboat#1LP-SISDoneBatch#2: UO2/C for carbonizationBefore began the
carbonization process, two cameras were setup
 startup_vac.jpgstartup_current.jpgparameter.jpgUCx_2011_b_3days.pnggrab.S13888.png 
  23   Wednesday, May 25, 2011, 14:42 John WongUO2/CUCx-heatboat#1LP-SISDoneBatch#1: UO2/C mixing & carbonizationBefore began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply.
 Screen_shot_2011-05-26_at_3.14.00_PM.pngauto_ramping.pngUCx_2011_A_carbonization.pngEvaporator_Ar_flow.pngUC2.png 
  289   Wednesday, March 22, 2023, 22:29 Darwin Ortiz RosalesUO2/C LP TUBEDone230316 ReductionWednesday, March 22, 2023, 22:29
Cartridge #9 loaded with 213 plus
3 analysi discs
  
  124   Thursday, December 10, 2015, 10:59 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round2 Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C
discs cast onto graphite.
 image.jpeg 
  123   Friday, December 04, 2015, 15:06 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round1 Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet
in the fume hood and let dry.
  
  156   Thursday, July 13, 2017, 12:49 Laura Lambert   Problems*hot lab is HOT*Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! 
 Capture.JPG 
  163   Thursday, July 27, 2017, 09:08 Laura Lambert   Problems resolved*hot lab is HOT*

    

       
            
  
  130   Tuesday, April 19, 2016, 10:48 Laura LambertUC2*** Done***ALL FUTURE UCx TARGETS*** Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. 
  
  20   Wednesday, May 11, 2011, 16:23 John WongSiC38481-8HP-FEBIADProblems Organics burnoff & Sintering Wed May 11 16:20:21 2011:  The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs).  The target is wrapped with
 9x 
ELOG V2.9.2-2455