Entry  Tuesday, November 07, 2017, 12:04, Laura Lambert, , , , Maintenance, Noise levels checked - ear protection not required. 
 Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor by Terry.
Max readings in lab reached ~83dB but sat between 70-78dB in most areas.
Entry  Wednesday, November 22, 2017, 14:20, Laura Lambert, , , , Maintenance, New eye wash for hot lab! 
 Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple attachment on sink spout.
Easy to use, simply twist attachment 180 degrees.
Entry  Tuesday, June 26, 2018, 12:12, Aaron Schmidt, , , , Problems resolved, Gloves replaced. 
 Tuesday, June 26, 2018, 09:30. Gloves on evap 1 changed out. 
The original right one was otrn. Left was o but worn. Both replaced with new gloves.
Entry  Thursday, March 21, 2019, 09:03, Aaron Schmidt, , , , In progress, Evap 1 pump down issue 
On Tuesday it was noted that evaporator 1 was not pumping down properly. It was vented and the seal & seal face wiped with a cloth. The initial pump
down rate was faster, however after 48 hrs, it has still not pumped down to appropriate levels. 
Thursday, March 21, 2019, 08:59: IV1 closed & TP1 off. 
Entry  Tuesday, March 26, 2019, 08:58, Aaron Schmidt, , , , Maintenance, Roughing pump oiled. 
Oiled as per work permit:  I2019-03-26-2.
Tuesday, March 26, 2019, 08:53: Start RP1
Entry  Wednesday, March 27, 2019, 08:56, Marla Cervantes, , 43630-6, , Done, Graphite insert test 4 
 Wednesday, March 27, 2019, 08:50
A graphite insert was set into a tantalum tube in the evaporator 2 for 3 days
The objective of the test was to determine the current and voltage required to reach 2000 C
Entry  Friday, April 05, 2019, 10:08, Marla Cervantes, , 43630-3, , Done, TaC coating/sintering for graphite insert test EVAP1-TaC_Coating.JPG
 Friday, April 05, 2019, 10:04
A tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).
Entry  Wednesday, April 10, 2019, 13:38, Marla Cervantes, , 43630-3 , , Done, Graphite insert test #6 caps.jpgCurren-voltage-plot.JPG
 Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to a graphite insert (see picture caps)
 The insert was set in a tantalum tube previously coated and wrapped with 3 Ta sheets.
Entry  Friday, May 24, 2019, 15:25, Marla Cervantes, , 43943-1, , Done, Graphite insert test - FOILS 
 Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded with graphite foils was transferred to EVAP1
https://elog.triumf.ca/TIS/Evaporator_2/445
Entry  Tuesday, November 05, 2019, 14:50, Aaron Schmidt, , , , Maintenance, Fallen Bolt. 
 One of the TBHT bolts  fell out of reach and may be sitting
on the isolation valve or TP.
Remove TP as per WP:  
Entry  Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out 
 Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Monday, June 01, 2020, 09:37: Swap complete. 
Entry  Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out 
 Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Entry  Tuesday, August 18, 2020, 12:40, Aaron Schmidt, , , , , IEVAP:IGP1 swap out 
 INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one.
Entry  Thursday, April 15, 2021, 15:01, Marla Cervantes, , , , , IGP1 patch 
Thursday, March 31, 2021, 14:42 
 
EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the