Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 13 of 15  Not logged in ELOG logo
  ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  85   Thursday, January 23, 2014, 16:29 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coatingThursday, January 23, 2014, 16:26 
 A new target boat was sprayed
with TaC coating and let dry, the coating
 IMG_20140123_143448877.jpgIMG_20140123_143507747.jpg 
  86   Friday, January 24, 2014, 14:45 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  87   Monday, January 27, 2014, 11:03 Laura LambertEmpty40282-1TARGET BOATDoneSintering Ta target boat with TaC coating

    

       
            
 IMG_20140128_113257662.jpg 
  108   Monday, March 09, 2015, 16:58 Laura LambertEmpty TARGET BOATMaintenanceTesting new software Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program,
experienced some issues; therefore, switched
  
  167   Thursday, September 21, 2017, 11:35 Laura LambertEmpty  DoneTesting TBHT [1st run!], RP [new oil] and IG [new gauge] Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied.
  
  172   Tuesday, November 07, 2017, 14:38 Laura LambertEmpty LP-FEBIADDoneTBHT test with LP-FEBIAD Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for
 evap1_data.xlsx 
  194   Wednesday, February 28, 2018, 15:21 Laura LambertEmpty TARGET BOATDoneTesting TGHT to induce trip Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1
have tripped off the TGHT in epics within
  
  252   Wednesday, January 22, 2020, 18:10 Marla CervantesEmptyP2N-02  DoneP2N test#1The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The
 6x 
  253   Wednesday, January 29, 2020, 10:11 Marla CervantesEmptyP2N-02 DoneP2N test#2The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The
 P2N-test2_final_voltage.JPGP2N-test2.JPG 
  62   Thursday, October 25, 2012, 15:03 John WongBeOTa-target boat (old) In progressSintering BeO pellets #5 - testing Re foil as the protective under layerThursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets
1 to 4 were done in Evaporator#2.
 BeO_pellets_on_Re_foil.PNGTGHT_0-400A.PNGBeO_pellet#5_TGHT_100-600A.PNGBeO_pellet#5_@_600A__11hrs.PNG 
  1   Wednesday, March 23, 2011, 18:23 John Wong    Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)March 23, 2011
12:30: Target oven is wrapped with
3 Ta-heat shields.  Pumping down evaporator
 grab.K18246.pnggrab.g20718.pnggrab.r27097.pnggrab.t30095.png 
  2   Friday, March 25, 2011, 17:22 John Wong    Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)

    
        
  
  3   Monday, March 28, 2011, 11:20    HP-FEBIADDoneDiffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
  
  5   Tuesday, March 29, 2011, 10:20     ProblemsLoss of cooling waterAccording to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about
  
  6   Tuesday, March 29, 2011, 10:30     DoneLoss of cooling water updateIt's the NON-ACTIVE water that will go
off.  The evaporator is on sity water,
so it will be OK.
  
  21   Tuesday, May 17, 2011, 16:43 John Wong   MaintenanceEvaporator Ion gauge replaced The evaporator ion gauge filament burnt
out on May 11, 2011.  A target was in
the evaporator at that time and was about
  
  48   Monday, May 14, 2012, 15:22 John Wong Target boat  Testing the new graphite foil from CeramaterialMonday, May 14, 2012, 15:04
Due to the differences in the use
of the graphite foils in past SiC targets
 parameter.JPGTGHT_0-820A.GIFgraphite_test_target_boat.pdfGraphite_Foil-Certifcate_of_Compliance-Triumf_Order-1-16-12.pdf 
  52   Tuesday, June 12, 2012, 14:43 John Wong   MaintenanceChanging backing pump oil Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). 
  
  82   Friday, November 01, 2013, 13:08 Anders Mjos   MaintenanceGloves, window and window gasket replaced.Work covered under work permit 2013-11-01-3
and performed by Anders and Rick with the
help of Danno (RPG).
  
  83   Monday, December 02, 2013, 16:09 Anders Mjos   Problems resolvedTGHT connector repositioned and tightenedThe right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance
 Evap1_rotated_TGHT_conductor_2013-12-02.pdf 