ID Datedown Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  55   Tuesday, July 10, 2012, 12:54 John WongUC238634-9LP-SISDoneUCx#4 final conditioning completedTuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). 
 TGHT_0-175_orgburnoff.GIFUCx#4_final_conditioning_0-520A.PNG 
  54   Monday, June 25, 2012, 16:00 John WongUO2/CUCx-heatboat#2 Problems resolvedUC2 flakes - batch#01-04062012: Fiber converters failed

    

       
            
  
  53   Sunday, June 24, 2012, 22:52 John WongUO2/CUCx-heatboat#2 ProblemsUC2 flakes - batch#01-04062012: IOC problems

    

       
            
 IOC_problem.png 
  52   Tuesday, June 12, 2012, 14:43 John Wong   MaintenanceChanging backing pump oil Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). 
  
  51   Tuesday, June 12, 2012, 11:38 John WongUO2/CUCx-heatboat#2 Problems resolvedUC2 flakes - batch#01-04062012: broken seal & TGHT power supply

    

       
            
  
  50   Monday, June 11, 2012, 10:48 John WongUO2/CUCx-heatboat#2 ProblemsUC2 flakes - batch#01-04062012: broken seal & TGHT power supply

    

       
            
  
  49   Wednesday, June 06, 2012, 16:58 John WongUO2/CUCx-heatboat#2 DoneUC2 flakes for UCx#4: batch#01-04062012Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June
04, 2012. 
 7x 
  48   Monday, May 14, 2012, 15:22 John Wong Target boat  Testing the new graphite foil from CeramaterialMonday, May 14, 2012, 15:04
Due to the differences in the use
of the graphite foils in past SiC targets
 parameter.JPGTGHT_0-820A.GIFgraphite_test_target_boat.pdfGraphite_Foil-Certifcate_of_Compliance-Triumf_Order-1-16-12.pdf 
  47   Tuesday, May 08, 2012, 07:42 John WongSiC38817-3HP-SISDoneSintering SiCTuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils.
 TGHT_0_270A.pngSiC#27_0-820A.JPG 
  46   Thursday, April 05, 2012, 16:47 John WongEmpty38817-3HP-SISDoneCoating target oven /w TaC & sinteringThursday, April 05, 2012, 16:43
Target oven is coated with TaC. 
The oven is wrapped with 3 Ta-heat shields.
 Targetoven_TaCsintered_archive.JPG 
  45   Tuesday, February 14, 2012, 21:56 John WongUO238481-9LP-FEBIADDoneUO2/Nb sintering process Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process.  
 Screen_shot_2012-02-14_at_9.00.04_PM.pngUO2_Nb_1_striptool.jpg 
  44   Monday, November 14, 2011, 11:56 Peter Kunz UC238634-10LP-SISDoneUCx03: Conditioning up to 175AEvaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid
 0--0009.jpg0--0011.jpg 
  43   Thursday, November 03, 2011, 09:24 John WongUC238634-10LP-SISDoneUCx#3: Final conditioning Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields,
 auto_heating_failed.jpgEvap1_TGHT_problem.jpgEvpr_org_burnout_01.jpgEvpr_org_burnout.jpgarchive_overall_process.JPG 
  42   Thursday, October 06, 2011, 12:22 John WongUO2/CUCx-heatboat#2 DoneUCx#3: Batch#2 - UO2/C mixture of carbonization  Thursday, October 06, 2011, 12:19
 
 UCx#3_batch#2_tripped@40A.jpgUCx#3_batch#2_TGHT@317A.JPGUO2_C_batch#2_Archive_overall_process.JPG 
  41   Thursday, September 29, 2011, 10:58 John WongUO2/CUCx-heatboat#2 DoneUCx#3: Batch#1 - UO2/C mixture of carbonization Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let
 6x 
  40   Thursday, September 22, 2011, 20:34 John WongEmpty38634-9LP-SISDoneSintering TaC coating for UCx#2 (spare) Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down.
  
  39   Wednesday, September 21, 2011, 13:23 John WongEmpty38634-10LP-SISDoneSintering TaC coating on target oven for UCx#3 Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. 
 archiver_TGHT0-580A.JPG 
  38   Tuesday, September 13, 2011, 16:53 John WongSiC38295-9HP-FEBIADDoneReady Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. 
 9x 
  37   Monday, September 12, 2011, 13:08 John WongEmptyTarget Boat DoneSintering TaC coating on End CapsMonday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering.  Target
 striptool.JPG 
  36   Friday, September 09, 2011, 10:05 John WongEmpty HP-FEBIADDoneSintering TaC coatingFriday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields.  Chamber
 striptool.JPG 