Entry  Thursday, April 05, 2012, 16:47, John Wong, Empty, 38817-3, HP-SIS, Done, Coating target oven /w TaC & sintering Targetoven_TaCsintered_archive.JPG
Thursday, April 05, 2012, 16:43
Target oven is coated with TaC.  The oven is wrapped with 3 Ta-heat shields.
The chamber is currently being pumped down.  Vac @ high 10e-5 Torr.  Heater will be turned on once the pressure is gone down to low 10e-6. 
Entry  Friday, October 04, 2013, 15:56, John Wong, Empty, , LP-SIS, Done, Ignore this entry - Process was done in Evap2 
Friday, October 04, 2013, 15:37
A LP target container is coated with TaC.  The container is wrapped with 3 layers to heat shield.  
This container will be used for the graphite tube test.  
Entry  Thursday, January 23, 2014, 16:29, Laura Lambert, Empty, 40282-1, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating IMG_20140123_143448877.jpgIMG_20140123_143507747.jpg
Thursday, January 23, 2014, 16:26 
 A new target boat was sprayed with TaC coating and let dry, the coating appeared slightly bubbly once dried [see attached photos].
The target boat was wrapped with 3-layers of Ta-heat shield.
    Reply  Friday, January 24, 2014, 14:45, Laura Lambert, Empty, 40282-1, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, January 23, 2014, 16:26 
    Reply  Monday, January 27, 2014, 11:03, Laura Lambert, Empty, 40282-1, TARGET BOAT, Done, Sintering Ta target boat with TaC coating IMG_20140128_113257662.jpg


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Monday, March 09, 2015, 16:58, Laura Lambert, Empty, , TARGET BOAT, Maintenance, Testing new software 
 Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program, experienced some issues; therefore, switched to same software as EVAP2.
Testing new software.
Entry  Thursday, September 21, 2017, 11:35, Laura Lambert, Empty, , , Done, Testing TBHT [1st run!], RP [new oil] and IG [new gauge] 
 Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to allow current to be applied.
Started pumping down this a.m.
Entry  Tuesday, November 07, 2017, 14:38, Laura Lambert, Empty, , LP-FEBIAD, Done, TBHT test with LP-FEBIAD evap1_data.xlsx
 Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago for temperature measurements is used for this test.
3xTa heat shields on container, incl center block - these heat shields have remained on there since the last round of tests in 2014?
Entry  Wednesday, February 28, 2018, 15:21, Laura Lambert, Empty, , TARGET BOAT, Done, Testing TGHT to induce trip 
 Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1 have tripped off the TGHT in epics within minutes of the target reaching 520A.
Loaded an empty target boat, no heat shields.
Entry  Wednesday, January 22, 2020, 18:10, Marla Cervantes, Empty, P2N-02 , , Done, P2N test#1 6x
The assembly consists of two tantalum foils, 0.001" thick, which are radially crimped to form a cylindrical surface. The outside support are two
P2N  conditioning legs, and the inside supports are tantalum tapered rings. The solidworks geometry for this test is ITD0811 in PDM. 
 
A
first current ramp up to 600 amperes on the bare naked target is attempted to benchmark the current/voltage increase in a bare target, so that we have
Entry  Wednesday, January 29, 2020, 10:11, Marla Cervantes, Empty, P2N-02, , Done, P2N test#2 P2N-test2_final_voltage.JPGP2N-test2.JPG
The assembly consists of two tantalum foils, 0.001" thick, which are radially crimped to form a cylindrical surface. The outside support are
two P2N  conditioning legs, and the inside supports are tantalum tapered rings. The solidworks geometry for this test is ITD0811 in PDM. 
 
 The
P2N is attached to EVAP1 with copper legs and copper shims. A current ramp up to 600 A on the target wrapped with heat shields is attempted to benchmark
Entry  Thursday, October 25, 2012, 15:03, John Wong, BeO, Ta-target boat (old), , In progress, Sintering BeO pellets #5 - testing Re foil as the protective under layer BeO_pellets_on_Re_foil.PNGTGHT_0-400A.PNGBeO_pellet#5_TGHT_100-600A.PNGBeO_pellet#5_@_600A__11hrs.PNG
Thursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets 1 to 4 were done in Evaporator#2.
3 BeO pellets were made.  Each weights about 1.3g (including org mass). 
Entry  Wednesday, March 23, 2011, 18:23, John Wong, , , , , Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) grab.K18246.pnggrab.g20718.pnggrab.r27097.pnggrab.t30095.png
March 23, 2011
12:30: Target oven is wrapped with 3 Ta-heat shields.  Pumping down evaporator
18:24: IEVAPIG1 is reading at 4.55e-6 Torr.  The p/s will be turned on tomorrow since there is no ISAC Ops on site. 
    Reply  Friday, March 25, 2011, 17:22, John Wong, , , , , Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) 


    
        
            John Wong wrote:
        
        
            
            March 23, 2011
    Reply  Monday, March 28, 2011, 11:20, , , , HP-FEBIAD, Done, Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) 


    
        
            John
Wong wrote:
        
        
            
            
            
Entry  Tuesday, March 29, 2011, 10:20, , , , , Problems, Loss of cooling water 
According to Jonathan Aoki, the electricians will be servicing another MCC which will result in loss of cooling water for about 8 hours starting at 16:00
March 30.  We shouldn't be running the evaporator or any condensers at that time.
Entry  Tuesday, March 29, 2011, 10:30, , , , , Done, Loss of cooling water update 
It's the NON-ACTIVE water that will go off.  The evaporator is on sity water, so it will be OK.
Entry  Tuesday, May 17, 2011, 16:43, John Wong, , , , Maintenance, Evaporator Ion gauge replaced  
The evaporator ion gauge filament burnt out on May 11, 2011.  A target was in the evaporator at that time and was about to being the sintering process. 
The gauge had two filaments, so vacuum group helped to switch to the second filament.  The evaporator was vented on May 17, 2011, and a new ion gauge
with two filaments was installed.  The gauge was tested and it's working fine. 
Entry  Monday, May 14, 2012, 15:22, John Wong, , Target boat, , , Testing the new graphite foil from Ceramaterial parameter.JPGTGHT_0-820A.GIFgraphite_test_target_boat.pdfGraphite_Foil-Certifcate_of_Compliance-Triumf_Order-1-16-12.pdf
Monday, May 14, 2012, 15:04
Due to the differences in the use of the graphite foils in past SiC targets (C-grv foil from Alpha Aesar) and the newly prepared SiC#27 (C-grv
foil from Ceramaterial), the out-gassing period for SiC#27 took over 6 days compared to 3 days for the vacuum to come down (see https://elog.triumf.ca/TIS/Evaporator_1/47). 
Entry  Tuesday, June 12, 2012, 14:43, John Wong, , , , Maintenance, Changing backing pump oil 
 Tuesday, June 12, 2012, 14:38
The backing pump oil was changed (ISAC WP#2012-06-12-1). 