  353   Tue Oct 26 09:19:39 2010 Damien Gallop  26Mg6+ for TIGRESSThe TIGRESS run was scheduled to end at
08:30, but has been extended for 24h. The
ICR reports that they are getting "good
 Picture_1.png 
  352   Mon Oct 25 09:05:15 2010 Damien Gallop  26Mg6+ for TIGRESSSmooth delivery (from OLIS point-of-view)
to TIGRESS over the weekend. An SCB RF amplifier
failed yesterday and was replaced. Tuning
 Picture_3.png 
  351   Fri Oct 22 09:35:24 2010 Damien Gallop  26Mg6+ for TIGRESSA 26Mg beam was handed over to TIGRESS
last evening. It is 26Mg6+ through ISAC-I
and further stripped to 26Mg10+ by the time
  
  350   Thu Oct 21 11:46:14 2010 Damien Gallop  26Mg6+ for TIGRESSThe MWS was restarted yesterday, and a
26Mg beam re-established. ICR set up into
ISAC-II overnight, and tuning to TIGRESS
 Picture_14.png 
  349   Wed Oct 20 11:30:32 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS ran fine overnight. It was shut off
this morning to investigate bias sparking
issue, noted on FR#4894. The two MCIS turbopump
 Picture_6.pngPicture_7.pngPicture_9.png 
  348   Tue Oct 19 09:20:40 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS operating nicely.  Picture_1.png 
  347   Mon Oct 18 09:22:35 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS is producing 26Mg, presently parked.
It was used over the weekend
for TUDA tuning.
 Picture_5.png 
  346   Fri Oct 15 09:23:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource is running nicely. Hand-off
to ICR occurred ~Wednesday night. Setup done
overnight.
 Picture_2.png 
  345   Wed Oct 13 16:15:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource conditioning most of today, to 59kV.
Striptool attached. Reset to 26Mg tune at
~16:00.
 Picture_1.png 
  344   Tue Oct 12 13:25:21 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource switchover in progress on WP#2010-10-12-1.
Magnesium material installed into MWS. Pumpdown
 grab.J26422.pnggrab.J27689.png 
  343   Fri Oct 8 09:35:03 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESSBeam from MWS quietly sitting on FC6 awaiting
tune checks to TIGRESS. Next experiments
up are 26Alg5+ to TUDA and 24Na5+ to TIGRESS.
 Picture_1.png 
  342   Mon Oct 4 09:46:12 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS setupA 20Ne1+ beam from the MWS was established
on Friday. Line tuning began Friday evening.
A tune to the front of the SC LINAC was in
  
  341   Mon Oct 4 09:40:30 2010 Damien Gallop  OLIS Maintenance and Development completedThe September Mini-Shutdown is now a memory.
The few days available to OLIS were used
for MCIS Development on 197Au. Productive.
  
  340   Fri Sep 24 13:22:00 2010 Damien Gallop  OLIS Maintenance and DevelopmentSupernanogan on overnight, in the search
for gold. A trace of 197Au34 observed this
morning. Development continues.
  
  339   Thu Sep 23 09:20:34 2010 Damien Gallop  4He1+ for DRAGONDRAGON continues to take MWS beam.
Later... 14:00 EOB. Prepare for Mini-Shutdown.
 Picture_1.pngPicture_1.pngPicture_2.pngPicture_3.png 
  338   Mon Sep 20 09:34:44 2010 Damien Gallop  4He1+ for DRAGONMCIS Development finished Friday evening.
OLIS switched to MWS operation and setup
began for 4He1+ delivery to DRAGON. Beam
  
  337   Fri Sep 17 14:02:29 2010 Damien Gallop  MCIS DevelopmentToday's agenda: RF frequency scans and
generally getting a feel for the new sputter
source.
 Picture_3.pngPicture_5.pngPicture_2.pngAu25beam.pngAubeamNoSputter.png 
  336   Thu Sep 16 17:06:22 2010 Damien Gallop  MCIS DevelopmentA new sputter source was installed onto
the Supernanogan. A wire of Au is installed
in the source. Mass scans this morning with
 grab.yx5537.pngmcis2010sep16Au.png 
  335   Tue Sep 14 09:18:28 2010 Damien Gallop  MCIS DevelopmentThe 16O3+ DRAGON run just finished. MCIS
Development begins this morning for a few
days. The goal is to install and characterize
 8x 
  334   Fri Sep 10 10:38:13 2010 Damien Gallop  16O3+ for DRAGON   grab.E24058.png 