ID Date Author Type Category Subject
  353   Tue Oct 26 09:19:39 2010 Damien Gallop  26Mg6+ for TIGRESS

The TIGRESS run was scheduled to end at 08:30, but has been extended for 24h. The ICR reports that they are getting "good data" with the present beam. Why mess with what works?

We will expect to begin the MWS switchover tomorrow.

Attachment 1: Picture_1.png
Picture_1.png
  352   Mon Oct 25 09:05:15 2010 Damien Gallop  26Mg6+ for TIGRESS

Smooth delivery (from OLIS point-of-view) to TIGRESS over the weekend. An SCB RF amplifier failed yesterday and was replaced. Tuning was done. Source is stable.

There were a couple of bias sparks over the weekend, expected during Mg runs. The mag stability program got knocked off at some point. Restart OK.

Attachment 1: Picture_3.png
Picture_3.png
  351   Fri Oct 22 09:35:24 2010 Damien Gallop  26Mg6+ for TIGRESS

A 26Mg beam was handed over to TIGRESS last evening. It is 26Mg6+ through ISAC-I and further stripped to 26Mg10+ by the time they get it. Approximately 2.5pnA at FC6.

  350   Thu Oct 21 11:46:14 2010 Damien Gallop  26Mg6+ for TIGRESS

The MWS was restarted yesterday, and a 26Mg beam re-established. ICR set up into ISAC-II overnight, and tuning to TIGRESS began this morning. Note the experiment change due to circumstances at the RIB targets.

Attachment 1: Picture_14.png
Picture_14.png
  349   Wed Oct 20 11:30:32 2010 Damien Gallop  26Mg6+ for TUDA-II

MWS ran fine overnight. It was shut off this morning to investigate bias sparking issue, noted on FR#4894. The two MCIS turbopump controllers are displaying gibberish on their front panels this morning. There was one spark since yesterday, around 19:15 last evening. Due to a failure at ITW - see here and here, a proposal is made to deliver 26Mg to the experiment for data.

Attachment 1: Picture_6.png
Picture_6.png
Attachment 2: Picture_7.png
Picture_7.png
Attachment 3: Picture_9.png
Picture_9.png
  348   Tue Oct 19 09:20:40 2010 Damien Gallop  26Mg6+ for TUDA-II

MWS operating nicely.

Attachment 1: Picture_1.png
Picture_1.png
  347   Mon Oct 18 09:22:35 2010 Damien Gallop  26Mg6+ for TUDA-II

MWS is producing 26Mg, presently parked. It was used over the weekend for TUDA tuning.

Attachment 1: Picture_5.png
Picture_5.png
  346   Fri Oct 15 09:23:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beams

Source is running nicely. Hand-off to ICR occurred ~Wednesday night. Setup done overnight. 26Mg (PE is now on at nominal value) is selected presently; blue trace on Stripchart.

Attachment 1: Picture_2.png
Picture_2.png
  345   Wed Oct 13 16:15:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beams

Source conditioning most of today, to 59kV. Striptool attached. Reset to 26Mg tune at ~16:00.

Attachment 1: Picture_1.png
Picture_1.png
  344   Tue Oct 12 13:25:21 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beams

Source switchover in progress on WP#2010-10-12-1. Magnesium material installed into MWS. Pumpdown in progress. Leakup rate OK. Turbos on.

Later... Pumping going well. at 1e-6 by ~16:00.

Attachment 1: grab.J26422.png
grab.J26422.png
Attachment 2: grab.J27689.png
grab.J27689.png
  343   Fri Oct 8 09:35:03 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS

Beam from MWS quietly sitting on FC6 awaiting tune checks to TIGRESS. Next experiments up are 26Alg5+ to TUDA and 24Na5+ to TIGRESS. So we are poised for source switchover to provide 24/26Mg pilot beams from the MWS.

Attachment 1: Picture_1.png
Picture_1.png
  342   Mon Oct 4 09:46:12 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS setup

A 20Ne1+ beam from the MWS was established on Friday. Line tuning began Friday evening. A tune to the front of the SC LINAC was in place by Saturday. Tuning through was delayed by SC tank conditioning.When the LINAC is ready, tuning to TIGRESS will resume, expected today.

  341   Mon Oct 4 09:40:30 2010 Damien Gallop  OLIS Maintenance and Development completed

The September Mini-Shutdown is now a memory. The few days available to OLIS were used for MCIS Development on 197Au. Productive. A 197Au34+ beam sat on FC6 overnight. The program ended Friday, at which point a 20Ne1+ beam from the MWS was established, and line tuning commenced.

  340   Fri Sep 24 13:22:00 2010 Damien Gallop  OLIS Maintenance and Development

Supernanogan on overnight, in the search for gold. A trace of 197Au34 observed this morning. Development continues.

A/q: 5.7941

FC6: ~500epA

Bias: 10,876V

EL: 4274V

Sputter source bias: 1262V

RF frequency: 13.60175 GHz

RF amplitude: 10dB (~16W FP)

MCIS:IG1: 6.8e-8 Torr

  339   Thu Sep 23 09:20:34 2010 Damien Gallop  4He1+ for DRAGON

DRAGON continues to take MWS beam.

Later... 14:00 EOB. Prepare for Mini-Shutdown.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_1.png
Picture_1.png
Attachment 3: Picture_2.png
Picture_2.png
Attachment 4: Picture_3.png
Picture_3.png
  338   Mon Sep 20 09:34:44 2010 Damien Gallop  4He1+ for DRAGON

MCIS Development finished Friday evening. OLIS switched to MWS operation and setup began for 4He1+ delivery to DRAGON. Beam handed over to experiment last night.

  337   Fri Sep 17 14:02:29 2010 Damien Gallop  MCIS Development

Today's agenda: RF frequency scans and generally getting a feel for the new sputter source.

Mass scan plots in region of 197Au25+ attached below, taken with and without the sputter source on. Matlab post-processed pics to come shortly.

Attachment 1: Picture_3.png
Picture_3.png
Attachment 2: Picture_5.png
Picture_5.png
Attachment 3: Picture_2.png
Picture_2.png
Attachment 4: Au25beam.png
Au25beam.png
Attachment 5: AubeamNoSputter.png
AubeamNoSputter.png
  336   Thu Sep 16 17:06:22 2010 Damien Gallop  MCIS Development

A new sputter source was installed onto the Supernanogan. A wire of Au is installed in the source. Mass scans this morning with source at equipotential. Source patched to MWS EE supply and biased to ~1kV tunable. That makes a significant improvement in intensity. Beam at FC6 is 197Au24+ presently.

Attachment 1: grab.yx5537.png
grab.yx5537.png
Attachment 2: mcis2010sep16Au.png
mcis2010sep16Au.png
  335   Tue Sep 14 09:18:28 2010 Damien Gallop  MCIS Development

The 16O3+ DRAGON run just finished. MCIS Development begins this morning for a few days. The goal is to install and characterize the new sputter ion source.

Below are vacuum pics before and after closing MCIS:IV0. There was a bit of a spike during closing. All three turbos switched off. TP3 is down now.

Later... Keerthi requests we look at 16O7+ production as a measure of source performance. Done. Chart appended below, with source panels. Mass scan next.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_2.png
Picture_2.png
Attachment 3: Picture_3.png
Picture_3.png
Attachment 4: Picture_4.png
Picture_4.png
Attachment 5: Picture_5.png
Picture_5.png
Attachment 6: Picture_3.png
Picture_3.png
Attachment 7: Picture_2.png
Picture_2.png
Attachment 8: Picture_1.png
Picture_1.png
  334   Fri Sep 10 10:38:13 2010 Damien Gallop  16O3+ for DRAGON
Attachment 1: grab.E24058.png
grab.E24058.png