OLIS Logbook General
  General, Page 9 of 26  Not logged in ELOG logo
Entry  Tue Oct 26 09:19:39 2010, Damien Gallop, , , 26Mg6+ for TIGRESS Picture_1.png
The TIGRESS run was scheduled to end at 08:30, but has been extended for 24h. The ICR reports that they are getting "good data" with the present
beam. Why mess with what works?
We will expect to begin the MWS switchover tomorrow.
Entry  Mon Oct 25 09:05:15 2010, Damien Gallop, , , 26Mg6+ for TIGRESS Picture_3.png
Smooth delivery (from OLIS point-of-view) to TIGRESS over the weekend. An SCB RF amplifier failed yesterday and was replaced. Tuning was done. Source
is stable.
There were a couple of bias sparks over the weekend, expected during Mg runs. The mag stability program got knocked off at some point. Restart
Entry  Fri Oct 22 09:35:24 2010, Damien Gallop, , , 26Mg6+ for TIGRESS 
A 26Mg beam was handed over to TIGRESS last
evening. It is 26Mg6+ through ISAC-I and further stripped to 26Mg10+ by the time they get it. Approximately 2.5pnA at FC6.
Entry  Thu Oct 21 11:46:14 2010, Damien Gallop, , , 26Mg6+ for TIGRESS Picture_14.png
The MWS was restarted yesterday, and a 26Mg beam re-established. ICR set up into ISAC-II overnight, and tuning to TIGRESS
began this morning. Note the experiment change due to circumstances at the RIB
targets.
Entry  Wed Oct 20 11:30:32 2010, Damien Gallop, , , 26Mg6+ for TUDA-II Picture_6.pngPicture_7.pngPicture_9.png
MWS ran fine overnight. It was shut off this morning to investigate bias sparking issue, noted on FR#4894. The two MCIS turbopump controllers are displaying
gibberish on their front panels this morning. There was one spark since yesterday, around 19:15 last evening. Due to a failure
at ITW - see here and here,
Entry  Tue Oct 19 09:20:40 2010, Damien Gallop, , , 26Mg6+ for TUDA-II Picture_1.png
MWS operating nicely.
Entry  Mon Oct 18 09:22:35 2010, Damien Gallop, , , 26Mg6+ for TUDA-II Picture_5.png
MWS is producing 26Mg, presently parked. It was used over the weekend
for TUDA tuning.
Entry  Fri Oct 15 09:23:03 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams Picture_2.png
Source is running nicely. Hand-off to ICR
occurred ~Wednesday night. Setup done overnight.
26Mg (PE is now on at nominal value) is selected presently; blue trace on Stripchart.
Entry  Wed Oct 13 16:15:03 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams Picture_1.png
Source conditioning most of today, to 59kV. Striptool attached. Reset to 26Mg tune at ~16:00.
Entry  Tue Oct 12 13:25:21 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams grab.J26422.pnggrab.J27689.png
Source switchover in progress on WP#2010-10-12-1. Magnesium material
installed into MWS. Pumpdown in progress. Leakup rate OK. Turbos on.
Later... Pumping going well. at 1e-6 by ~16:00.
Entry  Fri Oct 8 09:35:03 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for TIGRESS Picture_1.png
Beam from MWS quietly sitting on FC6 awaiting tune checks to TIGRESS. Next experiments up are 26Alg5+ to TUDA and 24Na5+ to TIGRESS. So we are poised
for source switchover to provide 24/26Mg pilot beams from the MWS.
Entry  Mon Oct 4 09:46:12 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for TIGRESS setup 
A 20Ne1+ beam from the MWS was established on Friday. Line tuning began Friday evening. A tune to the front of the SC LINAC was in place by Saturday.
Tuning through was delayed by SC tank conditioning.When
the LINAC is ready, tuning to TIGRESS will
Entry  Mon Oct 4 09:40:30 2010, Damien Gallop, , , OLIS Maintenance and Development completed 
The September Mini-Shutdown is now a memory. The few days available to OLIS were used for MCIS Development on 197Au. Productive. A 197Au34+ beam sat
on FC6 overnight. The program ended
Friday, at which point a 20Ne1+ beam from the MWS was established, and line tuning
Entry  Fri Sep 24 13:22:00 2010, Damien Gallop, , , OLIS Maintenance and Development 
Supernanogan on overnight, in the search for gold. A trace of 197Au34 observed this morning. Development continues.
A/q: 5.7941
FC6: ~500epA
Entry  Thu Sep 23 09:20:34 2010, Damien Gallop, , , 4He1+ for DRAGON Picture_1.pngPicture_1.pngPicture_2.pngPicture_3.png
DRAGON continues to take MWS beam.
Later... 14:00 EOB. Prepare for Mini-Shutdown.
Entry  Mon Sep 20 09:34:44 2010, Damien Gallop, , , 4He1+ for DRAGON 
MCIS Development finished Friday evening. OLIS switched to MWS operation and setup began for 4He1+ delivery to DRAGON. Beam handed over to experiment
last night.
Entry  Fri Sep 17 14:02:29 2010, Damien Gallop, , , MCIS Development Picture_3.pngPicture_5.pngPicture_2.pngAu25beam.pngAubeamNoSputter.png
Today's agenda: RF frequency scans and generally getting a feel for the new sputter source.
Mass scan plots in region of 197Au25+ attached below, taken with and without the sputter source on. Matlab post-processed pics to come shortly.
Entry  Thu Sep 16 17:06:22 2010, Damien Gallop, , , MCIS Development grab.yx5537.pngmcis2010sep16Au.png
A new sputter source was installed onto the Supernanogan. A wire of Au is installed in the source. Mass scans this morning with source at equipotential.
Source patched to MWS EE supply and biased to ~1kV tunable. That makes a significant improvement in intensity. Beam at FC6 is 197Au24+ presently.
Entry  Tue Sep 14 09:18:28 2010, Damien Gallop, , , MCIS Development 8x
The 16O3+ DRAGON run just finished. MCIS Development begins this morning for a few days. The goal is to install and characterize the new sputter ion
source.
Below are vacuum pics before and after closing MCIS:IV0. There was a bit of a spike during closing. All three turbos switched off. TP3 is down
Entry  Fri Sep 10 10:38:13 2010, Damien Gallop, , , 16O3+ for DRAGON grab.E24058.png
 