OLIS Logbook General
  General, Page 7 of 26  Not logged in ELOG logo
Entry  Tue Jun 16 16:47:02 2009, Damien Gallop, Routine, General, Mass scan around 16O5+ grab.W16564.pnggrab.W24269.pnggrab.x24327.pnggrab.w24262.png
Keerthi suggested using 16O5+ for optimizing the source. I did a tight mass scan in that area, and 16O5+ is clearly visible. I will use it for some source
tweaking. Also, I used Gabe's calibration program to slightly adjust the values of the two constants. There are some 10nA of 16O5+ on FC6 presently. Final
settings for today, etc. are attached below.
Entry  Thu Oct 30 22:44:45 2014, Keerthi Jayamanna, Routine, General, Mass scan 3 to 4 
IOS mass scan if faulty. These is a manual scan from mass 3 to 4
Const22 = 0.04187  adjusted to mass = 4
A/q               FC6           X         
Entry  Thu Oct 30 23:37:58 2014, Keerthi Jayamanna, Routine, General, Mass scan 4 to 6 
A/Q            FC6
4                1.1e-6
4.25          8e-10
Entry  Thu Oct 28 17:51:49 2010, Damien Gallop, , , MWS switchover for scheduled 85/87Rb beams grab.N32655.png
A controls issue with IOS:BIAS was found yesterday. Controls people resolved it today. MWS source was switched over and prepared for Rb beam. Leakchecking
done: tight. Source should pump for a little while longer before energizing. At present, leak detector is attached to the IOS roughing line. Pic attached
with IOS:BP1 alternately online and offline.
Entry  Thu Oct 28 17:51:49 2010, Damien Gallop, , , MWS switchover for scheduled 85/87Rb beams Picture_1.png
A controls issue with IOS:BIAS was found yesterday. Controls people resolved it today. MWS source was switched over and prepared for Rb beam. Leakchecking
done: tight. Source should pump for a little while longer before energizing. At present, leak detector is attached to the IOS roughing line.
Later... Noticed that MCIS:TP2 was tripped off. After a couple of tries, it restarted okay. Hmm...
Entry  Tue Oct 12 13:25:21 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams grab.J26422.pnggrab.J27689.png
Source switchover in progress on WP#2010-10-12-1. Magnesium material
installed into MWS. Pumpdown in progress. Leakup rate OK. Turbos on.
Later... Pumping going well. at 1e-6 by ~16:00.
Entry  Wed Oct 13 16:15:03 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams Picture_1.png
Source conditioning most of today, to 59kV. Striptool attached. Reset to 26Mg tune at ~16:00.
Entry  Fri Oct 15 09:23:03 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams Picture_2.png
Source is running nicely. Hand-off to ICR
occurred ~Wednesday night. Setup done overnight.
26Mg (PE is now on at nominal value) is selected presently; blue trace on Stripchart.
Entry  Wed Jun 3 16:17:51 2009, Damien Gallop, Routine, General, MWS started for 18O1+ production to TIGRESS 
A couple of weeks of 17O3+ to DRAGON ended yesterday with a photo finish. Supernanogan went off at 10:00. Preparations for 18O began. Main event for
yesterday: Replace IOS:TP7. Edi Dalla Valle reported that he had just received a V550 with Conflat flange. "Our timing was perfect." It is working
well. The system was under vacuum again by around noon, and pumped overnight. This morning IG1 was ~5e-7 Torr and IG4 was ~2e-7 Torr, where those two gauges
Entry  Tue Aug 4 11:13:04 2009, Damien Gallop, , , MWS source tuning for 25Mg operation 6x
The source stayed up overnight just fine, with a little 25Mg beam on FC6. This morning I did a few mass scans to get a fix on Mg positions. Short story:
There are some 3nA of 25Mg on FC6 presently, with things less than optimal. Stay tuned.
Attached is an early graph of Mg beams produced with the MWS almost exactly five years ago. Best I could find for now.
Entry  Mon Aug 10 18:29:32 2009, Damien Gallop, , , MWS source trip & restart grab.q23803.png
Well, so it goes. As I was penning a note for OPS, the source tripped. It easily reignited with a little extra Ne. I left the flow slightly higher, from
1.1 to 1.2ccm and the PE at 41V.
Entry  Tue Jul 21 17:11:33 2009, Damien Gallop, , , MWS preparations for 21Ne operation Picture_23.png
With the MCIS cart removed, Geoff hooked up the leak detector to the MWS source gas line. He did a couple of hours of leak checking in this mode. Then
he moved the connection to an empty gas port on the manifold itself. Much qicker responses. We replaced a VCR seal on the bottle side of the right-hand
He solenoid valve. That did wonders. He checked around afterwards, but found no further leak. We tidied up and opened the manifold to IOS. Base pressure
Entry  Wed Aug 5 11:29:51 2009, Damien Gallop, , , MWS operation overnight and 25Mg status grab.G24908.pnggrab.h24912.pnggrab.T24916.pnggrab.W24925.pnggrab.x24953.png
So... there evidently was a power bump overnight, because the stability power supply was "disconnected" from the system. This happens every
time there is a power bump. It's a serial port thing. Meanwhile, the source also tripped. Upon restart, nothing was the same. This morning, we found that
Q3 was current-limiting on one element. We have asked Rick to develop an alternate tune for us.
Entry  Wed Jul 22 01:33:29 2009, Damien Gallop, , , MWS initial startup summary 
Vacuum came down to ~7e-7 Torr. On startup, bias sparked over somewhere. Vacuum leak was caused. Later we found that HV had sparked through the source
gas tubing, which was touching the beamline frame. Obviously an arc had formed within the tube and sparked through on the ground side. We also could not
reset the bias interlock (ICR has efaulted this), so we ran in local. System is set up for 21Ne with about 28nA on FC6. Bias is off for the night, while
Entry  Fri Oct 29 09:41:20 2010, Damien Gallop, , , MWS Development 6x
MWS source switchover yesterday was successful. Leakchecking went well. A small leak on the intermediate section sealed with a snug on the two bellows
fixing bolts. The microwave window required cleaning. It tested leak-tight. All good. Pumpdown curve to come. Meanwhile, source was restarted last night.
First 85Rb is on FC6 presently. Although OLIS has run Rb beam in the past using the SIS, this is a milestone for the MWS. Development to proceed today.
Entry  Mon Nov 1 09:30:15 2010, Damien Gallop, , , MWS Development Picture_45.pngPicture_1.pngPicture_2.pngPicture_3.png
The source stayed up steadily over the weekend, with 85Rb on FC6. Not a lot of current, but pretty good for a first pass. More development today. Source
settings shown below. As previously noted, the 2.5mm slits are selected. Also, the present IOS tune is for effect, not by the book.
Next up: Try some variations on the source setup.
Entry  Tue Nov 2 09:25:30 2010, Damien Gallop, , , MWS Development Picture_1.pngPicture_1.png
85Rb on FC6 overnight. After restarting the source yesterday following development, the beam intensity came back, but it's slightly unstable compared
to before. Mag stability program is active.
Later... Work with the source for a while. Improved. Stripchart attached. Time will tell. Save: 101102_14:30.snapiosfc6.
Entry  Thu Aug 6 17:02:00 2009, Damien Gallop, , , MWS 25Mg tuning to TIGRESS in progress 7x
Tuning has been on-going through the day. Here are a couple of emittance scans taken in-between heartbeats. The first is zoomed out, the second zoomed
in a little close. We managed to sneak in a third also.
Entry  Mon Aug 10 18:06:09 2009, Damien Gallop, , , MWS 25Mg reduce intensity with PE grab.W23753.png
So... we have had this on-going problem with intense Mg beam coating our optics. Keerthi found a good recipe last week with PE on and a somewhat large
support gas flow. We have been running with several tens of nA since. Since yesterday's trip, I have been gradually lowering the PE from my initial value
of 100V to 30V presently with about 10nA on FC6. Beam looks like it will be very stable, and the EE will maintain indefinitely like this. The first test:
Entry  Tue Aug 11 09:54:28 2009, Damien Gallop, , , MWS 25Mg operation overnight & MCIS cart installation grab.Z26532.pnggrab.Y26538.png
As noted earlier, the MWS beam dropped out at some point after yesterday afternoon's playtime, due to insufficient PE. Plasma was lost. I restarted the
source remotely. The present combination of Ne flow SP = 1.2ccm and PE = 48V works well. Plasma will persist regardless of Mg presence or PE setting. That's
a good thing. Then using the PE we can control how the plasma ionizes the Mg material. Note the attached stripcharts. At the lower PE settings, the Mg
ELOG V2.9.2-2455