ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
21
|
Tue Jun 16 16:47:02 2009 |
Damien Gallop | Routine | General | Mass scan around 16O5+ | Keerthi suggested using 16O5+ for optimizing
the source. I did a tight mass scan in that
area, and 16O5+ is clearly visible. I will |
   |
494
|
Thu Oct 30 22:44:45 2014 |
Keerthi Jayamanna | Routine | General | Mass scan 3 to 4 | IOS mass scan if faulty. These is a manual
scan from mass 3 to 4
Const22 = 0.04187 adjusted |
|
495
|
Thu Oct 30 23:37:58 2014 |
Keerthi Jayamanna | Routine | General | Mass scan 4 to 6 | A/Q
FC6
4 |
|
356
|
Thu Oct 28 17:51:49 2010 |
Damien Gallop | | | MWS switchover for scheduled 85/87Rb beams | A controls issue with IOS:BIAS was found
yesterday. Controls people resolved it today.
MWS source was switched over and prepared |
|
355
|
Thu Oct 28 17:51:49 2010 |
Damien Gallop | | | MWS switchover for scheduled 85/87Rb beams | A controls issue with IOS:BIAS was found
yesterday. Controls people resolved it today.
MWS source was switched over and prepared |
|
344
|
Tue Oct 12 13:25:21 2010 |
Damien Gallop | | | MWS switchover for scheduled 24/26Mg beams | Source switchover in progress on WP#2010-10-12-1.
Magnesium material installed into MWS. Pumpdown |
 |
345
|
Wed Oct 13 16:15:03 2010 |
Damien Gallop | | | MWS switchover for scheduled 24/26Mg beams | Source conditioning most of today, to 59kV.
Striptool attached. Reset to 26Mg tune at
~16:00. |
|
346
|
Fri Oct 15 09:23:03 2010 |
Damien Gallop | | | MWS switchover for scheduled 24/26Mg beams | Source is running nicely. Hand-off
to ICR occurred ~Wednesday night. Setup done
overnight. |
|
8
|
Wed Jun 3 16:17:51 2009 |
Damien Gallop | Routine | General | MWS started for 18O1+ production to TIGRESS | A couple of weeks of 17O3+ to DRAGON ended
yesterday with a photo finish. Supernanogan
went off at 10:00. Preparations for 18O began. |
|
114
|
Tue Aug 4 11:13:04 2009 |
Damien Gallop | | | MWS source tuning for 25Mg operation | The source stayed up overnight just fine,
with a little 25Mg beam on FC6. This morning
I did a few mass scans to get a fix on Mg |
6x |
126
|
Mon Aug 10 18:29:32 2009 |
Damien Gallop | | | MWS source trip & restart | Well, so it goes. As I was penning a note
for OPS, the source tripped. It easily reignited
with a little extra Ne. I left the flow slightly |
|
109
|
Tue Jul 21 17:11:33 2009 |
Damien Gallop | | | MWS preparations for 21Ne operation | With the MCIS cart removed, Geoff hooked
up the leak detector to the MWS source gas
line. He did a couple of hours of leak checking |
|
115
|
Wed Aug 5 11:29:51 2009 |
Damien Gallop | | | MWS operation overnight and 25Mg status | So... there evidently was a power bump
overnight, because the stability power supply
was "disconnected" from the system. |
    |
110
|
Wed Jul 22 01:33:29 2009 |
Damien Gallop | | | MWS initial startup summary | Vacuum came down to ~7e-7 Torr. On startup,
bias sparked over somewhere. Vacuum leak
was caused. Later we found that HV had sparked |
|
357
|
Fri Oct 29 09:41:20 2010 |
Damien Gallop | | | MWS Development | MWS source switchover yesterday was successful.
Leakchecking went well. A small leak on the
intermediate section sealed with a snug on |
6x |
358
|
Mon Nov 1 09:30:15 2010 |
Damien Gallop | | | MWS Development | The source stayed up steadily over the
weekend, with 85Rb on FC6. Not a lot of current,
but pretty good for a first pass. More development |
   |
359
|
Tue Nov 2 09:25:30 2010 |
Damien Gallop | | | MWS Development | 85Rb on FC6 overnight. After restarting
the source yesterday following development,
the beam intensity came back, but it's slightly |
 |
116
|
Thu Aug 6 17:02:00 2009 |
Damien Gallop | | | MWS 25Mg tuning to TIGRESS in progress | Tuning has been on-going through the day.
Here are a couple of emittance scans taken
in-between heartbeats. The first is zoomed |
7x |
125
|
Mon Aug 10 18:06:09 2009 |
Damien Gallop | | | MWS 25Mg reduce intensity with PE | So... we have had this on-going problem
with intense Mg beam coating our optics.
Keerthi found a good recipe last week with |
|
127
|
Tue Aug 11 09:54:28 2009 |
Damien Gallop | | | MWS 25Mg operation overnight & MCIS cart installation | As noted earlier, the MWS beam dropped
out at some point after yesterday afternoon's
playtime, due to insufficient PE. Plasma |
 |