480
Wed Aug 13 15:00:27 2014
Raymond Dubé
Routine
General
OLIS Surface Source broken Ionizer Coil
We spent
most of the day looking at OLIS to find out
why the "Ionizer Coil" keeps breaking
496
Thu Oct 30 23:44:57 2014
Keerthi Jayamanna
Routine
General
OLIS Supernanogan mass scan 6 to 7.5
A/q
FC6 (only current over 100pA)
6.0
478
Wed Jan 29 12:27:57 2014
Raymond Dubé
OLIS Skimmers BOP & Labels
I updated
2 drawings that show the OLIS skimmers.
A.
225
Wed Feb 10 17:18:24 2010
Damien Gallop
OLIS Shutdown in progress
OLIS Shutdown has been in progress for
a week. IOS is vented, was swiped clean and
opened. DB3 was craned out, a precision job.
226
Fri Feb 12 14:42:06 2010
Damien Gallop
OLIS Shutdown in progress
Supernanogan cart removed from Faraday
cage to dock today. Some beam safety tests
on FC6 in progress presently. FC3 was already
8x
227
Tue Feb 16 16:04:18 2010
Damien Gallop
OLIS Shutdown in progress
Preparations for rewiring the DB1/3 optics
have begun. Sgan gas manifold work is in
progress. Note: IOS:MP1 is scheduled for
228
Wed Feb 17 18:28:33 2010
Damien Gallop
OLIS Shutdown in progress
More materials prepared for optics refit.
229
Fri Feb 19 17:54:40 2010
Damien Gallop
OLIS Shutdown in progress
Partial disassembly of DB1 optics today.
Shielding of insulators is definitely working
and indicated for unshielded insulators.
224
Wed Feb 3 16:30:02 2010
Damien Gallop
OLIS Shutdown began today
We prepared stuff last night. This morning
we vented IOS to argon, then swiped. Clean.
Lu and Ajit craned out DB3 for us. Nice job,
508
Mon Apr 20 08:09:03 2015
Brian Minato
Routine
General
OLIS Shutdown Update
The OLIS 1 week shutdown has been completed
(WP 2015-04-13-1).
General-
459
Mon Oct 31 11:06:58 2011
Damien Gallop
OLIS Shutdown
Two weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
460
Tue Nov 1 10:18:02 2011
Damien Gallop
OLIS Shutdown
MCIS pumped overnight. Still coming down.
461
Wed Nov 2 10:16:49 2011
Damien Gallop
OLIS Shutdown
MCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
462
Thu Nov 3 09:50:05 2011
Damien Gallop
OLIS Shutdown
MCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
463
Fri Nov 4 09:41:32 2011
Damien Gallop
OLIS Shutdown
MCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
464
Mon Nov 7 09:58:17 2011
Damien Gallop
OLIS Shutdown
IOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
465
Tue Nov 8 10:02:54 2011
Damien Gallop
OLIS Shutdown
Supernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
466
Wed Nov 9 11:40:35 2011
Damien Gallop
OLIS Shutdown
Supernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
467
Thu Nov 10 09:57:57 2011
Damien Gallop
OLIS Shutdown
Supernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
383
Fri Feb 18 11:05:50 2011
Keerthi Jayamanna
OLIS Problems
PE set point is ok but read back is half of
the real value.