  480   Wed Aug 13 15:00:27 2014 Raymond DubéRoutineGeneralOLIS Surface Source broken Ionizer CoilWe spent
most of the day looking at OLIS to find out
why the "Ionizer Coil" keeps breaking
 ISK4386D-rev5.pdfISK4583D-rev7.pdfISK4584D-rev1.pdfPE-R5-FAN_ON.jpg 
  496   Thu Oct 30 23:44:57 2014 Keerthi JayamannaRoutineGeneralOLIS Supernanogan mass scan 6 to 7.5A/q          
FC6  (only current over 100pA)
6.0          
  
  478   Wed Jan 29 12:27:57 2014 Raymond Dubé  OLIS Skimmers BOP & LabelsI updated
2 drawings that show the OLIS skimmers.
A. 
 isk4363d-rev4.pdfisk4365d-rev2.pdf 
  225   Wed Feb 10 17:18:24 2010 Damien Gallop  OLIS Shutdown in progressOLIS Shutdown has been in progress for
a week. IOS is vented, was swiped clean and
opened. DB3 was craned out, a precision job.
  
  226   Fri Feb 12 14:42:06 2010 Damien Gallop  OLIS Shutdown in progressSupernanogan cart removed from Faraday
cage to dock today. Some beam safety tests
on FC6 in progress presently. FC3 was already
 8x 
  227   Tue Feb 16 16:04:18 2010 Damien Gallop  OLIS Shutdown in progressPreparations for rewiring the DB1/3 optics
have begun. Sgan gas manifold work is in
progress. Note: IOS:MP1 is scheduled for
  
  228   Wed Feb 17 18:28:33 2010 Damien Gallop  OLIS Shutdown in progressMore materials prepared for optics refit.   
  229   Fri Feb 19 17:54:40 2010 Damien Gallop  OLIS Shutdown in progressPartial disassembly of DB1 optics today.
Shielding of insulators is definitely working
and indicated for unshielded insulators.
 DSCN7351.JPGDSCN7355.JPG 
  224   Wed Feb 3 16:30:02 2010 Damien Gallop  OLIS Shutdown began todayWe prepared stuff last night. This morning
we vented IOS to argon, then swiped. Clean.
Lu and Ajit craned out DB3 for us. Nice job,
  
  508   Mon Apr 20 08:09:03 2015 Brian MinatoRoutineGeneralOLIS Shutdown UpdateThe OLIS 1 week shutdown has been completed
(WP 2015-04-13-1).
General-
  
  459   Mon Oct 31 11:06:58 2011 Damien Gallop  OLIS ShutdownTwo weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
 grab.g18922.png 
  460   Tue Nov 1 10:18:02 2011 Damien Gallop  OLIS ShutdownMCIS pumped overnight. Still coming down.  Picture_20.png 
  461   Wed Nov 2 10:16:49 2011 Damien Gallop  OLIS ShutdownMCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
 Picture_21.png 
  462   Thu Nov 3 09:50:05 2011 Damien Gallop  OLIS ShutdownMCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
 Picture_21.png 
  463   Fri Nov 4 09:41:32 2011 Damien Gallop  OLIS ShutdownMCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
 Picture_22.png 
  464   Mon Nov 7 09:58:17 2011 Damien Gallop  OLIS ShutdownIOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
 Picture_2.pngPicture_1.png 
  465   Tue Nov 8 10:02:54 2011 Damien Gallop  OLIS ShutdownSupernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
 Picture_3.pngPicture_4.pngPicture_5.pngPicture_7.pngPicture_6.png 
  466   Wed Nov 9 11:40:35 2011 Damien Gallop  OLIS ShutdownSupernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
 Picture_8.pngPicture_9.png 
  467   Thu Nov 10 09:57:57 2011 Damien Gallop  OLIS ShutdownSupernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
 Picture_3.png 
  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS ProblemsPE set point is ok but read back is half of
the real value.
  