243
|
Tue Apr 13 10:20:27 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Accelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart. |
|
244
|
Wed Apr 14 17:28:32 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was |
|
245
|
Thu Apr 15 09:39:11 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Yesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning. |
|
246
|
Fri Apr 16 09:26:01 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam development through accelerators continues
today. Beam was rock-stable overnight. |
|
247
|
Mon Apr 19 10:11:17 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Development on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump |
|
250
|
Wed Apr 21 15:30:09 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam up as of last evening. Controls performed
some network upgrades today, which impacted
beam operations. One glitch on our side: |
|
251
|
Thu Apr 22 14:57:25 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Accelerator development continued this
morning. Beam from source was reported to
be "good". ICR showed me their |
|
252
|
Fri Apr 23 10:18:32 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Marco and experimenters are busy at it,
tuning the DTL. Regarding the source, he
is "happy as always!" Well, that |
|
309
|
Thu Jul 8 09:38:36 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable. |
|
310
|
Fri Jul 9 10:00:03 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Source drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before |
8x |
311
|
Mon Jul 12 10:55:14 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out |
|
253
|
Mon Apr 26 10:58:46 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Our first experiment of the year started
right around midnight last night, after extensive
tuning. As I understand it, S1151 |
|
254
|
Tue Apr 27 09:04:13 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Nominal beam operation to SEBT2 overnight.
A chart of beam over the last few days is
attached. There is a step change in the separator |
|
255
|
Wed Apr 28 10:08:05 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Beam delivery continued nicely through
the night.
Yesterday Controls repaired and reinstalled |
|
256
|
Thu Apr 29 09:11:27 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Another quiet night of beam to S1151. |
|
257
|
Fri Apr 30 12:58:21 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Delivery to S1151 went quietly overnight
for their last few hours. The run ended at
~08:30 as scheduled. Marco and ICR did some |
|
308
|
Wed Jul 7 15:21:36 2010 |
Damien Gallop | | | 16O1+ for SCC Commissioning | A 16O1+ beam from the MWS is being used
for SCC development and commissioning by
agreement. Some sideshows getting there. |
|
96
|
Thu Jul 16 17:05:29 2009 |
Damien Gallop | | | 16O1+ survey | A/q = 16 Field = 1873.4G FC6 = 204enA |
|
37
|
Tue Jun 30 10:56:26 2009 |
Damien Gallop | Routine | General | 16O2+ emittance scans | The first emittance scan sort of got interrupted;
it auto-restarted just before the previous
scan had finished. I thought the resulting |
6x |
38
|
Tue Jun 30 17:16:25 2009 |
Damien Gallop | Routine | General | 16O2+ emittance scans with slits open | First, with upstream slits opened, then
with both open. Original slit setting was
1mm. Finally, restore slits to 1mm and see |
6x |