OLIS Logbook General
  General, Page 3 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  41   Thu Jul 2 16:55:04 2009 Damien GallopRoutineGeneralRF frequency scans versus each charge state of 16OLet's take a look at varying frequency
versus beam current for 16O2+. Starting RF
values shown below. FC6 = 1.09enA.
 7x 
  28   Mon Jun 22 20:28:37 2009 Damien GallopRoutineGeneralPreparations for 16O2+ deliveryIn anticipation of 16O2+ delivery mid-week,
we checked 16O2+ production from the Supernanogan
source. No problem. We did have to use the
 6x 
  173   Wed Oct 28 09:55:28 2009 Damien Gallop  Planned IOSIOC rebootControls is rebooting IOSIOC. I have inserted
MCIS:FC1 for the duration. Let's see what
comes of it all.
 Picture_1.pngPicture_2.png 
  42   Fri Jul 3 10:03:11 2009 Damien GallopRoutineGeneralOvernight beam stability on FC3Here are some pics and data from total
MCIS beam on FC3 overnight. A bit inconclusive,
but there may be a temperature correlation.
 grab.lB3687.pnggrab.w13197.pngmcis_fc3_090703.datiosfc3_fc6_halltemp.txt 
  479   Fri May 16 08:44:27 2014 Raymond DubéRoutineGeneralOLIS work next weekAttached
is the scheduled work for OLIS next week.
 OLIS-Work-05.pdf 
  230   Thu Mar 11 23:02:18 2010 Keerthi  OLIS status after shutdownMicrowave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
  
  150   Sun Oct 4 19:16:46 2009 Keerthi  OLIS statusSupernanogan is ready with 22Ne+4 for upcoming
CSB run. EL, HV and RF are on. The anlyzing magnet
and the other optics are set for A/Q=5.5.
  
  164   Thu Oct 15 21:06:10 2009 Keerthi  OLIS status33S development is completed.  A 3nA
of 33S+5 can be produced with 10W of RF power
and 2.5mm aperture.
  
  264   Fri May 7 19:10:05 2010 Keerthi JayamannaRoutineGeneralOLIS statusMW source is back and running.
A new vacuum
chamber is added to the Supernanogan RF block.
SO2
is not filled in yet.
  
  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnetKlixon at the OLIS bemding magnet is not
funtioning properly.
  
  220   Wed Jan 13 18:16:22 2010 Damien Gallop  OLIS development with MWS at 28keVWe will be delivering a 28keV beam to the
tuning boys tomorrow for further diagnosis
of the 8pi line. In anticipation, I restarted
 6x 
  188   Wed Nov 18 23:46:14 2009 Keerthi Jayamanna  OLIS development startedAll turbos in the OLIS and MCIS are off.
No controls for the MCIS. Pumps switched
of by pulling the CG cable.
  
  209   Thu Dec 10 08:59:05 2009 Damien Gallop  OLIS development for CUSP source continued Source stayed up quietly overnight. Current
dropped off gradually. I will tweak things
shortly.
 Picture_12.pngPicture_13.png 
  210   Fri Dec 11 18:03:30 2009 Damien Gallop  OLIS development for CUSP source continued Today we swapped power supplies between
the arc and plasma electrode. This gives
us a higher voltage range on the arc, at
  
  212   Tue Dec 15 17:50:38 2009 Damien Gallop  OLIS development for CUSP source continued Four larger apertures were installed yesterday.
This morning we fired up the modified source.
It lit immediately. Plenty of beam. Development
  
  213   Wed Dec 16 14:07:37 2009 Damien Gallop  OLIS development for CUSP source continued Today we vary source gas pressure.
Later... Several iterations of pressure,
tuning and standing on our heads. Representative
 grab.n10208.pnggrab.o10214.pnggrab.G10224.pnggrab.T10230.png 
  214   Fri Dec 18 13:14:01 2009 Damien Gallop  OLIS development for CUSP source continued Yesterday: Busy! Source filment changed
last night. Source pumped overnight. First
start this morning.
 9x 
  206   Mon Dec 7 09:48:24 2009 Damien Gallop  OLIS development for CUSP source continuedThe OLIS cage was open over the weekend.
IOS pressure is in the 4e-7 range, with source
gas manifold closed and external helium bottle
 Picture_4.png 
  207   Tue Dec 8 12:40:17 2009 Damien Gallop  OLIS development for CUSP source continuedFuse for FUG power supply obtained and
installed. Source is up and warming up. ~100enA
on FC6.
 grab.M11379.pnggrab.S11386.png 
  208   Wed Dec 9 10:24:45 2009 Damien Gallop  OLIS development for CUSP source continuedCUSP source was off for the night, following
Keerthi's development. He had increased the
current on FC6 and the arc current substantially.
 grab.k18688.pngPicture_5.pngPicture_6.pngPicture_7.pngPicture_8.png 
ELOG V2.9.2-2455