OLIS Logbook General
  General, Page 3 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectup
  243   Tue Apr 13 10:20:27 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Accelerator commissioning has resumed for the day. Beam was nice and stable overnight. See attached Stripchart.

Attachment 1: Picture_3.png
Picture_3.png
  244   Wed Apr 14 17:28:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam reserved for continuing accelerator development, but there are some ISAC-I RF phase troubles. However, maintenance was not permitted today... until just now. Too late for today.

  245   Thu Apr 15 09:39:11 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Yesterday's RF troubles in ISAC-I are reportedly solved. Beam development is expected to resume this morning.

  246   Fri Apr 16 09:26:01 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam development through accelerators continues today. Beam was rock-stable overnight.

Attachment 1: grab.Ft9922.png
grab.Ft9922.png
  247   Mon Apr 19 10:11:17 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Development on Friday; idle over the weekend. Stripchart attached.

Meanwhile, there was a power bump at around 09:30, and the source went out. Restarted OK.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: grab.a19570.png
grab.a19570.png
  250   Wed Apr 21 15:30:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam up as of last evening. Controls performed some network upgrades today, which impacted beam operations. One glitch on our side: OLIS:MB drive bit was lost. Fault report. Otherwise, all's right with the world, and Sophia has resumed accelerator development.

Attachment 1: Picture_8.png
Picture_8.png
  251   Thu Apr 22 14:57:25 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Accelerator development continued this morning. Beam from source was reported to be "good". ICR showed me their long-term Stripchart of our beam. There is a clear daily correlation of beam intensity with weather. Interesting. Beam idle on FC6 since ~lunchtime. I took the opportunity to do a little magstab development. The server now runs Konstantin's ser2net patch which fixes the USB port name assignments at boot time. This is a common issue in linuxland, it turns out.

  252   Fri Apr 23 10:18:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Marco and experimenters are busy at it, tuning the DTL. Regarding the source, he is "happy as always!" Well, that makes at least two of us. After this segment of tuning is complete, then he will move on to setup for the upcoming S1151 run at SEBT2 on Sunday.

Attachment 1: Picture_4.png
Picture_4.png
  309   Thu Jul 8 09:38:36 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam idle overnight. Source conditioned and changed a bit. Slight tweaking required to bring it back to stable.

Attachment 1: Picture_5.png
Picture_5.png
  310   Fri Jul 9 10:00:03 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Source drifted overnight. Operators made a slight correction to silence an alarm. I have tweaked this up. Shown below are before and after. Marco believes present beam is unstable. I will see if I can tweak up the intensity, and perhaps that will satisfy all requirements.

Later... ~13:00 this is just about as good as it gets. Stripchart of the last couple of hours plus current excellent source parameters appended below.

Attachment 1: Picture_6.png
Picture_6.png
Attachment 2: Picture_7.png
Picture_7.png
Attachment 3: Picture_8.png
Picture_8.png
Attachment 4: Picture_9.png
Picture_9.png
Attachment 5: Picture_10.png
Picture_10.png
Attachment 6: Picture_1.png
Picture_1.png
Attachment 7: Picture_2.png
Picture_2.png
Attachment 8: Picture_3.png
Picture_3.png
  311   Mon Jul 12 10:55:14 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam used sporadically over the weekend. Note temperature response in beam. A power bump occurred at about 10:00, knocking out OLIS. It was challenging to come back to where it was before.

Attachment 1: Picture_1.png
Picture_1.png
  253   Mon Apr 26 10:58:46 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Our first experiment of the year started right around midnight last night, after extensive tuning. As I understand it, S1151 will confirm the age of the universe. The MWS source performed flawlessly over the weekend.

Attachment 1: Picture_1.png
Picture_1.png
  254   Tue Apr 27 09:04:13 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Nominal beam operation to SEBT2 overnight. A chart of beam over the last few days is attached. There is a step change in the separator field right around midnight. Although the archive does not show it, in fact this was adjusted at 23:54 last night.

 

Later...MCISRFIOC PC up again, with many thanks to Shawn @ Controls. The black MCISRFIOC computer, atop of the IOS racks, was found to be dead a few days ago. We originally thought that this was a consequence of last Monday's power bump. However, the attached archive plot suggests that it in fact failed on April 21st. Controls confirmed extensive hardware damage, and rebuilt the machine. It is up again now, and operational as it was before. I ran the MCIS RF and did an RF scan for good measure. It all works.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_3.png
Picture_3.png
Attachment 3: grab.NQ9764.png
grab.NQ9764.png
  255   Wed Apr 28 10:08:05 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Beam delivery continued nicely through the night.

Yesterday Controls repaired and reinstalled the MCISRFIOC computer. It is working well. More details to come.

Attachment 1: Picture_4.png
Picture_4.png
  256   Thu Apr 29 09:11:27 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Another quiet night of beam to S1151.

Attachment 1: Picture_5.png
Picture_5.png
  257   Fri Apr 30 12:58:21 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Delivery to S1151 went quietly overnight for their last few hours. The run ended at ~08:30 as scheduled. Marco and ICR did some EOB checks. Also, a quick EOB emittance scan is attached. There were problems with the beam tune save files, since resolved. Among the last ones are 100430_0918.snapiossebt2 (missing SEBT optics) and 100429_2023.snapiossebt2.

Attachment 1: grab.s30283.png
grab.s30283.png
Attachment 2: grab.Y30291.png
grab.Y30291.png
Attachment 3: grab.z30299.png
grab.z30299.png
  308   Wed Jul 7 15:21:36 2010 Damien Gallop  16O1+ for SCC Commissioning

A 16O1+ beam from the MWS is being used for SCC development and commissioning by agreement. Some sideshows getting there.

Later... At approximately 13:15, some event, a bias spark, it appears, took out a number of devices, most of which IOPS reset. The FUG blew a fuse on startup. Replacement OK. However, there remains an interlock light on the IOS:BIAS panel with no apparently unsatisfied interlocks showing. Controls is checking now (~15:00). Cause appeared to be an old version of a startup script on IOSIOC. The script has been updated so that this particular fault should not recur. Source restarted okay, but it took some doing to get the separator magnet back. It is still not optimized, but Marco can take it from here.

  96   Thu Jul 16 17:05:29 2009 Damien Gallop  16O1+ survey

A/q = 16 Field = 1873.4G FC6 = 204enA

Attachment 1: grab.o17385.png
grab.o17385.png
Attachment 2: grab.G17390.png
grab.G17390.png
Attachment 3: grab.B17394.png
grab.B17394.png
  37   Tue Jun 30 10:56:26 2009 Damien GallopRoutineGeneral16O2+ emittance scans

The first emittance scan sort of got interrupted; it auto-restarted just before the previous scan had finished. I thought the resulting plot was somewhat interesting. The emittance isn't half-bad either. A better scan follows. TACTIC took beam again for a while this afternoon to shake down a timing discrepancy. We got it back around 4pm. One more emittance scan for good measure.

Attachment 1: Picture_25.png
Picture_25.png
Attachment 2: Picture_26.png
Picture_26.png
Attachment 3: grab.hY9483.png
grab.hY9483.png
Attachment 4: grab.YG9487.png
grab.YG9487.png
Attachment 5: grab.Sj9567.png
grab.Sj9567.png
Attachment 6: grab.TZ9576.png
grab.TZ9576.png
  38   Tue Jun 30 17:16:25 2009 Damien GallopRoutineGeneral16O2+ emittance scans with slits open

First, with upstream slits opened, then with both open. Original slit setting was 1mm. Finally, restore slits to 1mm and see if it reproduces. It does.

Attachment 1: grab.PM9871.png
grab.PM9871.png
Attachment 2: grab.uu9884.png
grab.uu9884.png
Attachment 3: grab.Xu9979.png
grab.Xu9979.png
Attachment 4: grab.jO9984.png
grab.jO9984.png
Attachment 5: grab.a10088.png
grab.a10088.png
Attachment 6: grab.H10092.png
grab.H10092.png