453
Wed Oct 19 09:53:27 2011
Damien Gallop
33S from MCIS to HE Development Setup
MCIS configured for 33S+6 yesterday afternoon.
Beam grew nicely overnight. Beam development
expected after source hand-off.
454
Mon Oct 24 10:10:34 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Delivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S
455
Tue Oct 25 09:41:32 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Beam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered
456
Wed Oct 26 10:17:53 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Delivery continued
uneventfully overnight and is continuing.
Later... source is just getting better
457
Fri Oct 28 10:18:53 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Delivery continued overnight.
458
Mon Oct 31 11:04:06 2011
Damien Gallop
33S+6 from MCIS to DRAGON EOB
Deliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS
459
Mon Oct 31 11:06:58 2011
Damien Gallop
OLIS Shutdown
Two weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
460
Tue Nov 1 10:18:02 2011
Damien Gallop
OLIS Shutdown
MCIS pumped overnight. Still coming down.
461
Wed Nov 2 10:16:49 2011
Damien Gallop
OLIS Shutdown
MCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
462
Thu Nov 3 09:50:05 2011
Damien Gallop
OLIS Shutdown
MCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
463
Fri Nov 4 09:41:32 2011
Damien Gallop
OLIS Shutdown
MCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
464
Mon Nov 7 09:58:17 2011
Damien Gallop
OLIS Shutdown
IOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
465
Tue Nov 8 10:02:54 2011
Damien Gallop
OLIS Shutdown
Supernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
466
Wed Nov 9 11:40:35 2011
Damien Gallop
OLIS Shutdown
Supernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
467
Thu Nov 10 09:57:57 2011
Damien Gallop
OLIS Shutdown
Supernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
485
Tue Oct 14 08:31:53 2014
Brian Minato
Other
General
Water Flow Switch #3
This entry was incorrectly added to the
OLIS logbook. it has been moved to
the I3 logbook.
486
Tue Oct 21 07:14:26 2014
Brian Minato
Other
General
OLIS Work
MCIS-
the cart was moved into the HV cage.
The facilities will be connected and an oven
487
Wed Oct 22 07:58:32 2014
Brian Minato
Other
General
MCIS Work
The remaining connections were done on
the MCIS.
A piece of 1/8" teflon was installed
488
Thu Oct 23 10:52:21 2014
Brian Minato
Routine
General
ALGA Amplifier
The ALGA amplifier and its signal generator
have been turned off at the request of Controls.
They have had communication issues and are
489
Fri Oct 24 10:50:20 2014
Brian Minato
Other
Other
OLIS Update
The nitrogen bottle needs to be replaced.