  453   Wed Oct 19 09:53:27 2011 Damien Gallop  33S from MCIS to HE Development SetupMCIS configured for 33S+6 yesterday afternoon.
Beam grew nicely overnight. Beam development
expected after source hand-off.
 Picture_9.png 
  454   Mon Oct 24 10:10:34 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S
 Picture_10.png 
  455   Tue Oct 25 09:41:32 2011 Damien Gallop  33S+6 from MCIS to DRAGONBeam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered
 Picture_12.png 
  456   Wed Oct 26 10:17:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued
uneventfully overnight and is continuing.
Later... source is just getting better
 Picture_13.pngPicture_14.png 
  457   Fri Oct 28 10:18:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued overnight.  Picture_16.png 
  458   Mon Oct 31 11:04:06 2011 Damien Gallop  33S+6 from MCIS to DRAGON EOBDeliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS
 Picture_17.png 
  459   Mon Oct 31 11:06:58 2011 Damien Gallop  OLIS ShutdownTwo weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
 grab.g18922.png 
  460   Tue Nov 1 10:18:02 2011 Damien Gallop  OLIS ShutdownMCIS pumped overnight. Still coming down.  Picture_20.png 
  461   Wed Nov 2 10:16:49 2011 Damien Gallop  OLIS ShutdownMCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
 Picture_21.png 
  462   Thu Nov 3 09:50:05 2011 Damien Gallop  OLIS ShutdownMCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
 Picture_21.png 
  463   Fri Nov 4 09:41:32 2011 Damien Gallop  OLIS ShutdownMCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
 Picture_22.png 
  464   Mon Nov 7 09:58:17 2011 Damien Gallop  OLIS ShutdownIOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
 Picture_2.pngPicture_1.png 
  465   Tue Nov 8 10:02:54 2011 Damien Gallop  OLIS ShutdownSupernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
 Picture_3.pngPicture_4.pngPicture_5.pngPicture_7.pngPicture_6.png 
  466   Wed Nov 9 11:40:35 2011 Damien Gallop  OLIS ShutdownSupernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
 Picture_8.pngPicture_9.png 
  467   Thu Nov 10 09:57:57 2011 Damien Gallop  OLIS ShutdownSupernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
 Picture_3.png 
  485   Tue Oct 14 08:31:53 2014 Brian MinatoOtherGeneralWater Flow Switch #3This entry was incorrectly added to the
OLIS logbook.  it has been moved to
the I3 logbook.
  
  486   Tue Oct 21 07:14:26 2014 Brian MinatoOtherGeneralOLIS WorkMCIS-
the cart was moved into the HV cage. 
The facilities will be connected and an oven
  
  487   Wed Oct 22 07:58:32 2014 Brian MinatoOtherGeneralMCIS WorkThe remaining connections were done on
the MCIS. 
A piece of 1/8" teflon was installed
  
  488   Thu Oct 23 10:52:21 2014 Brian MinatoRoutineGeneralALGA AmplifierThe ALGA amplifier and its signal generator
have been turned off at the request of Controls. 
They have had communication issues and are
  
  489   Fri Oct 24 10:50:20 2014 Brian MinatoOtherOtherOLIS UpdateThe nitrogen bottle needs to be replaced.
 