  214   Fri Dec 18 13:14:01 2009 Damien Gallop  OLIS development for CUSP source continued Yesterday: Busy! Source filment changed
last night. Source pumped overnight. First
start this morning.
 9x 
  188   Wed Nov 18 23:46:14 2009 Keerthi Jayamanna  OLIS development startedAll turbos in the OLIS and MCIS are off.
No controls for the MCIS. Pumps switched
of by pulling the CG cable.
  
  220   Wed Jan 13 18:16:22 2010 Damien Gallop  OLIS development with MWS at 28keVWe will be delivering a 28keV beam to the
tuning boys tomorrow for further diagnosis
of the 8pi line. In anticipation, I restarted
 6x 
  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnetKlixon at the OLIS bemding magnet is not
funtioning properly.
  
  150   Sun Oct 4 19:16:46 2009 Keerthi  OLIS statusSupernanogan is ready with 22Ne+4 for upcoming
CSB run. EL, HV and RF are on. The anlyzing magnet
and the other optics are set for A/Q=5.5.
  
  164   Thu Oct 15 21:06:10 2009 Keerthi  OLIS status33S development is completed.  A 3nA
of 33S+5 can be produced with 10W of RF power
and 2.5mm aperture.
  
  264   Fri May 7 19:10:05 2010 Keerthi JayamannaRoutineGeneralOLIS statusMW source is back and running.
A new vacuum
chamber is added to the Supernanogan RF block.
SO2
is not filled in yet.
  
  230   Thu Mar 11 23:02:18 2010 Keerthi  OLIS status after shutdownMicrowave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
  
  479   Fri May 16 08:44:27 2014 Raymond DubéRoutineGeneralOLIS work next weekAttached
is the scheduled work for OLIS next week.
 OLIS-Work-05.pdf 
  42   Fri Jul 3 10:03:11 2009 Damien GallopRoutineGeneralOvernight beam stability on FC3Here are some pics and data from total
MCIS beam on FC3 overnight. A bit inconclusive,
but there may be a temperature correlation.
 grab.lB3687.pnggrab.w13197.pngmcis_fc3_090703.datiosfc3_fc6_halltemp.txt 
  173   Wed Oct 28 09:55:28 2009 Damien Gallop  Planned IOSIOC rebootControls is rebooting IOSIOC. I have inserted
MCIS:FC1 for the duration. Let's see what
comes of it all.
 Picture_1.pngPicture_2.png 
  28   Mon Jun 22 20:28:37 2009 Damien GallopRoutineGeneralPreparations for 16O2+ deliveryIn anticipation of 16O2+ delivery mid-week,
we checked 16O2+ production from the Supernanogan
source. No problem. We did have to use the
 6x 
  41   Thu Jul 2 16:55:04 2009 Damien GallopRoutineGeneralRF frequency scans versus each charge state of 16OLet's take a look at varying frequency
versus beam current for 16O2+. Starting RF
values shown below. FC6 = 1.09enA.
 7x 
  43   Fri Jul 3 10:29:15 2009 Damien GallopRoutineGeneralRF frequency scans versus each charge state of 16O cont'd.16O2+ beam on FC6 = 10nA as before. Move
to 16O3+ A/q = 5.33...
A frequency scan between 13 &
 grab.Cr7150.pnggrab.yi7257.pnggrab.vt7264.pnggrab.vP7271.png 
  509   Wed Apr 29 07:48:22 2015 Brian MinatoOtherOtherRepair- Water leak inside HV cageA water leak was reported inside the HV
cage (FR#8079).  The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
  
  501   Thu Nov 13 16:31:54 2014 Brian MinatoOtherOtherSISA new SIS source has been installed. 
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
  
  513   Wed Feb 22 21:51:40 2017 Keerthi Jayamanna  SIS first beam is N1+1Chris confirmed the first SIS beam would
be Na+1. Next Rb+1 and then Li+1
  
  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject    
  26   Fri Jun 19 20:15:19 2009 Damien GallopRoutineGeneralSummary of 16On+ emittance scansHere is a list of 16On+ emittance scans
for today. Although IOSIOC got rebooted,
restored tune was identical and trouble-free,
  
  493   Thu Oct 30 22:09:02 2014 Keerthi Jayamanna  Suoernanogan steeringIOS mass scan does not work.