ID
Date
Author
Type
Category
Subject
Text
461
Wed Nov 2 10:16:49 2011
Damien Gallop
OLIS Shutdown
MCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
462
Thu Nov 3 09:50:05 2011
Damien Gallop
OLIS Shutdown
MCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
463
Fri Nov 4 09:41:32 2011
Damien Gallop
OLIS Shutdown
MCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
464
Mon Nov 7 09:58:17 2011
Damien Gallop
OLIS Shutdown
IOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
465
Tue Nov 8 10:02:54 2011
Damien Gallop
OLIS Shutdown
Supernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
466
Wed Nov 9 11:40:35 2011
Damien Gallop
OLIS Shutdown
Supernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
467
Thu Nov 10 09:57:57 2011
Damien Gallop
OLIS Shutdown
Supernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
468
Wed May 23 17:11:57 2012
Keerthi Jayamanna
Changed beam to 12C++ beam
Removed titanium from the back plate and
clean the source.
But left the PE titanium insert since
469
Sun Dec 2 22:32:19 2012
Keerthi Jayamanna
Routine
General
Still cannot write anything other than Subject
470
Sun Dec 2 22:34:09 2012
Keerthi Jayamanna
Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam
471
Sun Dec 2 23:36:13 2012
Keerthi Jayamanna
Routine
General
16O+2 is ready for tuning.
MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
472
Fri Dec 14 17:30:47 2012
Keerthi Jayamanna
18OH2 and 40Ar+2 delivary
During the last week we delivered 18O+2
from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
473
Mon Dec 17 14:08:52 2012
Keerthi Jayamanna
IRIS beam delivary is completed
IRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
474
Mon Dec 17 14:10:22 2012
Keerthi Jayamanna
Gas flow controller fault
Controls group may need some assistance
from OLIS group in order to trouble shoot
the problem.
475
Wed Jan 22 10:34:58 2014
Raymond Dubé
IN-line 100K for IOS:YCB1A removed
Last January 17th 2014 we removed an in-line
resistor (100K 10W) from IOS:YCB1A because
we do not think that it is needed.
476
Thu Jan 23 12:56:14 2014
Raymond Dubé
New & updated drawings for S.S.
I updated
an old drawing ISK4478D (MS & MCIS Optics)
and created 2 new ones: ISK4583D (Electrical
477
Fri Jan 24 09:15:10 2014
Raymond Dubé
New ISK4586D for OLIS with 3 Ion Source
I created
a new drawing: ISK4586D that shows the Optics
for OLIS with 3 Ion Source.
478
Wed Jan 29 12:27:57 2014
Raymond Dubé
OLIS Skimmers BOP & Labels
I updated
2 drawings that show the OLIS skimmers.
A.
479
Fri May 16 08:44:27 2014
Raymond Dubé
Routine
General
OLIS work next week
Attached
is the scheduled work for OLIS next week.
480
Wed Aug 13 15:00:27 2014
Raymond Dubé
Routine
General
OLIS Surface Source broken Ionizer Coil
We spent
most of the day looking at OLIS to find out
why the "Ionizer Coil" keeps breaking