OLIS Logbook General
  General, Page 24 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  256   Thu Apr 29 09:11:27 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Another quiet night of beam to S1151.  Picture_5.png 
  257   Fri Apr 30 12:58:21 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Delivery to S1151 went quietly overnight
for their last few hours. The run ended at
~08:30 as scheduled. Marco and ICR did some
 grab.s30283.pnggrab.Y30291.pnggrab.z30299.png 
  239   Tue Mar 30 10:27:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning16O1+ beam requested yesterday. Source
switched over and beam ready by evening.
Nice overnight Stripchart, attached. Sophia
 Picture_12.png 
  240   Wed Mar 31 09:43:30 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam set up for accelerator commissioning.
Sophia took beam yesterday. Beam idle overnight.
Stripchart of overnight performance attached.
 Picture_13.png 
  241   Thu Apr 1 09:23:08 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam idle overnight. Another night of super-stable
beam. If no users today, then we may take
it for MRO.
 Picture_1.png 
  242   Mon Apr 12 11:53:22 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam was used last week for DRAGON commissioning.
Successful run, completed yesterday, as reported
by Colin this morning.
 Picture_1.pngPicture_2.png 
  243   Tue Apr 13 10:20:27 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningAccelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart.
 Picture_3.png 
  244   Wed Apr 14 17:28:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was
  
  245   Thu Apr 15 09:39:11 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningYesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning.
  
  246   Fri Apr 16 09:26:01 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam development through accelerators continues
today. Beam was rock-stable overnight.
 grab.Ft9922.png 
  247   Mon Apr 19 10:11:17 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningDevelopment on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump
 Picture_1.pnggrab.a19570.png 
  250   Wed Apr 21 15:30:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam up as of last evening. Controls performed
some network upgrades today, which impacted
beam operations. One glitch on our side:
 Picture_8.png 
  251   Thu Apr 22 14:57:25 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningAccelerator development continued this
morning. Beam from source was reported to
be "good". ICR showed me their
  
  252   Fri Apr 23 10:18:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningMarco and experimenters are busy at it,
tuning the DTL. Regarding the source, he
is "happy as always!" Well, that
 Picture_4.png 
  309   Thu Jul 8 09:38:36 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable.
 Picture_5.png 
  310   Fri Jul 9 10:00:03 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningSource drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before
 8x 
  311   Mon Jul 12 10:55:14 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out
 Picture_1.png 
  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
  
  98   Thu Jul 16 17:15:50 2009 Damien Gallop  16/18On+ survey summaryHere is a summary of emittances gleaned
from the aforementioned elog entries.
  
  293   Sat Jun 12 10:20:14 2010 Damien Gallop  15N4+ to TIGRESS doneDelivery to TIGRESS ended this morning
as scheduled. ICR took nice emittance
scans and is completing a target snapshot
 13x 
ELOG V2.9.2-2455