  256   Thu Apr 29 09:11:27 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Another quiet night of beam to S1151.

Attachment 1: Picture_5.png
Picture_5.png
  257   Fri Apr 30 12:58:21 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2

Delivery to S1151 went quietly overnight for their last few hours. The run ended at ~08:30 as scheduled. Marco and ICR did some EOB checks. Also, a quick EOB emittance scan is attached. There were problems with the beam tune save files, since resolved. Among the last ones are 100430_0918.snapiossebt2 (missing SEBT optics) and 100429_2023.snapiossebt2.

Attachment 1: grab.s30283.png
grab.s30283.png
Attachment 2: grab.Y30291.png
grab.Y30291.png
Attachment 3: grab.z30299.png
grab.z30299.png
  239   Tue Mar 30 10:27:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

16O1+ beam requested yesterday. Source switched over and beam ready by evening. Nice overnight Stripchart, attached. Sophia has the beam now.

Attachment 1: Picture_12.png
Picture_12.png
  240   Wed Mar 31 09:43:30 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam set up for accelerator commissioning. Sophia took beam yesterday. Beam idle overnight. Stripchart of overnight performance attached.

Attachment 1: Picture_13.png
Picture_13.png
  241   Thu Apr 1 09:23:08 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam idle overnight. Another night of super-stable beam. If no users today, then we may take it for MRO.

Later... Check out magstab program while we have quiet time. Test outcomes when serial link is opened. Purpose: Improve fault tolerance. Done. Sophia will take the beam shortly.

Attachment 1: Picture_1.png
Picture_1.png
  242   Mon Apr 12 11:53:22 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam was used last week for DRAGON commissioning. Successful run, completed yesterday, as reported by Colin this morning.

Milestone: First coasting beam through new SCC on Thursday, 8-Apr-2010 at ~20:00, using 16O(1+)4+ at 1.5MeV/u from MWS.

This week's agenda: ISAC-II commissioning and development. Maintenance Day either Tuesday or Wednesday.

Later... Marco has been tuning most of the day. He is done for now. I am taking the opportunity to work with the OLIS separator field stability program. It has been offline since at least last week, and no action taken. Attached are present state of things.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_2.png
Picture_2.png
  243   Tue Apr 13 10:20:27 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Accelerator commissioning has resumed for the day. Beam was nice and stable overnight. See attached Stripchart.

Attachment 1: Picture_3.png
Picture_3.png
  244   Wed Apr 14 17:28:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam reserved for continuing accelerator development, but there are some ISAC-I RF phase troubles. However, maintenance was not permitted today... until just now. Too late for today.

  245   Thu Apr 15 09:39:11 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Yesterday's RF troubles in ISAC-I are reportedly solved. Beam development is expected to resume this morning.

  246   Fri Apr 16 09:26:01 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam development through accelerators continues today. Beam was rock-stable overnight.

Attachment 1: grab.Ft9922.png
grab.Ft9922.png
  247   Mon Apr 19 10:11:17 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Development on Friday; idle over the weekend. Stripchart attached.

Meanwhile, there was a power bump at around 09:30, and the source went out. Restarted OK.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: grab.a19570.png
grab.a19570.png
  250   Wed Apr 21 15:30:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam up as of last evening. Controls performed some network upgrades today, which impacted beam operations. One glitch on our side: OLIS:MB drive bit was lost. Fault report. Otherwise, all's right with the world, and Sophia has resumed accelerator development.

Attachment 1: Picture_8.png
Picture_8.png
  251   Thu Apr 22 14:57:25 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Accelerator development continued this morning. Beam from source was reported to be "good". ICR showed me their long-term Stripchart of our beam. There is a clear daily correlation of beam intensity with weather. Interesting. Beam idle on FC6 since ~lunchtime. I took the opportunity to do a little magstab development. The server now runs Konstantin's ser2net patch which fixes the USB port name assignments at boot time. This is a common issue in linuxland, it turns out.

  252   Fri Apr 23 10:18:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Marco and experimenters are busy at it, tuning the DTL. Regarding the source, he is "happy as always!" Well, that makes at least two of us. After this segment of tuning is complete, then he will move on to setup for the upcoming S1151 run at SEBT2 on Sunday.

Attachment 1: Picture_4.png
Picture_4.png
  309   Thu Jul 8 09:38:36 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam idle overnight. Source conditioned and changed a bit. Slight tweaking required to bring it back to stable.

Attachment 1: Picture_5.png
Picture_5.png
  310   Fri Jul 9 10:00:03 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Source drifted overnight. Operators made a slight correction to silence an alarm. I have tweaked this up. Shown below are before and after. Marco believes present beam is unstable. I will see if I can tweak up the intensity, and perhaps that will satisfy all requirements.

Later... ~13:00 this is just about as good as it gets. Stripchart of the last couple of hours plus current excellent source parameters appended below.

Attachment 1: Picture_6.png
Picture_6.png
Attachment 2: Picture_7.png
Picture_7.png
Attachment 3: Picture_8.png
Picture_8.png
Attachment 4: Picture_9.png
Picture_9.png
Attachment 5: Picture_10.png
Picture_10.png
Attachment 6: Picture_1.png
Picture_1.png
Attachment 7: Picture_2.png
Picture_2.png
Attachment 8: Picture_3.png
Picture_3.png
  311   Mon Jul 12 10:55:14 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning

Beam used sporadically over the weekend. Note temperature response in beam. A power bump occurred at about 10:00, knocking out OLIS. It was challenging to come back to where it was before.

Attachment 1: Picture_1.png
Picture_1.png
  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.
MCIS finished xenon development. MCIS is off and isolation valve is shut.
A new oxygen gas line is installed to microwave ion source via a hand valve neat PE.
Hand valve is tuned as a small leak so that the plasma can run with all other gas valves are shut.
However if one need to start the source Ne gas valves are needed to be opened.
A 3.13nA of 16O+2 is sitting at FC6 and ready to use as pilot beam.
  98   Thu Jul 16 17:15:50 2009 Damien Gallop  16/18On+ survey summary

Here is a summary of emittances gleaned from the aforementioned elog entries.

A/q

 Isotope Intensity  Composite  E39% E63% E86% E90% Datafile
2.0 16O8+ 150epA Yes          
2.0 16O8+ 10enA Yes          
2.25 18O8+ 0            
2.25 18O8+ 110enA            
2.2857 16O7+ 70epA            
2.2857 16O7+ 100epA            
2.5714 18O7+ 40epA            
2.5714 18O7+ 50epA            
2.6667 16O6+ 3.0enA   1.61 2.89 4.39 4.6 090716_1505ILTEMIT.txt
2.6667 16O6+ 3.0enA   1.74 3.08 4.64 4.9 090717_1056ILTEMIT.txt
3.0 18O6+ 1.6enA Yes         090716_1519ILTEMIT.txt
3.0 18O6+ 2.2enA Yes 1.53 2.78 4.19 4.39 090717_1014ILTEMIT.txt
3.0 18O6+ 2.9enA Yes 0.422 0.774 1.15 1.2 090715_1430ILTEMIT.txt
3.2 16O5+ 14.5enA   3.58 7.02 12.0 13.0 090716_1535ILTEMIT.txt
3.6 18O5+ 6.2enA   2.77 5.2 8.39 8.98 090716_1543ILTEMIT.txt
3.6 18O5+ 10enA   2.59 4.74 7.49 7.98 090715_1615ILTEMIT.txt
3.6 18O5+ 10enA   2.96 5.53 8.77 9.37 090715_1446ILTEMIT.txt
4.0 16O4+ 54enA  Yes 3.87 7.54 13.2 14.4 090716_1555ILTEMIT.txt
4.5 18O4+ 20enA   3.59 7.04 12.4 13.5 090716_1609ILTEMIT.txt
4.5 18O4+ 24enA   4.05 8.02 14.6 16.0 090716_1411ILTEMIT.txt
5.3333 16O3+ 110enA   3.99 7.83 14 15.4 090716_1626ILTEMIT.txt
6.0 18O3+ 39.3enA  Yes 3.81 7.42 13.1 14.4 090716_1636ILTEMIT.txt
8.0 16O2+ 172enA   4.7 8.74 15.1 16.6 090716_1645ILTEMIT.txt
9.0 18O2+ 55enA   5.1 9.54 17.0 18.7 090716_1700ILTEMIT.tx
16.0 16O1+ 204nA   9.3 16.7 27.2 29.4 090716_1707ILTEMIT.txt
18.0 18O1+ 161nA  Yes 8.05 14.5 23.5 25.4 090716_1715ILTEMIT.txt

 18O4+ restored onto FC6 ~20enA, which seems slightly low.

  293   Sat Jun 12 10:20:14 2010 Damien Gallop  15N4+ to TIGRESS done

Delivery to TIGRESS ended this morning as scheduled. ICR took nice emittance scans and is completing a target snapshot now. Canister still at -22"Hg and MCIS at 7.3e-8 Torr.

Chance to snap some wirescans. Attached.

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_2.png
Picture_2.png
Attachment 3: Picture_3.png
Picture_3.png
Attachment 4: grab.X18646.png
grab.X18646.png
Attachment 5: grab.a18624.png
grab.a18624.png
Attachment 6: grab.b18676.png
grab.b18676.png
Attachment 7: grab.p18697.png
grab.p18697.png
Attachment 8: grab.V18720.png
grab.V18720.png
Attachment 9: grab.N18741.png
grab.N18741.png
Attachment 10: grab.C18766.png
grab.C18766.png
Attachment 11: grab.F18788.png
grab.F18788.png
Attachment 12: grab.g18469.png
grab.g18469.png
Attachment 13: grab.O18473.png
grab.O18473.png