256
|
Thu Apr 29 09:11:27 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Another quiet night of beam to S1151. |
|
257
|
Fri Apr 30 12:58:21 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Delivery to S1151 went quietly overnight
for their last few hours. The run ended at
~08:30 as scheduled. Marco and ICR did some |
  |
239
|
Tue Mar 30 10:27:09 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | 16O1+ beam requested yesterday. Source
switched over and beam ready by evening.
Nice overnight Stripchart, attached. Sophia |
|
240
|
Wed Mar 31 09:43:30 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam set up for accelerator commissioning.
Sophia took beam yesterday. Beam idle overnight.
Stripchart of overnight performance attached. |
|
241
|
Thu Apr 1 09:23:08 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Another night of super-stable
beam. If no users today, then we may take
it for MRO. |
|
242
|
Mon Apr 12 11:53:22 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam was used last week for DRAGON commissioning.
Successful run, completed yesterday, as reported
by Colin this morning. |
 |
243
|
Tue Apr 13 10:20:27 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Accelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart. |
|
244
|
Wed Apr 14 17:28:32 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was |
|
245
|
Thu Apr 15 09:39:11 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Yesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning. |
|
246
|
Fri Apr 16 09:26:01 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam development through accelerators continues
today. Beam was rock-stable overnight. |
|
247
|
Mon Apr 19 10:11:17 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Development on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump |
 |
250
|
Wed Apr 21 15:30:09 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam up as of last evening. Controls performed
some network upgrades today, which impacted
beam operations. One glitch on our side: |
|
251
|
Thu Apr 22 14:57:25 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Accelerator development continued this
morning. Beam from source was reported to
be "good". ICR showed me their |
|
252
|
Fri Apr 23 10:18:32 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Marco and experimenters are busy at it,
tuning the DTL. Regarding the source, he
is "happy as always!" Well, that |
|
309
|
Thu Jul 8 09:38:36 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable. |
|
310
|
Fri Jul 9 10:00:03 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Source drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before |
8x |
311
|
Mon Jul 12 10:55:14 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out |
|
471
|
Sun Dec 2 23:36:13 2012 |
Keerthi Jayamanna | Routine | General | 16O+2 is ready for tuning. | MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave |
|
98
|
Thu Jul 16 17:15:50 2009 |
Damien Gallop | | | 16/18On+ survey summary | Here is a summary of emittances gleaned
from the aforementioned elog entries.
|
|
293
|
Sat Jun 12 10:20:14 2010 |
Damien Gallop | | | 15N4+ to TIGRESS done | Delivery to TIGRESS ended this morning
as scheduled. ICR took nice emittance
scans and is completing a target snapshot |
13x |