153
Wed Oct 7 16:54:33 2009
Keerthi
Today Supernanogan vacuum found to be down in
the morning. Restarted easily.
490
Mon Oct 27 15:13:18 2014
Brian Minato
MCIS-
cleaning out source to remove potassium
and calcium.
510
Thu May 21 09:15:48 2015
Brian Minato
Service of MCIS. Plasma chamber cleaned.
Repaired shorted, Right steering plate.
Added shields to help prevent coating of
446
Mon Oct 3 10:08:50 2011
Damien Gallop
116Sn+18 & 118Sn+19 from MCIS for Development
On Friday there was a request to repeat
some of the findings with tin beams. An agreement
was made to use OLIS for development in lieu
439
Fri Sep 16 10:02:33 2011
Damien Gallop
116Sn+18 & 118Sn+19 from MCIS to TIGRESS
Beam was changed to 14N+2 last evening
for sake of tuning to front of RFQ. Source
was tweaked earlier. Beam is presently set
440
Mon Sep 19 10:27:36 2011
Damien Gallop
116Sn+18 & 118Sn+19 from MCIS to TIGRESS
Delivery continued over the weekend with
some interruptions here and there. A source
intervention was made late last night and
438
Thu Sep 15 12:09:25 2011
Damien Gallop
116Sn+18 & 118Sn+19 from MCIS to TIGRESS Setup
Source switchover began last night after
22:00. There are some 200epA of A/q=6.46
(116Sn+18) on FC6 presently. Setup and tuning
435
Tue Sep 13 10:00:56 2011
Damien Gallop
12C+2 from MCIS to DRAGON
Delivery continued through the night. User
was taking the beam. Recovery from a DTL
tank trip is happening at the moment. Otherwise,
436
Wed Sep 14 10:00:05 2011
Damien Gallop
12C+2 from MCIS to DRAGON
Delivery continues. Nice consistency. See
attached Stripchart. A source switchover
is scheduled for today, tonight, as it turns
437
Thu Sep 15 11:29:39 2011
Damien Gallop
12C+2 from MCIS to DRAGON EOB
Beam delivery was scheduled to end last
evening at 20:30. It was extended to around
22:00, at which point source switchover began.
434
Mon Sep 12 10:07:36 2011
Damien Gallop
12C+2 from MCIS to DRAGON Setup
Setup began around 09:00. 400enA of A/q=6
on FC6 presently.
Later... By ~14:00 beam looks pretty
369
Thu Nov 25 11:50:14 2010
Damien Gallop
12C2+ for Commissioning
Some start-up teething pains last night.
Decision: Go with the Supernanogan for now.
~20enA on FC6. Save: 101125_1148.snapiosdragon.
370
Mon Nov 29 08:55:35 2010
Damien Gallop
12C2+ for Commissioning
Supernanogan is online. MCIS:TP3 is off.
It should be on. It is required for best
production of higher charge states.
371
Tue Nov 30 08:47:47 2010
Damien Gallop
12C2+ for Commissioning
Commissioning and development
continue.
372
Wed Dec 1 08:51:54 2010
Damien Gallop
12C2+ for Commissioning
Continuing from Supernanogan. Source touch-up
last evening.
373
Thu Dec 2 10:02:46 2010
Damien Gallop
12C2+ for Commissioning
Accelerator development continues. Save:
101201_2157.snaiosvault. Today's agenda:
emittance scans. Attached: overnight beam
14x
374
Fri Dec 3 09:37:14 2010
Damien Gallop
12C2+ for Commissioning
Last moments of beam development for SEBT
commissioning. Attached is an FC6 plot and
the present optics and 1mm slits. Decision
15x
363
Mon Nov 8 09:37:03 2010
Damien Gallop
12C2+ for DRAGON
The 85/87Rb run from the MWS ended last
evening as scheduled. The Supernanogan source
was brought online (~21:30 Sunday?) and a
364
Tue Nov 9 08:42:38 2010
Damien Gallop
12C2+ for DRAGON
A good 12C2+ beam was established yesterday
from the Supernanogan source, driven by background
pressure only; no source gas actively injected.
365
Wed Nov 10 09:18:31 2010
Damien Gallop
12C2+ for DRAGON
12C2+ beam established yesterday from the
Supernanogan. Tuning to DRAGON began last
evening and is continuing presently.