153
|
Wed Oct 7 16:54:33 2009 |
Keerthi | | | | Today Supernanogan vacuum found to be down in
the morning. Restarted easily. |
|
152
|
Tue Oct 6 15:28:31 2009 |
Keerthi | | | OLIS A/Q changed to 5 (20Ne+4) | Changed OLIS A/Q to 5 (20Ne+4) to satisfy
the CSB and ISAC development changes. 8nA
is sitting at the FC6 |
|
151
|
Tue Oct 6 15:22:43 2009 |
Damien Gallop | | | 22Ne4+ & 20Ne4+ operation | Over the weekend, Keerthi had set up 22Ne4+
to FC6 for the purpose of developing a tune
matched with a similar tune from the CSB. |
|
150
|
Sun Oct 4 19:16:46 2009 |
Keerthi | | | OLIS status | Supernanogan is ready with 22Ne+4 for upcoming
CSB run. EL, HV and RF are on. The anlyzing magnet
and the other optics are set for A/Q=5.5. |
|
149
|
Fri Oct 2 15:58:36 2009 |
Keerthi | | | 17O and Ne gases are now connected | A 1e-5 atm.cc/sec of 17O leak and
a 1e-6 atm.cc/sec of neon leak are connected
to the source through center tube of the |
|
148
|
Fri Oct 2 09:38:26 2009 |
Keerthi | Routine | General | 33Sulfur development completed successfully. |
Sulfur-33
development completed successfully.
|
|
147
|
Wed Sep 30 15:30:04 2009 |
Damien Gallop | | | 33S6+ from MCIS for DRAGON setup | Beam is stable enough to let Marco set
up something to DRAGON. We are a couple of
days early. |
|
146
|
Mon Sep 28 14:16:47 2009 |
Damien Gallop | | | MCIS Cart down for TP1 Replacement | We are taking the opportunity to replace
TP1 today. Edi Dalla Valle is on it. Also,
Diagnostics has a WP in the queue for looking |
|
145
|
Mon Sep 28 14:12:17 2009 |
Damien Gallop | | | 33S5+ from MCIS on Friday 25-Sep-2009 | A sustained 33S5+ beam was generated in
the Supernanogan on Friday, September 25th.
Attached is a trar plot. |
|
144
|
Wed Sep 16 18:14:29 2009 |
Damien Gallop | | | Test scans for publication 2 | 090916_1206ILTEMIT.txt
Graphics with "color" in
the filename will look in print the same |
19x |
143
|
Wed Sep 16 12:48:13 2009 |
Keerthi | | | 17O+5 double peaks | 090916_1242ILTEMIT.txt 17O+5 has
two peaks.
090916_1355ILTEMIT.txt Repeat |
|
142
|
Wed Sep 16 12:26:51 2009 |
Keerthi | Routine | General | 17O+3 emittance with changed steering | 090916_1222ILTEMIT.txt Changed the
MCIS steering to center the beam in the EL.
17O+3 ~5uA, 50x100 |
|
141
|
Wed Sep 16 12:20:10 2009 |
Keerthi | | | 17O+3 emittance with increased EL | 090916_1215ILTEMIT.txt
EL increased, ~4.5uA, emittance increases,
50x100 17O+3 |
|
140
|
Wed Sep 16 12:12:04 2009 |
Keerthi | Routine | General | 17O+3 emittance sacns | 090916_1156ILTEMIT.txt
17O+3 good settings 50x100 ,
333nA Scale, ~4uA |
|
139
|
Tue Sep 15 20:02:46 2009 |
Keerthi | | | 17O8+ on FC6 from MCIS | 0.4nA of 17O+8 is sitting on FC6. Development
will continue tomorrow. |
|
138
|
Tue Sep 15 19:46:21 2009 |
Keerthi | Routine | General | Supernanogan emittance scans | 090915_1915ILTEMIT.txt = 17O +3, 4.4uA
new tune, scanner offset +10V, scanner
scale 100nA , 100x50 matrix |
9x |
137
|
Tue Sep 15 16:56:03 2009 |
Damien Gallop | | | Test scans for publication | Here are pix of the same scan: original,
then greyscale, then cropped, using The GIMP.
Not bad. |
|
136
|
Tue Sep 15 16:09:31 2009 |
Damien Gallop | | | MCIS Development 17O emittance scans | We noticed a double peak effect in the
16O3+ scan. I will set up the line for 17O3+
and see. |
13x |
135
|
Tue Sep 15 10:32:39 2009 |
Damien Gallop | | | MCIS Development | So. We are preparing for a few days of
Supernanogan development. The present run
plan is to obtain good emittance scans for |
7x |
134
|
Tue Sep 15 09:54:22 2009 |
Damien Gallop | | | 16O3+ run to DRAGON ended on schedule at 08:00 | The DRAGON run ended uneventfully. (That's
a good thing.) I ran a few emittance scans
on the beam as-is. It is clearly monoisotopic. |
8x |