330
|
Mon Aug 9 10:38:43 2010 |
Damien Gallop | | | 4He1+ Setup for SCC Development |
We have a request for changing over the source to 4He1+ operation from the MWS.
Later... OLIS opened. Canister purged with N2 and pumped via IOS, then valved off and disconnected. ICR has restored a recent 4He1+ tune. |
331
|
Tue Aug 10 09:30:36 2010 |
Damien Gallop | | | 4He1+ for SCC Development |
Beam idle overnight, and grew nicely. Source tweaked up and throttled back a little while ago. SCC development expected to continue today. |
332
|
Wed Aug 11 10:35:03 2010 |
Damien Gallop | | | 4He1+ for SCC Development |
Beam used into last evening, then idle overnight. Nice and stable. Maintenance Day for the cyclotron and ISAC. |
333
|
Fri Aug 13 09:27:49 2010 |
Damien Gallop | | | 4He1+ for SCC Development |
MWS is running nicely. SCC development continues. This is scheduled to end on this coming Tuesday morning. It will likely continue for a couple of days, after which there would be a beam switch to 16O2+ from the MWS for TUDA-II setup. |
334
|
Fri Sep 10 10:38:13 2010 |
Damien Gallop | | | 16O3+ for DRAGON |
|
335
|
Tue Sep 14 09:18:28 2010 |
Damien Gallop | | | MCIS Development |
The 16O3+ DRAGON run just finished. MCIS Development begins this morning for a few days. The goal is to install and characterize the new sputter ion source.
Below are vacuum pics before and after closing MCIS:IV0. There was a bit of a spike during closing. All three turbos switched off. TP3 is down now.
Later... Keerthi requests we look at 16O7+ production as a measure of source performance. Done. Chart appended below, with source panels. Mass scan next. |
336
|
Thu Sep 16 17:06:22 2010 |
Damien Gallop | | | MCIS Development |
A new sputter source was installed onto the Supernanogan. A wire of Au is installed in the source. Mass scans this morning with source at equipotential. Source patched to MWS EE supply and biased to ~1kV tunable. That makes a significant improvement in intensity. Beam at FC6 is 197Au24+ presently. |
337
|
Fri Sep 17 14:02:29 2010 |
Damien Gallop | | | MCIS Development |
Today's agenda: RF frequency scans and generally getting a feel for the new sputter source.
Mass scan plots in region of 197Au25+ attached below, taken with and without the sputter source on. Matlab post-processed pics to come shortly. |
338
|
Mon Sep 20 09:34:44 2010 |
Damien Gallop | | | 4He1+ for DRAGON |
MCIS Development finished Friday evening. OLIS switched to MWS operation and setup began for 4He1+ delivery to DRAGON. Beam handed over to experiment last night. |
339
|
Thu Sep 23 09:20:34 2010 |
Damien Gallop | | | 4He1+ for DRAGON |
DRAGON continues to take MWS beam.
Later... 14:00 EOB. Prepare for Mini-Shutdown. |
340
|
Fri Sep 24 13:22:00 2010 |
Damien Gallop | | | OLIS Maintenance and Development |
Supernanogan on overnight, in the search for gold. A trace of 197Au34 observed this morning. Development continues.
A/q: 5.7941
FC6: ~500epA
Bias: 10,876V
EL: 4274V
Sputter source bias: 1262V
RF frequency: 13.60175 GHz
RF amplitude: 10dB (~16W FP)
MCIS:IG1: 6.8e-8 Torr |
341
|
Mon Oct 4 09:40:30 2010 |
Damien Gallop | | | OLIS Maintenance and Development completed |
The September Mini-Shutdown is now a memory. The few days available to OLIS were used for MCIS Development on 197Au. Productive. A 197Au34+ beam sat on FC6 overnight. The program ended Friday, at which point a 20Ne1+ beam from the MWS was established, and line tuning commenced. |
342
|
Mon Oct 4 09:46:12 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for TIGRESS setup |
A 20Ne1+ beam from the MWS was established on Friday. Line tuning began Friday evening. A tune to the front of the SC LINAC was in place by Saturday. Tuning through was delayed by SC tank conditioning.When the LINAC is ready, tuning to TIGRESS will resume, expected today. |
343
|
Fri Oct 8 09:35:03 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for TIGRESS |
Beam from MWS quietly sitting on FC6 awaiting tune checks to TIGRESS. Next experiments up are 26Alg5+ to TUDA and 24Na5+ to TIGRESS. So we are poised for source switchover to provide 24/26Mg pilot beams from the MWS. |
344
|
Tue Oct 12 13:25:21 2010 |
Damien Gallop | | | MWS switchover for scheduled 24/26Mg beams |
Source switchover in progress on WP#2010-10-12-1. Magnesium material installed into MWS. Pumpdown in progress. Leakup rate OK. Turbos on.
Later... Pumping going well. at 1e-6 by ~16:00. |
345
|
Wed Oct 13 16:15:03 2010 |
Damien Gallop | | | MWS switchover for scheduled 24/26Mg beams |
Source conditioning most of today, to 59kV. Striptool attached. Reset to 26Mg tune at ~16:00. |
346
|
Fri Oct 15 09:23:03 2010 |
Damien Gallop | | | MWS switchover for scheduled 24/26Mg beams |
Source is running nicely. Hand-off to ICR occurred ~Wednesday night. Setup done overnight. 26Mg (PE is now on at nominal value) is selected presently; blue trace on Stripchart. |
347
|
Mon Oct 18 09:22:35 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II |
MWS is producing 26Mg, presently parked. It was used over the weekend for TUDA tuning. |
348
|
Tue Oct 19 09:20:40 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II |
MWS operating nicely. |
349
|
Wed Oct 20 11:30:32 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II |
MWS ran fine overnight. It was shut off this morning to investigate bias sparking issue, noted on FR#4894. The two MCIS turbopump controllers are displaying gibberish on their front panels this morning. There was one spark since yesterday, around 19:15 last evening. Due to a failure at ITW - see here and here, a proposal is made to deliver 26Mg to the experiment for data. |