OLIS Logbook General
  General, Page 18 of 26  Not logged in ELOG logo
Entry  Fri Jul 9 10:00:03 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning 8x
Source drifted overnight. Operators made a slight correction to silence an alarm. I have tweaked this up. Shown below are before and after. Marco believes
present beam is unstable. I will see if I can tweak up the intensity, and perhaps that will satisfy all requirements.
Later... ~13:00 this is just about as good as it gets. Stripchart of the last couple of hours plus current excellent source parameters appended
Entry  Mon Jul 12 10:55:14 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning Picture_1.png
Beam used sporadically over the weekend. Note temperature response in beam. A power bump occurred at about 10:00, knocking out OLIS. It was challenging
to come back to where it was before.
Entry  Tue Jul 13 18:33:04 2010, Damien Gallop, , , OLIS Maintenance and Development 
A source switchover day was negotiated, with a goal to provide 12C2+ beam. As a practical matter, it's been an OLIS Maintenance Day, at least for the
morning. Controls installed a cable to provide remote reset capability for the OLIS Enable interlock panel. However, it did not perform as expected first
time, so Controls has elected to pursue this another time. Meanwhile, the remote cable is at the rear of the OLIS Enable panel, ready to be connected next
Entry  Wed Jul 14 09:23:19 2010, Damien Gallop, , , 12C2+ for TIGRESS Picture_1.png
OLIS is set up for 12C2+ delivery, with about 13enA on FC6 from the Supernanogan source presently. Beam was reasonably stable overnight, and should condition
out better over time as well. Initial tuning into ISAC-I is planned to begin this morning.
Entry  Fri Jul 16 10:22:35 2010, Damien Gallop, , , 12C2+ for TIGRESS Picture_1.png
Tuning to TIGRESS is continuing. There is a full expectation that they will take RIB over the weekend.
As it stands, the beam schedule shows switchover from TIGRESS to TITAN on Sunday evening. For a couple of reasons, it would make sense to move
that time into Monday or so.
Entry  Mon Jul 19 10:56:53 2010, Damien Gallop, , , 12C2+ for TIGRESS Picture_2.png
Beam from the Supernanogan remains on standby for TIGRESS pilot beam. There were a couple of source trips over the weekend, at least one a consequence
of a power bump that took out a few other things too.
We have had a couple of pending work permits in the queue for a while. One is for germanium beam development,
Entry  Tue Jul 20 09:38:45 2010, Damien Gallop, , , OLIS Maintenance Picture_3.png
Our work permit to leakcheck the Supernanogan and IOS was signed this morning. The source is off presently, and work is underway. The 12C2+ beam was
not used overnight.
Entry  Thu Jul 22 09:25:21 2010, Damien Gallop, , , 74Ge1+ to TITAN Picture_3.png
The Supernanogan is producing 74Ge using the heater source, a first for the Supernanogan.
Development done over the last couple of days and completed
yesterday. Tuning using mass 76 (76Ge or 76Se?)
Entry  Fri Jul 23 13:00:04 2010, Damien Gallop, , , 74Ge1+ to TITAN Picture_4.pngPicture_3.png
Beam remained on FC6 overnight. Beam was used for a tune check this morning. At noon today beam was switched to 4He.
Later... Outcome of 4He development with Supernanogan: beam comes with other isotopes. e.g. 12C3+ and 16O4+. Verdict: 4He1+ beam is better produced
with the MWS.
Entry  Mon Jul 26 09:41:46 2010, Damien Gallop, , , 74Ge1+ to TITAN 
Beam is sitting on FC6 presently. Good source operation over the weekend. Some pics to come. RIB delivery to TITAN ended at 08:30 this morning. OLIS
is scheduled for a beam switch tomorrow morning.
Later... A power bump knocked us out
Entry  Tue Jul 27 08:55:49 2010, Damien Gallop, , , OLIS Maintenance Picture_4.pngPicture_5.pngPicture_6.png
Today we switch from 74Ge1+ to 4He1+, about as wide a switch as we've done at OLIS. We will use the MWS for the 4He.
Later... sources lit. First mass scan attached. Intensity is pretty low for now.
Later... MWS optimized better. Optimal He gas pressure is somewhere between zero and the leakthrough rate on the flow controller set at zero. Stripchart
Entry  Wed Jul 28 09:23:57 2010, Damien Gallop, , , 4He1+ for TIGRESS Picture_1.png
Source switchover went quite well yesterday morning. About 6nA of beam on FC6. Beam idle overnight. Tuning has resumed now.
Entry  Thu Jul 29 15:31:21 2010, Damien Gallop, , , 4He1+ for TIGRESS 
Beam in use intermittently.
Entry  Thu Jul 29 18:12:38 2010, Damien Gallop, , , 16O3+ Setup 6x
So... the long-awaited word to switch OLIS beams and sources finally came through... at 17:45.
Luverly. Anyway, we're on it. Basic idea: 4He1+/MWS -> 16O3+/MCIS. Users only care about A/q being as close to 72/13 as possible using standard beams.
Last moments of 4He beam shown below. MWS is running very nicely.
Entry  Fri Jul 30 09:09:35 2010, Damien Gallop, , , 16O3+ for TIGRESS Picture_4.pngPicture_5.pngPicture_6.pngPicture_7.png
Supernanogan is online. Setup done last night. There is room for tweaking, but stable 3enA on FC6 of 16O3+ presently. We'll see if ICR has room for tweaking
before handover to users. Yes, we have clearance.
MCIS RF scan in progress.
Entry  Tue Aug 3 09:31:30 2010, Damien Gallop, , , 16O3+ for TIGRESS Picture_9.png
Beam idle for most of the weekend. Some ion source ups and downs, in part due to a WFB setting on the edge. Tuning began last evening. Some funny business
overnight with apparently disappearing and returning beam.
Entry  Thu Aug 5 17:47:04 2010, Damien Gallop, , , 16O3+ for TIGRESS EOB Tuesday a.m. 16O3_for_TIGRESS.png
Delivery of 16O3+ for TIGRESS "buddy beam" purposes ended early Tuesday morning,
followed by CSB setup as an ion source Tuesday day. MWS behaved very nicely. Beam off Wednesday morning for switchover.
Entry  Thu Aug 5 18:56:48 2010, Damien Gallop, , , 35Cl2+ setup for DRAGON 
OLIS off Wednesday morning for source changeover from 16O3+ to 35Cl2+. We have elected to use the MWS for this run. Supernanogan is removed from OLIS
and parked at its service dock. Lots of leakchecking done on both sources. Both sources are under high vacuum presently and improving. MWS will be ready
to start in the morning.
Entry  Fri Aug 6 09:50:22 2010, Damien Gallop, , , 35Cl2+ setup for DRAGON 6x
First beam appearing on FC6 presently, after the source pumped overnight. Source gas valving set up earlier this morning.
Later... We have a whopping 5nA of 35Cl1+. We expect orders of magnitude more. Mass scans and investigation in progress.
Later... Another scan after some source gas changes. Much better. 35Cl+1 = 575nA 35Cl+2 = 3.5pnA with 1mm slits.
Entry  Mon Aug 9 09:09:36 2010, Damien Gallop, , , 35Cl2+ for DRAGON Picture_24.png35Cl2_Startup.png
Beam ran quietly over the weekend, with the anticipated intensity drop-off. Source gas canister at ~15"Hg and IOS at 3.3e-7 presently. Several DRAGON
energy changes were done as planned.
Later... at ~09:45 DRAGON is done.